[1] 王 斌,张静玄,史庆轩,等.装配式混凝土剪力墙结构接缝连接研究进展[J].建筑科学与工程学报,2024,41(1):15-30.
WANG Bin, ZHANG Jingxuan, SHI Qingxuan, et al. Research progress on joint connection of precast concrete shear wall structures[J]. Journal of Architecture and Civil Engineering, 2024, 41(1): 15-30.
[2]KURAMA Y C, SRITHARAN S, FLEISCHMAN R B, et al. Seismic-resistant precast concrete structures: state of the art[J]. Journal of Structural Engineering, 2018, 144(4): 03118001.
[3]杨海军,纪 萌,付素娟,等.套筒灌浆缺陷影响下的装配整体式混凝土剪力墙抗震性能分析[J].工业建筑,2023,53(3):139-145,71.
YANG Haijun, JI Meng, FU Sujuan, et al. Experimental study on the effects of grout defects on the seismic performance of PC shear walls[J]. Industrial Construction, 2023, 53(3): 139-145, 71.
[4]薛 亮,孙千伟,任晓丹,等.考虑套筒灌浆随机缺陷的装配式剪力墙结构可靠度评估[J].地震工程与工程振动,2024,44(1):14-24.
XUE Liang, SUN Qianwei, REN Xiaodan, et al. Reliability assessment of assembled shear wall structures considering stochastic defects in sleeve grouting[J]. Earthquake Engineering and Engineering Vibration, 2024, 44(1): 14-24.
[5]刘全威,吴 涛,成 然.预留孔钢筋浆锚搭接试验研究及可靠度分析[J].硅酸盐通报,2018,37(4):1324-1331.
LIU Quanwei, WU Tao, CHENG Ran. Experimental research and reliability analysis on grout-filled lap splice[J]. Bulletin of the Chinese Ceramic Society, 2018, 37(4): 1324-1331.
[6]倪韦斌,张 旭,王少杰,等.不同轴压比下浆锚连接装配式异形柱框架结构的抗震性能试验研究[J].中南大学学报(自然科学版),2022,53(7):2719-2732.
NI Weibin, ZHANG Xu, WANG Shaojie, et al. Experimental study on seismic performance of precast concrete frame structure with specially shaped column of grouting connection at different axial compression ratios[J]. Journal of Central South University(Science and Technology), 2022, 53(7): 2719-2732.
[7]石 棚,王 浩,柳家为,等.钢筋插入式波纹管浆锚连接受力性能数值分析[J].哈尔滨工程大学学报,2021,42(6):810-817.
SHI Peng, WANG Hao, LIU Jiawei, et al. Numerical analysis of anchorage properties of grouting connection of pre-buried bellows with steel bars inserted[J]. Journal of Harbin Engineering University, 2021, 42(6): 810-817.
[8]陈 俊,蒋恩浩,刘艳芝,等.预埋波纹管浆锚高强锚栓抗拔性能试验研究[J].建筑钢结构进展,2019,21(6):16-23,134.
CHEN Jun, JIANG Enhao, LIU Yanzhi, et al. Experimental study on pull-out performance of high-strength anchor bolt of embedded corrugated sleeve with grout[J]. Progress in Steel Building Structures, 2019, 21(6): 16-23, 134.
[9]吴东岳,沈梦滢,孙崇芳,等.浆锚连接装配式剪力墙拼缝水平相对滑移影响规律[J].施工技术,2019,48(3):36-40.
WU Dongyue, SHEN Mengying, SUN Chongfang, et al. Influence principles of grouted connecting prefabricated shear wall joint interface slip[J]. Construction Technology, 2019, 48(3): 36-40.
[10]汤 磊,郭正兴,周恩泉.浆锚搭接连接装配式联肢剪力墙抗震性能试验研究[J].建筑结构,2022,52(19):112-117.
TANG Lei, GUO Zhengxing, ZHOU Enquan. Experimental study on seismic performance of assembled coupled shear wall with lap joints[J]. Building Structure, 2022, 52(19): 112-117.
[11]ZHI Q, KANG L Q, JIA L, et al. Seismic performance of precast shear walls prestressed via post-tensioned high strength bars placed inside grouted corrugated pipes[J]. Engineering Structures, 2021, 237: 112153.
[12]陈 昕,李家旭,杨永生,等.预埋波纹管单排钢筋浆锚连接的预制剪力墙抗震性能研究[J].沈阳建筑大学学报(自然科学版),2021,37(5):814-822.
CHEN Xin, LI Jiaxu, YANG Yongsheng, et al.Research on seismic performance of precast shear wall connected by embedded corrugated pipe and single row of steel bars[J]. Journal of Shenyang Jianzhu University(Natural Science), 2021, 37(5): 814-822.
[13]陈 昕,侯世伟,刘 明,等.预埋波纹管钢筋约束浆锚连接的预制剪力墙有限元分析[J].沈阳建筑大学学报(自然科学版),2022,38(3):452-460.
CHEN Xin, HOU Shiwei, LIU Ming, et al. Finite element analysis of precast shear walls connected by pre-embedded corrugated pipes and restrained grouting-anchor of steel bars[J]. Journal of Shenyang Jianzhu University(Natural Science), 2022, 38(3): 452-460.
[14]XUE W C, HUANG Q, NIU P Y. Reversed cyclic tests on precast concrete shear walls with grouted corrugated metallic duct connections[J]. Engineering Structures, 2022, 256: 113948.
[15]BI Y, YAO Z Q, QIN Y J, et al. Seismic performance of precast concrete shear walls based on grouted corrugated metallic duct hybrid connection[J]. Construction and Building Materials, 2024, 450: 138576.
[16]FENG J, LI Y Y, WU H Y, et al. Seismic behavior of precast shear wall with novel bundled connections[J]. Case Studies in Construction Materials, 2023,18: e02098.
[17]FENG J, YU Z H, LIU G, et al. Evaluation of the seismic performance of novel bundled connections precast shear walls under cyclic loading[J]. Structural Concrete, 2024, 25(3): 1953-1967.
[18]王 俊,田春雨,杨思忠,等.预埋波纹管纵肋叠合剪力墙抗震性能试验研究[J].建筑结构,2023,53(21):72-77,100.
WANG Jun, TIAN Chunyu, YANG Sizhong, et al. Experimental study on seismic behavior of superposed shear wall with rib embedded corrugated pipe[J]. Building Structure, 2023, 53(21): 72-77, 100.