[1] JTJ 024-94,公路隧道施工技术规范[S].
JTJ 024-94,Code for Construction Technique of Highway Tunnel[S].
[2]TBJ 108-92,铁路隧道喷锚构筑法技术规则[S].TBJ 108-92,Shotcrete-Bolt Construction Method
Precept of Railway Tunnel[S].
[3]关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
GUAN Bao-shu.Construction Points Outline of Tunnel Engineering[M].Beijing:China Communications
Press,2003.
[4]王建宇.隧道工程监测和信息化设计原理[M].北京:中国铁道出版社,1990.
WANG Jian-yu.Monitoring Measurement of Tunnel Engineering and Design Principle for
Information[M].Beijing:China Railway Publishing House,1990.
[5]刘宝有.钢弦式传感器及其应用[M].北京:中国铁道出版社,1986.
LIU Bao-you.String Wire Sensor and Its Application[M].Beijing:China Railway Publishing
House,1986.
[6]肖林萍,赵玉光,李永树.单拱大跨隧道信息化施工监控量测技术研究[J].中国公路学报,2005,18(4):62-
66.
XIAO Lin-ping,ZHAO Yu-guang,LI Yong-shu.Research on Field Monitor Measuring Techniques in
Informational Construction of Single Arch Long-Span Tunnel[J].China Journal of Highway and
Transport,2005,18(4):62-66.
[7]李晓红.隧道新奥法及其量测技术[M].北京:科学出版社,2002.
LI Xiao-hong.New Austrian Tunneling Method for Tunnel and Its Gauging Techniques
[M].Beijing:Science Press,2002.
[8]夏才初.地下工程测试理论与监测技术[M].上海:同济大学出版社,1999.
XIA Cai-chu.Testing Theory and Monitoring Measurement Techniques of Underground Engineering
[M].Shanghai:Tongji University Press,1999.
[9]陈建勋.秦岭终南山特长公路隧道施工监控量测报告[R].西安:长安大学,2003.
CHEN Jian-xun.The Construction Monitoring Measurement Report of Qinling Zhongnanshan Super-
Long Highway Tunnel[R].Xi'an:Chang'an University,2003.