|本期目录/Table of Contents|

[1]陈建勋,杨忠,袁雪戡.秦岭终南山特长公路隧道大埋深段施工监测及分析[J].建筑科学与工程学报,2006,23(03):71.
 CHEN Jian-xun,YANG Zhong,YUAN Xue-kan.Construction Monitoring and Measuring in Segments of Large Embedded Depth in Qinling Zhongnanshan Super-Long Highway Tunnel[J].Journal of Architecture and Civil Engineering,2006,23(03):71.
点击复制

秦岭终南山特长公路隧道大埋深段施工监测及分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
23卷
期数:
2006年03期
页码:
71
栏目:
出版日期:
2006-09-20

文章信息/Info

Title:
Construction Monitoring and Measuring in Segments of Large Embedded Depth in Qinling Zhongnanshan Super-Long Highway Tunnel
作者:
陈建勋1,杨忠2,袁雪戡2
1. 长安大学 桥梁与隧道陕西省重点实验室,陕西 西安 710064; 2. 陕西秦岭终南山公路隧道有限责任公司,陕西 西安 710054
Author(s):
CHEN Jian-xun1, YANG Zhong2, YUAN Xue-kan2
1. Key Laboratory for Bridge and Tunnel of Shaanxi Province, Chang'an University, Xi'an 710064, Shaanxi, China; 2. Shaanxi Qinling Zhongnanshan Highway Tunnel Ltd, Xi'an 710054, Shaanxi, China
关键词:
特长公路隧道 大埋深 监控量测 钢架 变形
Keywords:
super-long highway tunnel large embedded depth monitoring and measuring steel frame distortion
分类号:
U451.2
DOI:
-
文献标志码:
A
摘要:
为了探讨在大埋深、软弱围岩条件下,隧道围岩变形、围岩压应力和支护结构的力学特征,采用SWJ-Ⅳ型收敛计、振弦式土压力盒等测试元件,对秦岭终南山特长公路隧道埋深大于1 200 m的Ⅲ类围岩地段,进行了净空收敛变形、围岩压应力、喷射混凝土应力、钢架应变、锚杆轴力等监控量测。结果表明,即使是在初期支护作用下,净空收敛的量值和速率在测试初期也是很大的; 初期支护受力很大,特别是钢架内、外缘均处于受压状态,而且钢架大部分均超过钢材的屈服极限,钢架处于失稳状态; 采用Ⅰ16型钢钢架(间距1榀·m-1)、3.5 m锚杆和20 cm喷射混凝土支护,其支护强度是不够的,应采取减小型钢钢架间距[改为3榀·(2 m)-1]等措施予以加强; 施工中喷射混凝土必须及时、饱满,才能保证锚喷网钢架共同作用,否则会引起钢架变形很大,甚至导致塌方事故的发生。
Abstract:
To discuss the mechanical characteristics of tunnel surrounding rock distortion, surrounding rock pressure stress and supporting structure when tunnel was under the conditions of large embedded depth and weak surrounding rock, authors took some testing organs, such as SWJ-Ⅳ type convergence indicator, vibrational chord type soil pressure cell, etc. In Ⅲ class surrounding rock segments with embedded depth more than 1 200 m in Qinling Zhongnanshan super -long highway tunnel, those monitoring and measuring as net convergence distortion,surrounding rock pressure stress, sprayed concrete stress, steel frame strain and axial force of anchor bar were made. The results show that tunnel in conditions of large embedded depth and weak surrounding rock can produce large distortion, even if on the effect of primary support, the measured value and speed of convergence are still large; the stress in primary support is very large especially in profiled bar steel frame, the inner and outside edge of steel frame are in stress condition and most steel frame stresses exceed steel yield limit, the steel stress in unstable condition; the support like Ⅰ16 profiled bar steel frame(space between 1 set· m-1), 3.5 m length rock bolts and 20 cm depth sprayed concrete are not enough in that segments; the supporting strength should be consolidated through some measures, such as reducing the space between steel frame[reduce to 3 set·(2 m)-1] and so on; sprayed concrete should be made in time and full in construction, then it can ensure rock bolts, sprayed concrete, bar mat reinforcement and steel frame in chorus, if not, the distortion of steel frame would be large and collapse accidents may happen indeed.

参考文献/References:

[1] JTJ 024-94,公路隧道施工技术规范[S]. JTJ 024-94,Code for Construction Technique of Highway Tunnel[S].
[2]TBJ 108-92,铁路隧道喷锚构筑法技术规则[S].TBJ 108-92,Shotcrete-Bolt Construction Method Precept of Railway Tunnel[S].
[3]关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003. GUAN Bao-shu.Construction Points Outline of Tunnel Engineering[M].Beijing:China Communications Press,2003.
[4]王建宇.隧道工程监测和信息化设计原理[M].北京:中国铁道出版社,1990. WANG Jian-yu.Monitoring Measurement of Tunnel Engineering and Design Principle for Information[M].Beijing:China Railway Publishing House,1990.
[5]刘宝有.钢弦式传感器及其应用[M].北京:中国铁道出版社,1986. LIU Bao-you.String Wire Sensor and Its Application[M].Beijing:China Railway Publishing House,1986.
[6]肖林萍,赵玉光,李永树.单拱大跨隧道信息化施工监控量测技术研究[J].中国公路学报,2005,18(4):62- 66. XIAO Lin-ping,ZHAO Yu-guang,LI Yong-shu.Research on Field Monitor Measuring Techniques in Informational Construction of Single Arch Long-Span Tunnel[J].China Journal of Highway and Transport,2005,18(4):62-66.
[7]李晓红.隧道新奥法及其量测技术[M].北京:科学出版社,2002. LI Xiao-hong.New Austrian Tunneling Method for Tunnel and Its Gauging Techniques [M].Beijing:Science Press,2002.
[8]夏才初.地下工程测试理论与监测技术[M].上海:同济大学出版社,1999. XIA Cai-chu.Testing Theory and Monitoring Measurement Techniques of Underground Engineering [M].Shanghai:Tongji University Press,1999.
[9]陈建勋.秦岭终南山特长公路隧道施工监控量测报告[R].西安:长安大学,2003. CHEN Jian-xun.The Construction Monitoring Measurement Report of Qinling Zhongnanshan Super- Long Highway Tunnel[R].Xi'an:Chang'an University,2003.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期:2006-05-10
基金项目:陕西省交通科技项目(02-21K)
作者简介:陈建勋(1969-),男,陕西韩城人,副教授,工学博士研究生,E-mail:chenjx1969@163.com。
更新日期/Last Update: 2006-09-20