[1]郭彦林,郭宇飞,刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报,2007,24(01):52-58.
 GUO Yan-lin,GUO Yu-fei,LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering,2007,24(01):52-58.
点击复制

大跨度钢结构屋盖落架分析方法(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
24卷
期数:
2007年01期
页码:
52-58
栏目:
出版日期:
2007-03-20

文章信息/Info

Title:
Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof
作者:
郭彦林郭宇飞刘学武
清华大学土木工程系,北京100084
Author(s):
GUO Yan-lin, GUO Yu-fei, LIU Xue-wu
Department of Civil Engineering, Tsinghua University, Beijing 100084, China
关键词:
钢结构屋盖 落架 支座位移法 等效杆端位移法 千斤顶单元法
Keywords:
steel structural roof removing temporary support support displacement method equivalent rod bottom-end displacement method jack element method
分类号:
TU393.3
DOI:
-
文献标志码:
A
摘要:
首先对大跨度钢结构屋盖的落架过程进行了简单分析,给出了落架应遵循的基本原则,并提出了“同步协调”和“分组分步”2种落架方式; 其次,介绍了落架过程数值模拟的3种计算方法:支座位移法、等效杆端位移法和千斤顶单元法,并详细论述了各自的计算原理及特点; 最后,基于ANSYS有限元软件,应用3种落架计算方法对3点支撑悬臂梁及国家体育场进行了落架过程模拟。结果表明,等效杆端位移法和千斤顶单元法是2种合理有效的方法,并可以方便地应用于工程实际中。
Abstract:
Firstly, some basic rules of removing temporary supports from steel structural roof were presented and two basic procedures of removing temporary supports, one is supports lowering simultaneously and the other is group by group and step by step, were also discussed in detail. Secondly, three calculation methods for numerical simulation analysis of removing temporary supports which are support displacement method, equivalent rod bottom-end displacement method and jack element method were introduced. Finally, the process of removing temporary supports was simulated by ANSYS finite element software package for two examples, namely three points support cantilever beam and national stadium. The comparisons of calculation results obtained by using three points support analysis methods mentioned above indicate that equivalent rod bottom-end displacement method and jack element method are rational and effective for an accurate simulation analysis of removing temporary supports to steel structural roof.

参考文献/References:

[1] 陈国栋,郭彦林,叶浩文,等.广州市新体育馆屋盖吊装及拆撑过程动态分析[J].建筑结构,2002,32(1):53-57. CHEN Guo-dong,GUO Yan-lin,YE Hao-wen,et al.Tracing Analysis of Truss Roof Structure for Guangzhou Gymnasium from Hoisting State into Designing State[J].Building Structure,2002,32(1):53-57.
[2]张晓燕,郭彦林,黄李骥,等.深圳会展中心钢结构屋盖起拱方案及施工技术[J].工业建筑,2004,34(12):15-18. ZHANG Xiao-yan,GUO Yan-lin,HUANG Li-ji,et al.Pre-arched and Construction Technology for Steel Roof in Shenzhen Convention and Exhibition Centre[J].Industrial Construction,2004,34(12):15-18.
[3]伍小平,高振锋,李子旭.国家大剧院钢壳体施工全过程模拟分析[J].建筑结构学报,2005,26(5):40-45. WU Xiao-ping,GAO Zhen-feng,LI Zi-xu.The Analysis of Whole Erection Process for Steel Shell of National Grand Theatre[J].Journal of Building Structure,2005,26(5):40-45.
[4]伍小平,高振锋,李子旭,等.国家大剧院钢壳体安装中卸载方案分析[J].建筑施工,2005,27(6):6-8. WU Xiao-ping,GAO Zhen-feng,LI Zi-xu,et al.Analysis of Load-relieving Proposal for Installation of Steel Structured Shell of the National Grand Theatre[J].Building Construction,2005,27(6):6-8.
[5]武 岳,陈 波,沈世钊.大跨度层盖结构等效静风荷载研究[J].建筑科学与工程学报,2005,22(4):27-31. WU Yue,CHEN Bo,SHEN Shi-zhao.Research on Equivalent Static Wind Loadings of Large-span Roof Structures[J].Journal of Architecture and Civil Engineering,2005,22(4):27-31.
[6]郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,32(12):1-5. GUO Yan-lin,CUI Xiao-qiang.Key Technical Problems and Discussion in Construction Process of Larger Span Steels Structures[J].Industrial Construction,2004,32(12):1-5.
[7]崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88. CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the Construction Mechanic Method of Long-span Steel Structures[J].Engineering Mechanics,2006,23(5):83-88.
[8]王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108. WANG Guang-yuan.On Mechanics of Time-varying Structures[J].China Civil Engineering Journal,2000,33(6):105-108.
[9]曹志远.土木工程分析的施工力学与时变力学基础[J].土木工程学报,2001,34(3):41-46. CAO Zhi-yuan.Construction Mechanics and Time-varying Mechanics in Civil Engineering[J].China Civil Engineering Journal,2001,34(3):41-46.
[10]范 重,刘先明,范学伟,等.国家体育场钢结构设计中的优化技术[J].建筑科学与工程学报,2006,23(2):20-29. FAN Zhong,LIU Xian-ming,FAN Xue-wei,et al.Optimization Techniques of Steel Structure Design for National Stadium[J].Journal of Architecture and Civil Engineering,2006,23(2):20-29.
[11]郭彦林,刘学武,赵 瑛,等.国家体育场钢结构安装方案研究[J].施工技术,2006,35(12):36-40. GUO Yan-lin,LIU Xue-wu,ZHAO Ying,et al.Installation Project Research of National Stadium Steel Structure[J].Construction Technology,2006,35(12):36-40.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期:2007-01-11
作者简介:郭彦林(1958-),男,陕西富平人,教授,博士生导师,工学博士,E-mail:gyl@tsinghua.edu.cn。