文章信息/Info

Title:
Experiment and FEM Analysis on Long-span Prestressed Beam String Pipes
作者:
薛伟辰1,刘晟1,王恒栋2,卫丹2
1. 同济大学 建筑工程系,上海 200092; 2. 上海市政工程设计研究总院,上海 200092
Author(s):
XUE Wei-chen1, LIU Sheng1, WANG Heng-dong2, WEI Dan2
1. Department of Architectural Engineering, Tongji University, Shanghai 200092, China; 2. Shanghai Municipal Engineering Design General Institute, Shanghai 200092, China
关键词:
大跨度预应力张弦式管道 预应力张弦梁 模型试验 非线性有限元全过程分析 屈曲分析
Keywords:
long-span prestressed beam string pipe prestressed string beam model test nonlinear finite element full-range analysis buckling analysis
分类号:
TU393.3
DOI:
-
文献标志码:
A
摘要:
以一榀100 m跨度预应力张弦式管道为原型,设计了1:15比例缩尺模型,在中国首次开展了张弦式管道在预应力张拉阶段、正常使用阶段及承载力极限阶段的受力全过程试验研究。基于ANSYS软件对试验全过程进行了非线性有限元模拟,并结合一致缺陷模态法与柱面弧长法,进行了同时考虑初始几何缺陷与几何非线性的屈曲分析。结果表明:半跨荷载对预应力张弦式管道较为不利,结构整体变形与上弦应力增长较为迅速; 结构对平面外的初始几何缺陷较为敏感,半跨荷载下的屈曲临界荷载较全跨荷载作用时稍低; 结构具有可靠的稳定性与较大的安全储备,极限承载力达到设计荷载的2.68倍; 有限元计算值与试验结果吻合良好; 该非线性有限元分析方法能较好地实现对预应力张弦式管道受力全过程的模拟。
Abstract:
Based on a 100 m-span beam string pipe as an original type, a 1:15 scaled model was firstly tested to investigate the full-range behaviors of this structure during the stretching phase, normal serviceability phase and ultimate load carrying phase in China. Nonlinear finite element simulation for the test of full-range was conducted by using ANSYS software. In addition, buckling analysis simultaneous considering initial geometrical imperfection and geometrical nonlinear was performed by combining uniform imperfections mode method and cylindrical arc length method. The results show that the whole structural deformations and member stresses increase relatively fast under half-span load, and the half-span load is disadvantaged for prestressed beam string pipe. The beam string pipe is sensitive to the out-plane initial geometrical imperfection; criticalbuckling load of the half-span is a little lower than that of full-span. This structure develops reliable stability and relatively large safety reserve with an ultimate load up to 2.68 times design load. The analytical results by using nonlinear finite element method analysis are in good agreement with the test results, which indicate that the nonlinear finite element method analysis is capable for the full-range simulation of prestressed beam string pipes.

参考文献/References:

[1] MASAO S.Study on Mechanical Characteristics Complex Structure Composed of a Membrane and a Beam of a Light-weight String Structure[C]//JOHN F A,JOHN W L,CELINA U P.Proceedings of the IASS-ASCE International Symposium 1994 on Spatial,Lattice and Tension Structures.Atlanta:ASCE,1994:633-641.
[2]SHIRO K,SHOJI N,YASUO M,et al.Active Control of Axial Forces in Beam String Space Frames[C]//JOHN F A,JOHN W L,CELINA U P.Proceedings of the IASS-ASCE International Symposium 1994 on Spatial,Lattice and Tension Structures.Atlanta:ASCE,1994:664-673.
[3]薛伟辰,王晓辉.有黏结预应力CFRP筋混凝土梁试验及非线性分析[J].中国公路学报,2007,20(4):41-47. XUE Wei-chen,WANG Xiao-hui.Experiment and Nonlinear Analysis of Concrete Beams with Bonded Prestressing CFRP Tendons[J].China Journal of Highway and Transport,2007,20(4):41-47.
[4]董满生,葛 斐,惠 磊,等.水中悬浮隧道研究进展[J].中国公路学报,2007,20(4):101-107. DONG Man-sheng,GE Fei,HUI Lei,et al.Research Progress in Submerged Floating Tunnels[J].China Journal of Highway and Transport,2007,20(4):101-107.
[5]刘小燕,颜东煌,张 峰,等.预应力高强混凝土梁极限承载力分析[J].中国公路学报,2006,19(1):58-61. LIU Xiao-yan,YAN Dong-huang,ZHANG Feng,et al.Ultimate Load Analysis of Prestressed High-strength Concrete Beam[J].China Journal of Highway and Transport,2006,19(1):58-61.
[6]MASAO S,AKIRA O.The Role of String in Hybrid String Structure[J].Engineering Structures,1999,21(8):756-769.
[7]薛伟辰.现代预应力结构设计[M].北京:中国建筑工业出版社,2003. XUE Wei-chen.Design of the Modern Prestressed Structures[M].Beijing:China Architecture & Building Press,2003.
[8]刘 晟,苏旭霖,陆 平,等.上海源深体育馆预应力张弦梁设计计算[J].建筑结构,2006,36(增1):43-46. LIU Sheng,SU Xu-lin,LU Ping,et al.Design Calculation of Prestressed Beam String Structure of Shanghai Yuanshen Arena[J].Journal of Building Structures,2006,36(S1):43-46.
[9]胡云程,严 勤,范民权.一种新颖的大跨度输水管桥--张弦梁输水管桥设计研究[J].特种结构,2005,22(增1):136-138. HU Yun-cheng,YAN Qin,FAN Min-quan.A New Long-span Water Conveying Pipe Bridge-Study of Tensioning Chord Beam Water Conveying Pipe Bridge Design[J].Journal of Special Structures,2005,22(S1):136-138.
[10]陈以一,沈祖炎,赵宪忠,等.上海浦东国际机场候机楼R2钢屋架足尺试验研究[J].建筑结构学报,1999,20(2):9-17. CHEN Yi-yi,SHEN Zu-yan,ZHAO Xian-zhong,et al.Experimental Study on a Full-scale Roof Truss of Shanghai Pudong International Airport Terminal[J].Journal of Building Structures,1999,20(2):9-17.
[11]沈士钊,陈 昕.网壳结构稳定性[M].北京:科学出版社,1999. SHEN Shi-zhao,CHEN Xin.Stability of Latticed Shells[M].Beijing:Science Press,1999.