[1] 聂建国,樊健生.广义组合结构及其发展展望[J].建筑结构学报,2006,27(6):1-8.
NIE Jian-guo,FAN Jian-sheng.The Development and Prospect of Generalized Composite Structures[J].Journal of Building Structures,2006,27(6):1-8.
[2]委 旭,史庆轩.钢筋混凝土双肢剪力墙非线性静力有限元分析[J].建筑科学与工程学报,2008,25(4):53-57.
WEI Xu,SHI Qing-xuan.Nonlinear Static Finite Element Analysis of Reinforced Concrete Coupled Shear Walls[J].Journal of Architecture and Civil Engineering,2008,25(4):53-57.
[3]张 阳,邵旭东,王皓磊,等.大悬臂钢-混凝土组合脊骨梁的剪力滞效应[J].中国公路学报,2008,21(3):57-63.
ZHANG Yang,SHAO Xu-dong,WANG Hao-lei,et al.Shear Lag Effects in Steel-concrete Composite Spine Girder with Long Cantilevered Flanges[J].China Journal of Highway and Transport,2008,21(3):57-63.
[4]张清华,李 乔,唐 亮.桥塔钢-混凝土结合段剪力键破坏机理及极限承载力[J].中国公路学报,2007,20(1):85-90.
ZHANG Qing-hua,LI Qiao,TANG Liang.Fracture Mechanism and Ultimate Carrying Capacity of Shear Connectors Applied for Steel-concrete Joint Segment of Bridge Pylon[J].China Journal of Highway and Transport,2007,20(1):85-90.
[5]曹国辉,方 志.钢筋混凝土连续宽箱梁受力性能试验[J].中国公路学报,2006,19(5):46-52.
CAO Guo-hui,FANG Zhi.Mechanical Behaviors Test of RC Continuous Box Girder with Wide Flange[J].China Journal of Highway and Transport,2006,19(5):46-52.
[6]聂建国,秦 凯,张桂标.方钢管混凝土柱内隔板式节点的抗弯承载力研究[J].建筑科学与工程学报,2005,22(1):42-49.
NIE Jian-guo,QIN Kai,ZHANG Gui-biao.Experimental Research and Theoretical Analysis on Flexural Capacity of Connections for Concrete-filled Steel Square Tubular Columns with Inner Diaphragms[J].Journal of Architecture and Civil Engineering,2005,22(1):42-49.
[7]王毅红,傅鹏斌,毛元平.芯钢管连接的钢管混凝土节点偏压承载力[J].长安大学学报:自然科学版,2006,26(2):61-64.
WANG Yi-hong,FU Peng-bin,MAO Yuan-ping.Bearing Capacity of Joint with Core Steel Tube in Concrete Filled Steel Tubular Under Eccentrically Load[J].Journal of Chang'an University:Natural Science Edition,2006,26(2):61-64.
[8]张 玥,胡兆同,贾润中.钢筋混凝土连续弯箱梁桥的温度梯度[J].长安大学学报:自然科学版,2006,26(4):58-62.
ZHANG Yue,HU Zhao-tong,JIA Run-zhong.Temperature Gradient of RC Continuous Curved Box Girder Bridge[J].Journal of Chang'an University:Natural Science Edition,2006,26(4):58-62.
[9]刘永健,刘君平,郭永平,等.钢管混凝土界面粘结滑移性能[J].长安大学学报:自然科学版,2007,27(2):53-57.
LIU Yong-jian,LIU Jun-ping,GUO Yong-ping,et al.Bond-slip Mechanics Behaviors of Structures Concrete Filled Steel Tubes[J].Journal of Chang'an Univer-sity:Natural Science Edition,2007,27(2):53-57.
[10]蒋丽忠,汤裕坤.钢-混凝土组合框架柱的稳定设计方法[J].建筑科学与工程学报,2008,25(3):12-16.
JIANG Li-zhong,TANG Yu-kun.Stability Design Method of Steel-concrete Composite Frame Columns[J].Journal of Architecture and Civil Engineering,2008,25(3):12-16.
[11]李国强,刘玉姝,石文龙,等.端板式半刚性连接钢结构技术规程条文说明[R].上海:同济大学,2008.
LI Guo-qiang,LIU Yu-shu,SHI Wen-long,et al.Clause Explanation of Technology Regulations for Steel Structure with End-plate Semi-rigid Connections[R].Shanghai:Tongji University,2008.
[12]赵鸿铁.钢与混凝土组合结构[M].北京:科学出版社,2001.
ZHAO Hong-tie.Steel and Concrete Composite Structures[M].Beijing:Science Press,2001.
[13]HIGGINS C,MITCHELL H.Behavior of Composite Bridge Decks with Alternative Shear Connectors[J].Journal of Bridge Engineering,2001,6(1):17-22.
[14]GALAMBOS T V.Recent Research and Design Developments in Steel and Composite Steel-concrete Structures in USA[J].Constructional Steel Research,2000,55(1):289-303.
[15]聂建国.钢-混凝土组合梁结构[M].北京:科学出版社,2005.
NIE Jian-guo.Steel-concrete Composite Beam Structures[M].Beijing:Science Press,2005.
[16]GB 50017-2003,钢结构设计规范[S].
GB 50017-2003,Code for Design of Steel Structures[S].
[1]万水,李淑琴,马磊.波形钢腹板预应力混凝土组合箱梁结构在中国桥梁工程中的应用[J].建筑科学与工程学报,2009,26(02):15.
WAN Shui,LI Shu-qin,MA Lei.Application of Prestressed Concrete Composite Box-girder Structure with
Corrugated Steel Webs in Bridge Engineering in China[J].Journal of Architecture and Civil Engineering,2009,26(01):15.