[1] 赵鸿铁.钢与混凝土组合结构[M].北京:科学出版社,2001:77-226.
ZHAO Hong-tie.Steel-concrete Composite Structures[M].Beijing:Science Press,2001:77-226.
[2]周起敬,姜维山,潘泰华.钢与混凝土组合结构设计施工手册[M].北京:中国建筑工业出版社,1994.
ZHOU Qi-jing,JIANG Wei-shan,PAN Tai-hua.Design and Construction Handbook for Steel Reinforced Concrete Composite Structures[M].Beijing:China Architecture & Building Press,1994.
[3]李 红.型钢与混凝土黏结基本性能的试验研究[D].西安:西安建筑科技大学,1994.
LI Hong.An Experimental Investigation on Bond Behavior Between Steel and Concrete[D].Xi'an:Xi'an University of Architecture & Technology,1994.
[4]XUE Jian-yang,ZHAO Hong-tie,YANG Yong,et al.Analysis on the Behaviors of Bond-slip Between the Shape Steel and the Concrete by Push-out Test[J].Xi'an University of Architecture & Technology:Natural Science Edition,2007,39(3):320-326.
[5]CHARLES W R,ROBERT C.Shear Connector Requirements for Embedded Steel Sections[J].Journal of Structural Engineering,1999,125(2):142-152.
[6]杨 勇.型钢混凝土黏结滑移基本理论及应用研究[D].西安:西安建筑科技大学,2003.
YANG Yong.Study on the Basic Theory and Its Application of Bond-slip Between Steel Shape and Concrete in SRC Structures[D].Xi'an:Xi'an University of Architecture & Technology,2003.
[7]过镇海,时旭东.钢筋混凝土原理和分析[M].北京:清华大学出版社,2003:146-162.
GUO Zhen-hai,SHI Xu-dong.Theory and Analysis of Reinforced Concrete[M].Beijing:Tsinghua Univer-sity Press,2003:146-162.
[8]徐有邻.钢筋与混凝土黏结锚固的分析研究[J].建筑科学,1992(4):18-24.
XU You-lin.Analytical Study on Bond-anchorage Between Bar and Concrete[J].Building Science,1992(4):18-24.
[9]徐有邻.钢筋混凝土黏结滑移本构关系的简化模型[J].工程力学,1997,14(增2):34-38.
XU You-lin.Simplified Model of Bond-slip Constitutive Relation Between Bar and Concrete[J].Engineering Mechanics,1997,14(S2):34-38.
[10]杨 勇,赵鸿铁,薛建阳.型钢混凝土黏结机理与黏结强度的研究[J].西安建筑科技大学学报:自然科学版,2001,33(2):103-107.
YANG Yong,ZHAO Hong-tie,XUE Jian-yang.An-alysis of Mechanism and Strength of Bond Between Steel and Concrete in SRC Structures[J].Journal of Xi'an University of Architecture & Technology:Natural Science Edition,2001,33(2):103-107.
[11]李 红,姜维山.型钢与混凝土黏结本构关系的试验研究[J].西北建筑工程学院学报,1995(3):16-22.
LI Hong,JIANG Wei-shan.An Experiment Investigation of Bonding Constitutive Relation on Steel Shapes and Concrete[J].Journal of Northwestern Institute of Architectural Engineering,1995(3):16-22.
[12]杨 勇,赵鸿铁,薛建阳,等.型钢混凝土黏结-滑移本构关系理论分析[J].工业建筑,2002,32(6):60-63.
YANG Yong,ZHAO Hong-tie,XUE Jian-yang,et al.Theoretical Analysis on Bond-slip Constitutive Relation on Steel and Concrete Interface in SRC Structures[J].Industrial Construction,2002,32(6):60-63.
[13]马生强.钢筋混凝土墩柱加固滞回耗能试验[J].筑路机械与施工机械化,2008,25(5):65-67.
MA Sheng-qiang.Energy-intensive Test of Reinforced Concrete Pier Column Reinforcing[J].Road Machinery & Construction Mechanization,2008,25(5):65-67.
[14]张淑云,白国良,李红星,等.钢筋混凝土框架异型节点抗剪承载力研究[J].西安科技大学学报,2006,26(2):170-174.
ZHANG Shu-yun,BAI Guo-liang,LI Hong-xing,et al.Anti-shear Capacity of Abnormal Joints of RC Frame[J].Journal of Xi'an University of Science and Technology,2006,26(2):170-174.
[15]李世秋,汪厚植,胡新民.桥梁预应力钢筋混凝土结构耐久性影响因素及对策[J].筑路机械与施工机械化,2007,24(6):41-43.
LI Shi-qiu,WANG Hou-zhi,HU Xin-min.Influencing Factors on Durability and Counter Measure of Bridge Prestressed Concrete Structure[J].Road Machinery & Construction Mechanization,2007,24(6):41-43.