[1]叶芳芳,余志武,袁俊杰.重庆大剧院大悬挑结构卸载分析[J].建筑科学与工程学报,2009,26(03):122-126.
 YE Fang-fang,YU Zhi-wu,YUAN Jun-jie.Unloading Analysis for Large Cantilever Structure of Chongqing Grand Theatre[J].Journal of Architecture and Civil Engineering,2009,26(03):122-126.
点击复制

重庆大剧院大悬挑结构卸载分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
26卷
期数:
2009年03期
页码:
122-126
栏目:
出版日期:
2009-09-20

文章信息/Info

Title:
Unloading Analysis for Large Cantilever Structure of Chongqing Grand Theatre
作者:
叶芳芳1,2,余志武1,袁俊杰3
1.中南大学土木建筑学院,湖南长沙410075;2.浙江大学建筑设计研究院,浙江杭州310027; 3.湖南建工集团总公司,湖南长沙410004
Author(s):
YE Fang-fang1,2, YU Zhi-wu1, YUAN Jun-jie3
1. School of Civil Engineering and Architecture, Central South University, Changsha 410075, Hunan, China; 2. Architectural Design and Research Institute, Zhejiang University, Hangzhou 310027, Zhejiang, China; 3. Hunan Construction Engineering Group Corporation, Changsha 410004, Hunan, China
关键词:
重庆大剧院 大悬挑结构 卸载 数值模拟 竖向挠度
Keywords:
Chongqing Grand Theatre large cantilever structure unloading numerical simulation vertical deflection
分类号:
TU745.2
DOI:
-
文献标志码:
A
摘要:
为了解决大悬挑结构卸载过程中存在的技术难题,采用有限元分析软件ANSYS对重庆大剧院大悬挑结构卸载过程进行了数值模拟分析,根据分析结果确定了拆除临时支撑的合理顺序; 采用以变形控制为主、受力控制为辅的双重控制路线,通过与实际施工中的实测值进行对比,确定采用分次、分步的方法进行施工,确保卸载过程中结构的变形和受力始终处于安全范围之内。分析结果表明:该理论模型能较好地模拟大悬挑结构的实际状态。
Abstract:
In order to solve the technical difficulty problems in unloading process of the large cantilever structure, finite element analysis software ANSYS was adopted to simulate the unloading process for large cantilever structure of Chongqing Grand Theatre. According to the analytical results, the reasonable order of temporary supports removal was confirmed, and double-control guideline which regarded the deformation control as the main one and regarded the force control as the secondary one was adopted. Finally, the data measured values in the field were compared with the theoretical results, which determined the use of step-by-step approach in construction and ensured that the deformation and forces of the structure in the unloading process remained in the scope of security. The analytical results show that the theoretical model proposed in the paper can preferably simulate the large cantilever structure.

参考文献/References:

[1] 蒋金生,叶可明.上海新国际博览中心钢桁架结构的施工及临时支承拆除的卸载过程分析[J].建筑结构学报,2006,27(5):118-122. JIANG Jin-sheng,YE Ke-ming.Construction Method and Dismantling Process Analysis of Temporary Shoring Structure for the Roof of Shanghai New International Expo Center[J].Journal of Building Structures,2006,27(5):118-122.
[2]伍小平,高振锋,李子旭.国家大剧院钢壳体施工全过程模拟分析[J].建筑结构学报,2005,26(5):40-45. WU Xiao-ping,GAO Zhen-feng,LI Zi-xu.The Analysis of Whole Erection Process for Steel Shell of National Grand Theatre[J].Journal of Building Structures,2005,26(5):40-45.
[3]伍小平,高振锋,李子旭,等.国家大剧院钢壳体安装中卸载方案分析[J].建筑施工,2005,27(6):6-8. WU Xiao-ping,GAO Zhen-feng,LI Zi-xu,et al.Analy-sis of Load-relieving Proposal for Installation of Steel Structured Shell of the National Grand Theatre[J].Building Construction,2005,27(6):6-8.
[4]郭彦林,刘学武,赵 瑛,等.国家体育场钢结构安装方案研究[J].施工技术,2006,35(12):23-27. GUO Yan-lin,LIU Xue-wu,ZHAO Ying,et al.Study on Erection Schemes for the Steel Structure of National Stadium[J].Construction Technology,2006,35(12):23-27.
[5]郭彦林,崔晓强.大跨度复杂钢结构施工过程中的若干技术问题及探讨[J].工业建筑,2004,34(12):1-5. GUO Yan-lin,CUI Xiao-qiang.Key Technical Problems and Discussion in Construction Process of Larger Span Steel Structures[J].Industrial Construction,2004,34(12):1-5.
[6]崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88. CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the Construction Mechanic Method of Long-span Steel Structures[J].Engineering Mechanics,2006,23(5):83-88.
[7]郭彦林,郭宇飞,刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报,2007,24(1):52-58. GUO Yan-lin,GUO Yu-fei,LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering,2007,24(1):52-58.
[8]罗晓群.大型钢结构施工力学分析研究[D].上海:同济大学,2003. LUO Xiao-qun.Research on Construction Mechanics of Large-scale Steel Structure[D].Shanghai:Tongji University,2003.
[9]张其林,罗晓群,高振锋,等.大跨钢结构施工过程的数值跟踪和图形模拟[J].同济大学学报:自然科学版,2004,32(10):1295-1299. ZHANG Qi-lin,LUO Xiao-qun,GAO Zhen-feng,et al.Numerical Tracing and Graphic Simulation for Construction Processes of Large Span Pre-tensioned Steel Structures[J].Journal of Tongji University:Natural Science,2004,32(10):1295-1299.
[10]陈国栋,郭彦林,叶浩文,等.广州市新体育馆屋盖吊装及拆撑过程动态分析[J].建筑结构,2002,32(1):53-57. CHEN Guo-dong,GUO Yan-lin,YE Hao-wen,et al.Tracing Analysis of Truss Roof Structure for Guangzhou Gymnasium from Hoisting State into Designing State[J].Building Structure,2002,32(1):53-57.

相似文献/References:

备注/Memo

备注/Memo:
收稿日期:2009-06-08
作者简介:叶芳芳(1982-),女,浙江上虞人,工学硕士,E-mail:33432393@qq.com。
更新日期/Last Update: 2009-09-20