[1]李亚东,姚昌荣,石成.多跨钢筋混凝土拱桥拱肋拆除过程仿真分析[J].建筑科学与工程学报,2009,26(04):114-119.
 LI Ya-dong,YAO Chang-rong,SHI Cheng.Simulation Analysis of Rib Disassembly of RC Multi-span Arch Bridge[J].Journal of Architecture and Civil Engineering,2009,26(04):114-119.
点击复制

多跨钢筋混凝土拱桥拱肋拆除过程仿真分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
26卷
期数:
2009年04期
页码:
114-119
栏目:
出版日期:
2009-12-20

文章信息/Info

Title:
Simulation Analysis of Rib Disassembly of RC Multi-span Arch Bridge
作者:
李亚东1,姚昌荣1,石成2
1.西南交通大学土木工程学院,四川成都610031;2.青岛市市政 工程设计研究院有限责任公司,山东青岛266071
Author(s):
LI Ya-dong1, YAO Chang-rong1, SHI Cheng2
1. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. Qingdao Municipal Engineering Design & Research Institute Co., Ltd., Qingdao 266071, Shandong, China
关键词:
多跨钢筋混凝土拱桥 拱肋 拆除 仿真分析 环境因素 冲击影响
Keywords:
RC multi-span arch bridge rib disassembly simulation analysis environmental factor impact influence
分类号:
U445
DOI:
-
文献标志码:
A
摘要:
应用ANSYS有限元软件对1座钢筋混凝土5跨拱桥的拱肋拆除施工过程进行了分析。以龙门吊索力和千斤顶的预撑力作为设计变量,以拱肋截面应力、墩顶水平推力为控制变量,以拱肋切割截面的混凝土最小应力作为目标函数,应用ANSYS的优化分析方法确定拆除施工过程中的技术参数; 同时对拆除过程中的冲击影响和环境因素进行了分析。结果表明:通过龙门吊索和拱下千斤顶的共同作用,在拱肋拆除过程中结构的应力、挠度变化量和墩顶水平推力都比较小,结构的拆除施工安全可靠; 在拱肋拆除过程中,环境温度变化对拱肋及拱下支撑的受力有明显影响,应制定相应的技术措施以减少温度对结构的不利影响。
Abstract:
The rib disassembly of a RC multiple arch bridge with five spans was simulated using ANSYS finite element software. Defining the cable forces of gantry crane and support forces of jacks as design variables, adopting the rib stress on cross-section and horizontal thrusts at piers' top as control variables, and taking the minimum stress of rib on cross-section as objective function, the technical parameters needed in disassembly construction control were determined by using optimization analysis methods in ANSYS. The impact and environmental factors in disassembly were taken into account as well. The results show that through combining action of gantry crane and jacks, the rib's stress, deflection deformation and the horizontal thrusts at piers' top were quite small, which testified the structure was safe during the rib disassembly. The stress of rib and the support forces of jacks are obviously influenced by environmental temperature, and the effective technical measures should be taken to decrease the negative impact of temperature on structure.

参考文献/References:

[1] 李宗文,李绍衡.拱桥拆除爆破技术[J].工程爆破,2006,12(3):71-73. LI Zong-wen,LI Shao-heng.Blasting Technology of Demolition of Arch Bridge[J].Engineering Blasting,2006,12(3):71-73.
[2]邓晓泉,肖志武,鲁艳红,等.公路石拱桥控制爆破拆除[J].爆破,2004,21(2):63-65. DENG Xiao-quan,XIAO Zhi-wu,LU Yan-hong,et al.Controlled Blasting of a Shone Arch Bridge Road[J].Blasting,2004,21(2):63-65.
[3]李元福.控制爆破拆除结构复杂的钢筋混凝土桥梁[J].石家庄铁道学院学报,1996,9(4):112-115. LI Yuan-fu.Controlled Blasting Demolition of Complicated RC Bridge[J]. Journal of Shijiazhuang Railway Institute,1996,9(4):112-115.
[4]刘显晖,谭柳芳,杨 帆,等.一种旧桥拆除的创新方法[J].施工技术,2005,34(9):4-6. LIU Xian-hui,TAN Liu-fang,YANG Fan,et al.A New Construction Method to Remove Old Bridges[J].Construction Technology,2005,34(9):4-6.
[5]李英勇,崔吉旺,李运恒.高速公路上连续梁桥的拆除[J].华东公路,2000(6):14-16. LI Ying-yong,CUI Ji-wang,LI Yun-hen.Demolition of Highway Continuous Bridge[J].East China Highway,2000(6):14-16.
[6]潘 蕾.浅谈连拱肋拱桥的拆除[J].公路交通科技:应用技术版,2008(7):107-109. PAN Lei.Discusses on Demolition of Multiple Arch Bridge[J].Journal of Highway and Transportation Research and Development:Applied Technology Edition,2008(7):107-109.
[7]李绍宏,贾樟禄.切割法拆除城市桥梁的施工工艺和方法[J].公路与汽运,2003(4):71-73. LI Shao-hong,JIA Zhang-lu.Construction Technol-ogy and Method for Demolition of City Bridge by Cutting[J].Highways & Automotive Applications,2003(4):71-73.
[8]解 勇,刘道田,胡恒福.大跨度钢筋混凝土桁架拱桥的拆除技术[J].施工技术,2005,34(5):30-31. XIE Yong,LIU Dao-tian,HU Heng-fu.Removal Technologies of a Large Span Reinforcement Concrete Truss Arch Bridge[J].Construction Technology,2005,34(5):30-31.
[9]刘小林,崔清强,张 鹏,等.大跨度旧、危桥梁的智能预警非爆破拆除法[J].中国市政工程,2006(3):28-31. LIU Xiao-lin,CUI Qing-qiang,ZHANG Peng,et al.Smartly-warned Non-explosive Demolition of Old Precarious Large-spanned Bridges[J].China Municipal Engineering,2006(3):28-31.
[10]唐成斌.大跨度钢拱桥的拆除与控制[D].成都:西南交通大学,2004. TANG Cheng-bin.The Demolition and Control of Long Span Steel Arch Bridge[D].Chengdu:Southwest Jiaotong University,2004.
[11]牛润明,朱英磊,张耀辉.东莞水道特大桥钢管拱肋吊装扣挂系统设计[J].筑路机械与施工机械化,2006,23(9):42-44. NIU Run-ming,ZHU Ying-lei,ZHANG Yao-hui.Design of the Fasten and Hang System Used for Steel Tube Arch Ribassembling of the Extra-large Bridge on Dongguan Watercourse[J].Road Machinery & Construction Mechanization,2006,23(9):42-44.
[12]许宏伟,孙志星,李义强.移动模架造桥机在桥梁施工中的应用[J].筑路机械与施工机械化,2008,25(8):69-71. XU Hong-wei,SUN Zhi-xing,LI Yi-qiang.Application of Movable Frame Bridge Machine in Bridge Construction[J].Road Machinery & Construction Mechanization,2008,25(8):69-71.
[13]卢 勇,朱有武,邵侯清,等.静态爆破工艺在旧桥改造中的应用[J].筑路机械与施工机械化,2005,22(9):50-51. LU Yong,ZHU You-wu,SHAO Hou-qing,et al.Application of Static Blasting Technology in Reconstruction of Old Bridge[J].Road Machinery & Construction Mechanization,2005,22(9):50-51.
[14]陈宝春,肖泽荣,韦建刚.钢管混凝土哑铃形拱肋灌注混凝土时的截面应力分析[J].中国公路学报,2005,18(1):73-76. CHEN Bao-chun,XIAO Ze-rong,WEI Jian-gang.Analysis on Stresses of Dumbbell-shaped Cross-section of CFST Arch Rib During Concrete Pouring Construction[J].China Journal of Highway and Transport,2005,18(1):73-76.
[15]王钧利,贺拴海.大跨径弯桥圆心角对其内力、位移及稳定性的影响[J].交通运输工程学报,2007,7(3):86-70. WANG Jun-li,HE Shuan-hai.Central Angle Influence of Long-span Curve bridge on Its Inner Forces, Displacements and Stability[J].Journal of Traffic and Transportation Engineering,2007,7(3):86-70.
[16]段靓靓,李宏泉,易 锦.简易造桥机理论分析与施工设计[J].筑路机械与施工机械化,2008,25(4):61-65. DUAN Liang-liang,LI Hong-quan,YI Jin.Theory Analysis and Construction Design for Simple Overhead Launching Gantry[J].Road Machinery & Construction Mechanization,2008,25(4):61-65.
[17]许凯明,张明中.大跨径钢管混凝土拱桥主拱混凝土灌注阶段空间稳定分析[J].筑路机械与施工机械化,2008,28(12):66-69. XU Kai-ming,ZHANG Ming-zhong.Spatial Stability Research on Concrete Construction Stage of Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Mechanization,2008,28(12):66-69.
[18]韦建刚,陈宝春.钢管混凝土拱桥拱肋刚度设计取值分析[J].交通运输工程学报,2008,8(2):34-39. WEI Jian-gang,CHEN Bao-chun.Analysis on Rib Rigidity of Concrete Filled Steel Tubular Arch Bridge[J].Journal of Traffic and Transportation Engineering,2008,8(2):34-39.
[19]JTG D60-2004,公路桥涵设计通用规范[S]. JTG D60-2004,General Code for Design of Highway Bridges and Culverts[S].

相似文献/References:

[1]黄小伟,王浩,李爱群,等.中承式异形钢管混凝土拱桥动力特性分析[J].建筑科学与工程学报,2012,29(01):87.
 HUANG Xiao-wei,WANG Hao,LI Ai-qun,et al.Analysis on Dynamic Characteristics of Half-through Special-shaped CFST Arch Bridge[J].Journal of Architecture and Civil Engineering,2012,29(04):87.

备注/Memo

备注/Memo:
收稿日期:2009-08-20
作者简介:李亚东(1956-),男,湖北孝感人,教授,博士研究生导师,工学博士,博士后,E-mail:chryao-1016@163.com。
更新日期/Last Update: 2009-12-20