[1] 郝 超.大跨度钢斜拉桥的施工监控及其目标精度值[J].中国公路学报,2003,16(1):54-57.
HAO Chao.Construction Control and Control Precision Goal of Long-span Steel Cable-stayed Bridge[J].China Journal of Highway and Transport,2003,16(1):54-57.
[2]常 英.大跨钢箱梁斜拉桥施工控制要点分析[J].公路交通科技,2001,18(1):39-43.
CHANG Ying.Analysis of Key-points for Construction Control of Long-span Steel Box-girder Cable-stayed Bridge[J].Journal of Highway and Transportation Research and Development,2001,18(1):39-43.
[3]檀永刚,张 哲,杜 涛.康济桥的施工控制[J].大连理工大学学报,2005,45(6):832-836.
TAN Yong-gang,ZHANG Zhe,DU Tao.Construction Control of Kangji Bridge[J].Journal of Dalian University of Technology,2005,45(6):832-836.
[4]肖汝诚,项海帆.拉吊协作桥的施工控制与吊索疲劳控制研究[J].同济大学学报,1999,27(2):234-238.
XIAO Ru-cheng,XIANG Hai-fan.Study of Construction Control and Suspender Fatigue Problems for Cable-stayed-suspension Bridges[J].Journal of Tongji University,1999,27(2):234-238.
[5]潘盛山,黄才良,张 哲.202 m跨径钢管混凝土系杆拱桥的施工控制[J].武汉理工大学学报:交通科学与工程版,2004,28(4):522-525.
PAN Sheng-shan,HUANG Cai-liang,ZHANG Zhe.The Supervisory of 202 m-span Concrete Filled Steel Tubular Tied Arch Bridge[J].Journal of Wuhan University of Technology:Transportation Science & Engin-eering,2004,28(4):522-525.
[6]彭旺虎,邵旭东,李立峰,等.无背索斜拉桥的概念、设计与施工[J].土木工程学报,2007,40(5):26-33.
PENG Wang-hu,SHAO Xu-dong,LI Li-feng,et al.The Concept,Design,and Construction of Cable-stayed Bridges Without Backstays[J].China Civil Engineering Journal,2007,40(5):26-33.