[1]王秀丽,陶志山,赵海燕.整体顶升钢屋盖网壳结构卸载过程模拟分析[J].建筑科学与工程学报,2020,37(01):49-57.[doi:10.19815/j.jace.2019.01053]
 WANG Xiu-li,TAO Zhi-shan,ZHAO Hai-yan.Simulation Analysis of Unloading Process of Integral Jacking Steel Roof Reticulated Shell Structure[J].Journal of Architecture and Civil Engineering,2020,37(01):49-57.[doi:10.19815/j.jace.2019.01053]
点击复制

整体顶升钢屋盖网壳结构卸载过程模拟分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
37卷
期数:
2020年01期
页码:
49-57
栏目:
出版日期:
2020-01-30

文章信息/Info

Title:
Simulation Analysis of Unloading Process of Integral Jacking Steel Roof Reticulated Shell Structure
文章编号:
1673-2049(2020)01-0049-09
作者:
王秀丽1,陶志山1,赵海燕2
(1. 兰州理工大学 土木工程学院,甘肃 兰州 730050; 2. 甘肃建投天水建设管理有限公司,甘肃 天水 741000)
Author(s):
WANG Xiu-li1, TAO Zhi-shan1, ZHAO Hai-yan2
(1. School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, Gansu, China; 2. GCIGC Tianshui Construction Management Ltd., Tianshui 741000, Gansu, China)
关键词:
整体顶升 生死单元法 约束方程法 整体分级同步卸载 分区分步卸载
Keywords:
integral jacking birth and death element method constraint equation method integrated hierarchical synchronous unloading partition and step unloading
分类号:
TU391
DOI:
10.19815/j.jace.2019.01053
文献标志码:
A
摘要:
针对大跨度钢屋盖网壳结构杆系众多、受力复杂,采用整体顶升施工方法时主体结构下方必须设置临时支撑,结构成型后拆除支撑会使结构体系发生重大转变及杆件内力重分布的问题,以天水市体育中心体育馆钢屋盖结构为例,建立精细化有限元模型,对所有节点和杆件按照不同规格分类分别赋予实际质量。利用ANSYS中的生死单元法跟踪模拟顶升施工全过程,以结构完全成型且未拆撑时的状态作为卸载过程的初始状态。采用约束方程法对整体分级同步和分区分步2种卸载方式进行模拟,对比不同卸载方式下所有千斤顶的内力值及应力值较大杆件的应力随卸载步的变化趋势。结果表明:受力复杂的大跨度网壳结构需制定合理的卸载方案并进行模拟分析,确保结构卸载过程的安全; 卸载时支撑处的部分拉杆变为压杆,应引起足够重视; 此类刚性大跨度结构的杆件应力在分区分步卸载过程中对位移变化较敏感,所以要严格控制每一步的卸载位移量; 约束方程法能实现对主体结构和临时支撑脱离再接触过程的真实模拟,为类似工程提供了可靠的卸载分析方法。
Abstract:
Aiming at the problems that the large-span steel roof reticulated shell structure had many rods and complicated forces, temporary support must be set under the main structure when the integral jacking construction method was adopted, and removal of support after the structure was formed would cause significant changes in the structure system and redistribution of internal forces of the rods, a refined finite element model was established for the steel roof structure of Tianshui Sports Center Gymnasium. The actual quality of all joints and rods was given according to different specifications. The life and death unit method in ANSYS was used to track and simulate the whole process of jacking-up construction. The initial state of unloading process was the state when the structure was fully formed and not dismantled. Constraint equation method was used to simulate the two unloading modes, i.e. integrated hierarchical synchronous unloading and separate partition and step unloading. The variation trend of the internal forces of all jacks and the stress of rods with larger stress values under different unloading modes were compared with the unloading steps. The results show that the unloading process of large-span reticulated shell structure with complex loads needs to be reasonably formulated and simulated to ensure the safety of the unloading process; part of the tension rods at the supports become compression rods when unloading, and more attention should be paid to them. The rods stress of such rigid large-span structures is sensitive to the change of displacement in the process of step-by-step unloading, so the unloading displacement of each step should be strictly controlled. The constraint equation method can simulate the real process of disengagement and re-contact between the main structure and temporary support, which provides a reliable unloading analysis method for similar projects.

参考文献/References:

[1] 董石麟.中国空间结构的发展与展望[J].建筑结构学报,2010,31(6):38-51.
DONG Shi-lin.Development and Expectation of Spatial Structures in China[J].Journal of Building Structures,2010,31(6):38-51.
[2]郭彦林,郭宇飞,刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报,2007,24(1):52-58.
GUO Yan-lin,GUO Yu-fei,LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering,2007,24(1):52-58.
[3]刘学武,郭彦林,郭宇飞.千斤顶单元法在大跨度钢屋盖拆撑过程数值模拟中的应用[J].施工技术,2010,39(8):24-28,33.
LIU Xue-wu,GUO Yan-lin,GUO Yu-fei.Application of Jack Element Model for Numerical Simulation of Removing Temporary Supports of Large-span Steel Roof[J].Construction Technique,2010,39(8):24-28,33.
[4]郭彦林,刘学武.大跨度钢结构屋盖拆撑过程数值模拟的千斤顶-间隙单元法[J].西安建筑科技大学学报:自然科学版,2008,40(1):1-7.
GUO Yan-lin,LIU Xue-wu.Jack-gap Element Model for Numerical Simulation of Removing Temporary Supports of Large-span Steel Structural Roof[J].Journal of Xi'an University of Architectural & Technology:Natural Science Edition,2008,40(1):1-7.
[5]郭小农,邱丽秋,罗永峰,等.大跨度屋盖钢结构拆撑过程模拟分析的约束方程法[J].应用数学和力学,2013,34(9):986-994.
GUO Xiao-nong,QIU Li-qiu,LUO Yong-feng,et al.Constraint Equation Method for Analysis of Removing Temporary Supports from Long-span Steel Roof[J].Applied Mathematics and Mechanics,2013,34(9):986-994.
[6]陈国栋,郭彦林,叶浩文,等.广州市新体育馆屋盖吊装及拆撑过程动态分析[J].建筑结构,2002,32(1):53-57.
CHEN Guo-dong,GUO Yan-lin,YE Hao-wen,et al.Dynamic Analysis of Roof Hoisting and Supporting Process of Guangzhou New Stadium[J].Building Structure,2002,32(1):53-57.
[7]伍小平,高振锋,李子旭.国家大剧院钢壳体施工全过程模拟分析[J].建筑结构学报,2005,26(5):40-45.
WU Xiao-ping,GAO Zhen-feng,LI Zi-xu.The Analysis of Whole Erection Process for Steel Shell of National Grand Theatre[J].Journal of Building Structures,2005,26(5):40-45.
[8]郭彦林,郭宇飞,高 巍,等.国家体育场钢结构屋盖落架过程模拟分析[J].施工技术,2006,35(12):36-40,73.
GUO Yan-lin,GUO Yu-fei,GAO Wei,et al.Simulated Analysis of Removing Temporary Supports for Steel Structural Roof in National Stadium[J].Construction Technology,2006,35(12):36-40,73.
[9]高 颖,傅学怡,杨想兵.济南奥体中心体育场钢结构支撑卸载全过程模拟[J].空间结构,2009,15(1):20-26,34.
GAO Ying,FU Xue-yi,YANG Xiang-bing.Whole Removal Process Simulation of Temporary Support of Jinan Olympic Stadium[J].Spatial Structures,2009,15(1):20-26,34.
[10]范 重,刘先明,范学伟,等.大跨度空间结构卸载过程仿真计算方法[J].建筑科学与工程学报,2011,28(4):19-25.
FAN Zhong,LIU Xian-ming,FAN Xue-wei,et al.Simulation and Calculation Method of Unloading Process of Long-span Spatial Structures[J].Journal of Architecture and Civil Engineering,2011,28(4):19-25.
[11]欧阳超,严小霞,陈 韬,等.深圳大运中心主体育场单层折面空间网格结构临时支撑卸载技术[J].施工技术,2011,40(14):5-8.
OUYANG Chao,YAN Xiao-xia,CHEN Tao,et al.Unloading Technology of Temporary Support System for Single Triangular Gridding Structure by Folding Method in Main Stadium of Shenzhen Universiade Sports Center[J].Construction Technology,2011,40(14):5-8.
[12]梁存之,于 滨,欧阳超,等.深圳大运中心主体育场钢结构支撑胎架同步卸载关键问题分析[J].施工技术,2012,41(2):5-8.
LIANG Cun-zhi,YU Bin,OUYANG Chao,et al.Analysis on Key Problems of Synchronous Unloading of Support Jigs for Steel Structures of Main Stadium in Shenzhen Universiade Sports Center[J].Construction Technology,2012,41(2):5-8.
[13]郭小农,杨商飞,罗永峰,等.某刚性大跨度钢屋盖结构拆撑过程分析[J].建筑钢结构进展,2014,16(4):58-64.
GUO Xiao-nong,YANG Shang-fei,LUO Yong-feng,et al.Analysis of Unloading Process on a Steel Structure Roof[J].Progress in Steel Building Structures,2014,16(4):58-64.
[14]张亮泉,张树岗,郭峦川,等.哈尔滨大剧院钢结构屋盖卸载模拟及应力监测[J].地震工程与工程振动,2014,34(3):174-182.
ZHANG Liang-quan,ZHANG Shu-gang,GUO Luan-chuan,et al.Unloading Simulation and Stress Monitoring of Steel Roof of the Harbin Grand Theater[J].Earthquake Engineering and Engineering Dynamics,2014,34(3):174-182.
[15]陈晓阳.某大悬挑结构支撑胎架卸载过程分析[J].施工技术,2014,43(14):115-119.
CHEN Xiao-yang.Analysis on Support Frame Unloading Process of a Large Cantilever Structure[J].Construction Technology,2014,43(14):115-119.
[16]刘 奔,尤德清,喻 馨,等.福州海峡奥体中心体育场卸载过程分析及监测[J].建筑结构,2015,45(5):49-53.
LIU Ben,YOU De-qing,YU Xin,et al.Analysis and Monitoring of Unloading Process for Fuzhou Strait Olympic Sports Center[J].Building Structure,2015,45(5):49-53.
[17]于 江,陈国庆,刘雨婷.刚性大跨度空间结构卸载技术研究进展[J].结构工程师,2016,32(6):185-193.
YU Jiang,CHEN Guo-qing,LIU Yu-ting.Progress in Research on Unloading Technology of Rigid Structure with Large Spans[J].Structural Engineers,2016,32(6):185-193.
[18]王秀丽,荣子豪,杨本学,等.空间管桁架结构体育馆施工全过程模拟分析与健康监测[J].建筑科学与工程学报,2017,34(2):18-25.
WANG Xiu-li,RONG Zi-hao,YANG Ben-xue,et al.Whole Process Simulation Analysis and Health Monitoring of Spatial Pipe Truss Structure Gymnasium[J].Journal of Architecture and Civil Engineering,2017,34(2):18-25.
[19]王秀丽,杨本学.大跨度空间桁架结构卸载过程模拟分析与监测[J].建筑科学,2018,34(3):105-110.
WANG Xiu-li,YANG Ben-xue.Simulation and Monitoring of Unloading Process of Long Span Space Spatial Truss Structure[J].Building Science,2018,34(3):105-110.
[20]陈 博,冉旭勇,曹 植,等.空间曲面不对称钢屋盖桁架结构整体卸载施工技术[J].施工技术,2017,46(增1):351-354.
CHEN Bo,RAN Xu-yong,CAO Zhi,et al.Unloading Technology of Steel Roof of Zunyi Olympic Sports Center Stadium[J].Construction Technology,2017,46(S1):351-354.
[21]王泽曦,罗 杰,肖建春,等.安顺市体育中心体育场大跨度悬挑结构卸载方案研究[J].施工技术,2017,46(18):26-29.
WANG Ze-xi,LUO Jie,XIAO Jian-chun,et al.Research on Unloading Scheme for the Large Span Cantilever Structure of Anshun Sports Center Stadium[J].Construction Technology,2017,46(18):26-29.
[22]孙学根,牛忠荣,李兆峰,等.大跨度空间结构卸载过程模拟分析与监测[J].建筑结构,2018,48(11):70-77.
SUN Xue-gen,NIU Zhong-rong,LI Zhao-feng,et al.Simulating Analysis and Monitoring of Unloading Process of Large-span Spatial Structure[J].Building Structure,2018,48(11):70-77.
[23]钱稼茹,张微敬,赵作周,等.北京大学体育馆钢屋盖施工模拟监测[J].土木工程学报,2009,42(9):13-20.
QIAN Jia-ru,ZHANG Wei-jing,ZHAO Zuo-zhou,et al.Simulation and Monitoring for the Construction of the Steel Roof of the Peking University Gymnasium[J].China Civil Engineering Journal,2009,42(9):13-20.
[24]叶芳芳,余志武,袁俊杰.重庆大剧院大悬挑结构卸载分析[J].建筑科学与工程学报,2009,26(3):122-126.
YE Fang-fang,YU Zhi-wu,YUAN Jun-jie.Unloading Analysis for Large Cantilever Structure of Chongqing Grand Theatre[J].Journal of Architecture and Civil Engineering,2009,26(3):122-126.
[25]赵长军,范 重,彭 翼,等.苏州火车站大跨钢屋盖施工过程仿真分析[J].建筑结构,2012,42(1):37-40.
ZHAO Chang-jun,FAN Zhong,PENG Yi,et al.Construction Simulation Analysis on Large-span Roof Structure of Suzhou Railway Station[J].Building Structure,2012,42(1):37-40.
[26]孟祥冲,魏丹阳,梁 锐,等.大跨度预应力空间钢结构分区分级阶梯式落架技术[J].施工技术,2015,30(9):78-82.
MENG Xiang-chong,WEI Dan-yang,LIANG Rui,et al.Temporary Support Stepped Removing Technology with Divisions and Classifications for Long-span Prestressed Spatial Steel Structure[J].Construction Technology,2015,30(9):78-82.
[27]韩 杰,黄 浩,赵 超.某超高层建筑悬挑钢结构施工模拟分析及现场监测[J].施工技术,2013,42(8):40-42.
HAN Jie,HUANG Hao,ZHAO Chao.Construction Simulation and Monitoring of the Cantilever Steel Structure of a High-rise Building[J].Construction Technology,2013,42(8):40-42.
[28]何 荣,陈以一,王剑非,等.曲靖体育场钢屋盖支撑卸载过程及模拟分析[J].施工技术,2014,43(2):58-61.
HE Rong,CHEN Yi-yi,WANG Jian-fei,et al.Temporary Support Removal Process and Simulation of Qujing Stadium[J].Construction Technology,2014,43(2):58-61.

相似文献/References:

[1]雷 拓,刘 宜,李 坤,等.剪力墙结构置换加固应力重分布[J].建筑科学与工程学报,2020,37(05):132.[doi:10.19815/j.jace.2020.05026]
 LEI Tuo,LIU Yi,LI Kun,et al.Stress Redistribution of Shear Wall Structure with Replacement Reinforcement[J].Journal of Architecture and Civil Engineering,2020,37(01):132.[doi:10.19815/j.jace.2020.05026]

备注/Memo

备注/Memo:
收稿日期:2019-01-24
基金项目:国家自然科学基金项目(51778273); 甘肃省住房和城乡建设厅科研项目(JK2018-17)
作者简介:王秀丽(1963-),女,辽宁沈阳人,教授,博士研究生导师,工学博士,E-mail:1135739056@qq.com。
更新日期/Last Update: 2020-01-13