[1] MALVAR L J.Bond of Reinforcement Under Controlled Confinement[J].ACI Materials Journal,1992,89(6):593-601.
[2]MOOSAVI M,JAFARI A,KHOSRAVI A.Bond of Cement Grouted Reinforcing Bars Under Constant Radial Pressure[J].Cement and Concrete Composites,2005,27(1):103-109.
[3]LING J H,RAHMAN A B A,IBRAHIM I S,et al.Behaviour of Grouted Pipe Splice Under Incremental Tensile Load[J].Construction and Building Materials,2012,33:90-98.
[4]LING J H,RAHMAN A B A,IBRAHIM I S,et al.Feasibility Study of Grouted Splice Connector Under Tensile Load[J].Construction and Building Materials,2014,50:530-539.
[5]LING J H,RAHMAN A B A,IBRAHIM I S,et al.Tensile Capacity of Grouted Splice Sleeves[J].Engineering Structures,2016,111:285-296.
[6]EINEA A,YAMANE T,TADROS M K.Grout-filled Pipe Splices for Precast Concrete Construction[J].PCI Journal,1995,40(1):82-93.
[7]RAHMAN A B A,HONG T K,IBRAHIM I S,et al.Influence of Rectangular Steel Splice-sleeve for Precast Concrete Connection[J].Jurnal Teknologi:Sciences & Engineering,2015,77(12):45-54.
[8]RAHMAN A B A,MAHDINEZHAD M,IBRAHIM I S,et al.Bond Stress in Grouted Spiral Connections[J].Jurnal Teknologi:Sciences & Engineering,2015,77(23):49-57.
[9]郑永峰,郭正兴,曹 江.新型灌浆套筒的约束机理及约束应力分布[J].哈尔滨工业大学学报,2015,47(12):106-111.
ZHENG Yong-feng,GUO Zheng-xing,CAO Jiang.Confinement Mechanism and Confining Stress Distribution of New Grouting Coupler for Rebars Splicing[J].Journal of Harbin Institute of Technology,2015,47(12):106-111.
[10]郑永峰,郭正兴.变形灌浆套筒连接性能试验研究及有限元分析[J].建筑结构学报,2016,37(3):94-102.
ZHENG Yong-feng,GUO Zheng-xing.Experimental Study and Finite Element Analysis on Behavior of Deformed Gout-filled Pipe Splice[J].Journal of Building Structures,2016,37(3):94-102.
[11]ZHENG Y F,GUO Z X.Parametric Study on a Novel Grouted Rolling Pipe Splice for Precast Concrete Construction[J].Construction and Building Materials,2018,166:452-463.
[12]JGJ 107—2010,钢筋机械连接技术规程[S].
JGJ 107—2010,Technical Specification for Mechanical Splicing of Steel Reinforcing Bars[S].
[13]姜洪斌,张海顺,刘文清,等.预制混凝土插入式预留孔灌浆钢筋搭接试验[J].哈尔滨工业大学学报,2011,43(10):18-23.
JIANG Hong-bin,ZHANG Hai-shun,LIU Wen-qing,et al.Experimental Study on Plug-in Filling Hole for Steel Bar Lapping of Precast Concrete Structure[J].Journal of Harbin Institute of Technology,2011,43(10):18-23.
[14]余 琼,许志远,袁炜航,等.两种因素影响下套筒约束浆锚搭接接头拉伸试验[J].哈尔滨工业大学学报,2016,48(12):34-42.
YU Qiong,XU Zhi-yuan,YUAN Wei-hang,et al.Experimental Study of Grouted Sleeve Lapping Connectors Varied in Two Factors Under Tensile Load[J].Journal of Harbin Institute of Technology,2016,48(12):34-42.
[15]JG/T 398—2012,钢筋连接用灌浆套筒[S].
JG/T 398—2012,The Grouting Coupler for Rebars Splicing[S].
[16]赵卫平,肖建庄.带肋钢筋与混凝土间粘结滑移本构模型[J].工程力学,2011,28(4):164-171.
ZHAO Wei-ping,XIAO Jian-zhuang.On Bond-slip Constitutive Model Between Ribbed Steel Bars and Concrete[J].Engineering Mechanics,2011,28(4):164-171.
[17]JANSSON P O.Evaluation of Grout-filled Mechanical Splices for Precast Concrete[R].Lansing:Michigan Department of Transportation,2008.
[18]COOGLER K L,HARRIES K A,GALLICK M.Experimental Study of Offset Mechanical Lap Splice Behavior[J].ACI Structural Journal,2008,105(4):478-487.
[19]LIM C T.The Effect of Pitch Distance of Steel Spiral Reinforcement to the Performance of Grouted Sleeve Connector Under Direct Tensile Load[R].Kuala Lumpur:University of Technology Malaysia,2010.
[20]SOROUSHIAN P,CHOI K B,PARK G H,et al.Bond of Deformed Bars to Concrete:Effects of Confinement and Strength of Concrete[J].ACI Materials Journal,1991,88(3):227-232.
[21]LOH H Y.Development of Grouted Splice Sleeve and Its Performance Under Axial Tension[R].Kuala Lumpur:University of Technology Malaysia,2008.
[22]UNTRAUER R E,HENRY R L.Influence of Normal Pressure on Bond Strength[J].ACI Journal Proceedings,1965,65(5):577-585.
[23]ROBINS P J,STANDISH I G.The Influence of Lateral Pressure upon Anchorage Bond[J].Magazine of Concrete Research,1984,36(129):195-202.
[24]LEE G S.Parametric Studies of Sleeve Connector Using Steel Pipe With Spiral Steel for Precast Concrete Connection[R].Kuala Lumpur:University of Technology Malaysia,2008.
[1]梁力,李鑫,李明,等.预制混凝土桩体抗扭设计及试验[J].建筑科学与工程学报,2009,26(02):87.
LIANG Li,LI Xin,LI Ming,et al.Design and Experiment on Torsional Behaviors of
Precast Concrete Pile Body[J].Journal of Architecture and Civil Engineering,2009,26(02):87.