|本期目录/Table of Contents|

[1]雷 拓,刘 宜,李 坤,等.剪力墙结构置换加固应力重分布[J].建筑科学与工程学报,2020,37(05):132-141.[doi:10.19815/j.jace.2020.05026]
 LEI Tuo,LIU Yi,LI Kun,et al.Stress Redistribution of Shear Wall Structure with Replacement Reinforcement[J].Journal of Architecture and Civil Engineering,2020,37(05):132-141.[doi:10.19815/j.jace.2020.05026]
点击复制

剪力墙结构置换加固应力重分布(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
37卷
期数:
2020年05期
页码:
132-141
栏目:
出版日期:
2020-09-30

文章信息/Info

Title:
Stress Redistribution of Shear Wall Structure with Replacement Reinforcement
文章编号:
1673-2049(2020)05-0132-10
作者:
雷 拓1,刘 宜1,李 坤1,蒋冬启2,董军锋3
1. 长安大学 建筑工程学院,陕西 西安 710061; 2. 南京理工大学 土木工程系,江苏 南京 210094; 3. 陕西省建筑科学研究院有限公司,陕西 西安 710082
Author(s):
LEI Tuo1, LIU Yi1, LI Kun1, JIANG Dong-qi2, DONG Jun-feng3
1. School of Civil Engineering, Chang’an University, Xi’an 710061, Shaanxi, China; 2. Department of Civil Engineering, Nanjing University of Science & Technology, Nanjing 210094, Jiangsu, China; 3. Shaanxi Architecture Science Research Institute Co.,
关键词:
剪力墙 置换加固 施工监测 生死单元法 应力重分布 受压承载力
Keywords:
shear wall replacement reinforcement construction monitoring life and death element method stress redistribution compression bearing capacity
分类号:
TU375
DOI:
10.19815/j.jace.2020.05026
文献标志码:
A
摘要:
为深入揭示无支撑置换混凝土加固过程中剪力墙的受力变化规律,对某剪力墙住宅结构无支撑置换加固施工进行全过程监测。基于ABAQUS有限元分析软件,采用生死单元、等效升温以及添加场变量的方法实现剪力墙施工全过程模拟。结合施工监测数据及有限元模拟结果分析了置换剪力墙及与置换剪力墙相连的梁、楼板受力变化过程; 最后给出了考虑应力重分布后,无支撑分段置换墙体正截面受压承载力计算方法。结果表明:有限元模拟方法能有效模拟混凝土无支撑置换加固施工过程; 由于剪力墙分段拆除和置换,墙体出现了应力重分布现象,且应力重分布程度与墙体分段施工顺序有关; 应力重分布会引起墙体洞口处出现应力集中,但应力集中对加固效果的影响较小,同时还会影响与置换剪力墙相邻的连梁、楼板结构的受力,导致该处应力增加; 建议对剪力墙结构进行无支撑置换加固时,有必要通过分段优化设计和受压承载力复核控制应力重分布的影响。
Abstract:
In order to reveal the stress variation law of shear wall during the reinforcement process of unsupported replacement concrete, the whole process monitoring of a shear wall residential building without support replacement reinforcement was carried out. Based on ABAQUS finite element analysis software, the whole process of shear wall construction was simulated by using life and death element, equivalent temperature rise and field variables. Combined with construction monitoring data and finite element simulation results, the stress change process of replacement shear wall, beam and floor connected with replacement shear wall was analyzed. Finally, the calculation method of the normal section bearing capacity of the unsupported segmental replacement wall was given after considering the stress redistribution. The results show that the finite element simulation method can effectively simulate the construction process of concrete without support replacement reinforcement. Due to the sectional demolition and replacement of shear wall, stress redistribution occurs in the wall, and the degree of stress redistribution is related to the construction sequence of wall segments. Stress redistribution will cause stress concentration at the wall opening, but the stress concentration has little effect on the reinforcement effect. At the same time, it will also affect the stress of coupling beam and floor structure adjacent to the replacement shear wall, resulting in the increase of stress. It is suggested that it is necessary to control the influence of stress redistribution through sectional optimization design and compression bearing capacity recheck when strengthening shear wall structure without support.

参考文献/References:

[1] 张 可,熊进刚,胡华章.高性能灌浆料置换加固混凝土柱轴心受压性能分析[J].南昌大学学报:工科版,2016,38(4):340-346.
ZHANG Ke,XIONG Jin-gang,HU Hua-zhang.Analysis on Property of Reinforced Concrete Column Strengthened by Replacing Section with High Performance CGM[J].Journal of Nanchang University:Engineering & Technology,2016,38(4):340-346.
[2]郑文杰,舒 杰,贺子倬.某旧城改造工程混凝土剪力墙置换处理[J].施工技术,2015,44(4):53-56.
ZHENG Wen-jie,SHU Jie,HE Zi-zhuo.Replacement of RC Shear Wall in an Old City Transformation Project[J].Construction Technology,2015,44(4):53-56.
[3]谢洪阳,陈 斌,王诗祥.置换混凝土加固施工技术[J].施工技术,2015,44(16):39-41.
XIE Hong-yang,CHEN Bin,WANG Shi-xiang.Strengthening Technique of Replacing Concrete[J].Construction Technology,2015,44(16):39-41.
[4]温 斌,徐 芳.高层建筑层间剪力墙混凝土置换加固施工技术[J].施工技术,2018,47(16):111-113.
WEN Bin,XU Fang.Construction Technology of Reinforced Concrete Replacement for High-rise Building Interlayer Shear Wall[J].Construction Technology,2018,47(16):111-113.
[5]李春涛,张 力,栗增欣,等.分段置换混凝土在某高层住宅加固中的应用[J].建筑科学,2018,34(3):111-117.
LI Chun-tao,ZHANG Li,LI Zeng-xin,et al.Application of Concrete-replacing Method in Reinforcement of a High Rise Residential Building[J].Building Science,2018,34(3):111-117.
[6]胡克旭,赵志鹏.混凝土置换法在某短肢剪力墙高层住宅加固中的应用[J].结构工程师,2015,31(5):172-177.
HU Ke-xu,ZHAO Zhi-peng.Application of Concrete-replacing Method in Reinforcement of a High-rise Short-leg Shear Wall Residential Building[J].Structural Engineers,2015,31(5):172-177.
[7]张吉柱,李 荻,杨燕艳.置换混凝土技术在高层剪力墙结构加固中的应用[J].建筑科学,2019,35(11):126-132.
ZHANG Ji-zhu,LI Di,YANG Yan-yan.Application of Concrete Replacement Technology in Reinforcement of High-rise Shear Wall Structures[J].Building Science,2019,35(11):126-132.
[8]柯 杨,李天水,谷 倩,等.高性能水泥基灌浆料配合比设计的实践与验证[J].硅酸盐通报,2018,37(10):3154-3160,3172.
KE Yang,LI Tian-shui,GU Qian,et al.Practice and Verification of Mix Proportion Design of High Performance Cement-based Grouting Material[J].Bulletin of the Chinese Ceramic Society,2018,37(10):3154-3160,3172.
[9]李向民,高润东,许清风,等.装配整体式混凝土结构套筒不同位置修复灌浆缺陷的试验研究[J].建筑结构,2019,49(24):93-97.
LI Xiang-min,GAO Run-dong,XU Qing-feng,et al.Experimental Study on Repairing Grouting Defects at Different Positions of Sleeve of Monolithic Precast Concrete Structure[J].Building Structure,2019,49(24):93-97.
[10]钱稼茹,张微敬,赵作周,等.北京大学体育馆钢屋盖施工模拟与监测[J].土木工程学报,2009,42(9):13-20.
QIAN Jia-ru,ZHANG Wei-jing,ZHAO Zuo-zhou,et al.Simulation and Monitoring for the Construction of the Steel Roof of the Peking University Gymnasium[J].China Civil Engineering Journal,2009,42(9):13-20.
[11]POPESCU C,SAS G,SABAU C,et al.Effect of Cut-out Openings on the Axial Strength of Concrete Walls[J].Journal of Structural Engineering,2016,142(11):4016100.
[12]NAO-AKI N,YUNONG S,REI T,et al.Relationship Between Strain Rate Concentration Factor and Stress Concentration Factor[J].Theoretical and Applied Fracture Mechanics,2017,90:218-227.
[13]SHAN C L,YI Y H.Stress Concentration Analysis of an Orthotropic Sandwich Bridge Deck Under Wheel Loading[J].Journal of Constructional Steel Research,2016,122:488-494.
[14]STAZI F,SERPILLI M,MARACCHINI G,et al.An Experimental and Numerical Study on CLT Panels Used as Infill Shear Walls for RC Buildings Retrofit[J].Construction and Building Materials,2019,211:605-616.
[15]SABAU C,POPESCU C,BAGGE N,et al.Local and Global Behavior of Walls with Cut-out Openings in Multi-story Reinforced Concrete Buildings[J].Engineering Structures,2019,187:57-72.
[16]田连波,侯建国.ABAQUS中混凝土塑性损伤因子的合理取值研究[J].湖北大学学报:自然科学版,2015,37(4):340-345,358.
TIAN Lian-bo,HOU Jian-guo.Reasonable Plastic Damaged Factor of Concrete Damaged Plastic Model of ABAQUS[J].Journal of Hubei University:Natural Science,2015,37(4):340-345,358.
[17]吴 元,王 凯,杨晓婧,等.水泥基灌浆料基本力学性能试验研究[J].建筑结构,2014,44(19):95-98,6.
WU Yuan,WANG Kai,YANG Xiao-jing,et al.Experimental Study on Basic Mechanical Properties of Cementitious Grout[J].Building Structure,2014,44(19):95-98,6.
[18]李承铭,马俊杰,刘智龙.基于ANSYS的混凝土壳体结构的收缩徐变研究分析[J].建筑结构,2015,45(增1):516-520.
LI Cheng-ming,MA Jun-jie,LIU Zhi-long.Analysis and Research on the Shrinkage and Creep of Concrete Shell Structure Based on ANSYS[J].Building Structure,2015,45(S1):516-520.
[19]赵更歧,肖 水,鲁 渊,等.剪力墙开洞结构受力性能的研究[J].世界地震工程,2014,30(3):24-27.
ZHAO Geng-qi,XIAO Shui,LU Yuan,et al.Study on Structure Performance of the Hole on Shear Wall[J].World Earthquake Engineering,2014,30(3):24-27.
[20]谭 林,郭 原.开孔有限平板应力集中问题的有限元分析[J].重庆理工大学学报:自然科学,2015,29(7):35-39.
TAN Lin,GUO Yuan.Finite Element Analysis of Finite Plates for Stress Concentration of Holes[J].Journal of Chongqing University of Technology:Natural Science,2015,29(7):35-39.
[21]宋天舒,吴林志,杜善义,等.圆柱壳非圆大开孔的应力集中研究[J].工程力学,2000,17(6):47-52.
SONG Tian-shu,WU Lin-zhi,DU Shan-yi,et al.Stress Concentration on Thin Cylindrical Shells with Large Non-circular Openings[J].Engineering Mechanics,2000,17(6):47-52.

相似文献/References:

[1]马恺泽,郭 辉,韩晓飞,等.对抗震规范中基于性能设计方法的研究[J].建筑科学与工程学报,2013,30(03):56.
 MA Kai-ze,GUO Hui,HAN Xiao-fei,et al.Research on Performance-based Design Method of China Code for Seismic Design of Buildings[J].Journal of Architecture and Civil Engineering,2013,30(05):56.
[2]范 重,刘 畅,吴 徽.多连梁剪力墙抗震性能研究[J].建筑科学与工程学报,2014,31(04):125.
 FAN Zhong,LIU Chang,WU Hui.Research on Seismic Behavior of Multi-coupling Beams in Shear Wall Structure[J].Journal of Architecture and Civil Engineering,2014,31(05):125.
[3]黄 靓,王启明,陈 伟,等.低轴压比下自保温无砂浆配筋砌体剪力墙抗震性能[J].建筑科学与工程学报,2018,35(01):51.
 HUANG Liang,WANG Qi-ming,CHEN Wei,et al.Low Axial Compression Ratio on Seismic Behavior of Self-insulation Mortarless Reinforced Masonry Shear Walls[J].Journal of Architecture and Civil Engineering,2018,35(05):51.
[4]赵 军,沈富强,司晨哲,等.CFRP筋/钢筋混凝土剪力墙抗震性能试验[J].建筑科学与工程学报,2018,35(05):46.
 ZHAO Jun,SHEN Fu-qiang,SI Chen-zhe,et al.Experiment on Seismic Performance of Shear Wall Reinforced with CFRP Bars and Steel Bars[J].Journal of Architecture and Civil Engineering,2018,35(05):46.
[5]朱 倩,贾新宇,刘金烨,等.钢管混凝土边框剪力墙受剪承载力计算方法对比研究[J].建筑科学与工程学报,2023,40(04):97.[doi:10.19815/j.jace.2022.04045]
 ZHU Qian,JIA Xinyu,LIU Jinye,et al.Comparative study on shear capacity calculation method for shear walls with CFST columns[J].Journal of Architecture and Civil Engineering,2023,40(05):97.[doi:10.19815/j.jace.2022.04045]

备注/Memo

备注/Memo:
收稿日期:2020-05-14
基金项目:国家自然科学基金项目(51808292); 江苏省自然科学基金项目(BK20180487)
作者简介:雷 拓(1973-),男,陕西岐山人,副教授,工学博士,E-mail:Leituo616@163.com。
更新日期/Last Update: 2020-10-15