[1] KOYAMA Y.Present Status and Technology of Shield Tunnelling Method in Japan[J].Tunneling and Underground Space Technology,2003,18(2/3):145-159.
[2]DOBASHI H,SHIRATORI A,MIYAMA D,et al.Design and Construction of Enlarging Shield Tunnel Sections of Large Dimensional Shield Tunnels for the Non-open-cut Method[J].Tunnelling and Underground Space Technology,2006,21(3/4):249.
[3]楼如岳.三圆型盾构掘进机应用于日本大阪地铁工程[J].地下工程与隧道,1995(3):8.
LOU Ru-yue.Triple Circle Shield Boring on Osaka Metro Project in Japan[J].Underground Engineering and Tunnel,1995(3):8.
[4]何 川,丁建隆,李 围.配合盾构法修建地铁车站的技术方案[J].西南交通大学学报,2005,40(3):293-297.
HE Chuan,DING Jian-long,LI Wei.Technical Schemes for Metro Station Construction Based on Shield Method[J].Journal of Southwest Jiaotong University,2005,40(3):293-297.
[5]管攀峰,郭振坤,陈 鸿,等.结合盾构法修建地铁车站方案综述[J].公路交通技术,2018,34(增1):139-146.
GUAN Pan-feng,GUO Zhen-kun,CHEN Hong,et al.An Overview of the Metro Station Building Schemes Combined with Shield Construction[J].Technology of Highway and Transport,2018,34(S1):139-146.
[6]张新金.盾构法与浅埋暗挖法结合建造地铁车站关键技术研究[D].北京:北京交通大学,2010.
ZHNAG Xin-jin.Study on Key Technologies of the Metro Station Constructed by Shield Tunneling Method Combined with Mining Method[D].Beijing:Beijing Jiaotong University,2010.
[7]刘维宁,路美丽,张新金,等.盾构法和浅埋暗挖法结合建造地铁车站的模型试验[J].岩石力学与工程学报,2009,28(8):1629-1639.
LIU Wei-ning,LU Mei-li,ZHANG Xin-jin,et al.Model Test on Metro Station Constructed by Combination of Shield Method and Shallow-buried Tunneling Method[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(8):1629-1639.
[8]路美丽.盾构先行条件下拓展地铁车站的方案研究及风险分析[D].北京:北京交通大学,2007.
LU Mei-li.Study on Schemes and Risk Analysis of the Expanded Metro Station Under Shield Running Tunnel[D].Beijing:Beijing Jiaotong University,2007.
[9]陈 峰.盾构法与浅埋暗挖法结合修建地铁车站施工过程动态数值分析——以北京地铁4号线为例[J].隧道建设,2015,35(4):335-341.
CHEN Feng.Dynamic Numerical Analysis on a Metro Station on Line 4 of Beijing Metro Constructed by Shield Method and Shallow-covered Mining Method[J].Tunnel Construction,2015,35(4):335-341.
[10]丁德云,鲁卫东,杨秀仁,等.大直径盾构隧道扩挖地铁车站的力学性能研究[J].岩土力学,2010,31(增2):281-287.
DING De-yun,LU Wei-dong,YANG Xiu-ren,et al.Study of Mechanical Performance of Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].Rock and Soil Mechanics,2010,31(S2):281-287.
[11]彭智勇,刘维宁,丁德云,等.大直径盾构隧道分块型K管片接触面力学性能的试验研究[J],中国铁道科学,2013,34(5):39-45.
PENG Zhi-yong,LIU Wei-ning,DING De-yun,et al.Experimental Study on the Mechanical Properties of the Interface on Partitioned Key Segment of Large-diameter Shield Tunnel[J].China Railway Science,2013,34(5):39-45.
[12]丁德云,杨秀仁,鲁卫东,等.大直径盾构施工对地铁暗挖风道影响数值分析[J].岩土工程学报,2011,33(增1):395-400.
DING De-yun,YANG Xiu-ren,LU Wei-dong,et al.Numerical Analysis of Influence of Large-diameter Shield Tunneling on Underground Ventilation Adit of Metro Station[J].Chinese Journal of Geotechnical Engineering,2011,33(S1):395-400.
[13]王 芳,汪 挺,贺少辉,等.PBA法扩挖大直径盾构隧道修建地铁车站时结构关键节点的受力分析[J].中国铁道科学,2013,34(5):54-62.
WANG Fang,WANG Ting,HE Shao-hui,et al.Mechanical Behavior of Critical Joints in Enlarging Large Diameter Shield Tunnel by PBA Method to Build Metro Station[J].China Railway Science,2013,34(5):54-62.
[14]王 芳.PBA法扩挖大直径盾构隧道修建地铁车站风险辨识与控制研究[D].北京:北京交通大学,2013.
WANG Fang.Study for Risk Identification and Control of Building a Metro Station by Enlarging a Existing Large Diameter Shield Tunnel Using PBA Method[D].Beijing:Beijing Jiaotong University,2013.
[15]南骁聪.大直径盾构结合PBA法修建地铁车站三维数值分析[D].北京:北京交通大学,2012.
NAN Xiao-cong. Three-dimensional Numerical Analysis of Metro Station Construction by Large Diameter Shield Tunneling Combined with PBA Method[D].Beijing:Beijing Jiaotong University,2012.
[16]孙长军,张顶立,郑 昊,等.大盾构扩挖车站受力转换及施工关键技术研究[J].土木工程学报,2015,48(增1):293-296.
SUN Chang-jun,ZHANG Ding-li,ZHENG Hao,et al.Study of Key Construction Technique and Mechanical Performance of Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].China Civil Engineering Journal,2015,48(S1):293-296.
[17]汪 波,李兆平,汪 挺,等.基于大直径盾构隧道扩挖地铁车站关键技术研究[J].土木工程学报,2015,48(增1):373-377.
WANG Bo,LI Zhao-ping,WANG Ting,et al.A Study of Key Construction Technology on Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].China Civil Engineering Journal,2015,48(S1):373-377.
[18]曾 鹏.盾构法结合CRD法建造地铁车站方案研究[D].北京:北京交通大学,2011.
ZENG Peng.Research on the Construction Schemes of Metro Station by Combine with Shield Method and CRD Method[D].Beijing:Beijing Jiaotong University,2011.
[19]朱合华,丁文其,李晓军.盾构隧道施工力学性态模拟及工程应用[J].土木工程学报,2000,33(3):98-103.
ZHU He-hua,DING Wen-qi,LI Xiao-jun.Construction Simulation for the Mechanical Behavior of Shield Tunnel and Its Application[J].China Civil Engineering Journal,2000,33(3):98-103.
[20]冯紫良,朱志伟.岩土工程施工过程中体系演变问题的分析方法[J].岩土工程学报,1999,21(3):366-369.
FENG Zi-liang,ZHU Zhi-wei.On the Numerical Analysis of Changeable System in Construction of Geotechnical Engineering[J].Chinese Journal of Geotechnical Engineering,1999,21(3):366-369.
[1] KOYAMA Y.Present Status and Technology of Shield Tunnelling Method in Japan[J].Tunneling and Underground Space Technology,2003,18(2/3):145-159.
[2]DOBASHI H,SHIRATORI A,MIYAMA D,et al.Design and Construction of Enlarging Shield Tunnel Sections of Large Dimensional Shield Tunnels for the Non-open-cut Method[J].Tunnelling and Underground Space Technology,2006,21(3/4):249.
[3]楼如岳.三圆型盾构掘进机应用于日本大阪地铁工程[J].地下工程与隧道,1995(3):8.
LOU Ru-yue.Triple Circle Shield Boring on Osaka Metro Project in Japan[J].Underground Engineering and Tunnel,1995(3):8.
[4]何 川,丁建隆,李 围.配合盾构法修建地铁车站的技术方案[J].西南交通大学学报,2005,40(3):293-297.
HE Chuan,DING Jian-long,LI Wei.Technical Schemes for Metro Station Construction Based on Shield Method[J].Journal of Southwest Jiaotong University,2005,40(3):293-297.
[5]管攀峰,郭振坤,陈 鸿,等.结合盾构法修建地铁车站方案综述[J].公路交通技术,2018,34(增1):139-146.
GUAN Pan-feng,GUO Zhen-kun,CHEN Hong,et al.An Overview of the Metro Station Building Schemes Combined with Shield Construction[J].Technology of Highway and Transport,2018,34(S1):139-146.
[6]张新金.盾构法与浅埋暗挖法结合建造地铁车站关键技术研究[D].北京:北京交通大学,2010.
ZHNAG Xin-jin.Study on Key Technologies of the Metro Station Constructed by Shield Tunneling Method Combined with Mining Method[D].Beijing:Beijing Jiaotong University,2010.
[7]刘维宁,路美丽,张新金,等.盾构法和浅埋暗挖法结合建造地铁车站的模型试验[J].岩石力学与工程学报,2009,28(8):1629-1639.
LIU Wei-ning,LU Mei-li,ZHANG Xin-jin,et al.Model Test on Metro Station Constructed by Combination of Shield Method and Shallow-buried Tunneling Method[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(8):1629-1639.
[8]路美丽.盾构先行条件下拓展地铁车站的方案研究及风险分析[D].北京:北京交通大学,2007.
LU Mei-li.Study on Schemes and Risk Analysis of the Expanded Metro Station Under Shield Running Tunnel[D].Beijing:Beijing Jiaotong University,2007.
[9]陈 峰.盾构法与浅埋暗挖法结合修建地铁车站施工过程动态数值分析——以北京地铁4号线为例[J].隧道建设,2015,35(4):335-341.
CHEN Feng.Dynamic Numerical Analysis on a Metro Station on Line 4 of Beijing Metro Constructed by Shield Method and Shallow-covered Mining Method[J].Tunnel Construction,2015,35(4):335-341.
[10]丁德云,鲁卫东,杨秀仁,等.大直径盾构隧道扩挖地铁车站的力学性能研究[J].岩土力学,2010,31(增2):281-287.
DING De-yun,LU Wei-dong,YANG Xiu-ren,et al.Study of Mechanical Performance of Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].Rock and Soil Mechanics,2010,31(S2):281-287.
[11]彭智勇,刘维宁,丁德云,等.大直径盾构隧道分块型K管片接触面力学性能的试验研究[J],中国铁道科学,2013,34(5):39-45.
PENG Zhi-yong,LIU Wei-ning,DING De-yun,et al.Experimental Study on the Mechanical Properties of the Interface on Partitioned Key Segment of Large-diameter Shield Tunnel[J].China Railway Science,2013,34(5):39-45.
[12]丁德云,杨秀仁,鲁卫东,等.大直径盾构施工对地铁暗挖风道影响数值分析[J].岩土工程学报,2011,33(增1):395-400.
DING De-yun,YANG Xiu-ren,LU Wei-dong,et al.Numerical Analysis of Influence of Large-diameter Shield Tunneling on Underground Ventilation Adit of Metro Station[J].Chinese Journal of Geotechnical Engineering,2011,33(S1):395-400.
[13]王 芳,汪 挺,贺少辉,等.PBA法扩挖大直径盾构隧道修建地铁车站时结构关键节点的受力分析[J].中国铁道科学,2013,34(5):54-62.
WANG Fang,WANG Ting,HE Shao-hui,et al.Mechanical Behavior of Critical Joints in Enlarging Large Diameter Shield Tunnel by PBA Method to Build Metro Station[J].China Railway Science,2013,34(5):54-62.
[14]王 芳.PBA法扩挖大直径盾构隧道修建地铁车站风险辨识与控制研究[D].北京:北京交通大学,2013.
WANG Fang.Study for Risk Identification and Control of Building a Metro Station by Enlarging a Existing Large Diameter Shield Tunnel Using PBA Method[D].Beijing:Beijing Jiaotong University,2013.
[15]南骁聪.大直径盾构结合PBA法修建地铁车站三维数值分析[D].北京:北京交通大学,2012.
NAN Xiao-cong. Three-dimensional Numerical Analysis of Metro Station Construction by Large Diameter Shield Tunneling Combined with PBA Method[D].Beijing:Beijing Jiaotong University,2012.
[16]孙长军,张顶立,郑 昊,等.大盾构扩挖车站受力转换及施工关键技术研究[J].土木工程学报,2015,48(增1):293-296.
SUN Chang-jun,ZHANG Ding-li,ZHENG Hao,et al.Study of Key Construction Technique and Mechanical Performance of Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].China Civil Engineering Journal,2015,48(S1):293-296.
[17]汪 波,李兆平,汪 挺,等.基于大直径盾构隧道扩挖地铁车站关键技术研究[J].土木工程学报,2015,48(增1):373-377.
WANG Bo,LI Zhao-ping,WANG Ting,et al.A Study of Key Construction Technology on Metro Station Constructed by Enlarging Large Diameter Shield Tunnel[J].China Civil Engineering Journal,2015,48(S1):373-377.
[18]曾 鹏.盾构法结合CRD法建造地铁车站方案研究[D].北京:北京交通大学,2011.
ZENG Peng.Research on the Construction Schemes of Metro Station by Combine with Shield Method and CRD Method[D].Beijing:Beijing Jiaotong University,2011.
[19]朱合华,丁文其,李晓军.盾构隧道施工力学性态模拟及工程应用[J].土木工程学报,2000,33(3):98-103.
ZHU He-hua,DING Wen-qi,LI Xiao-jun.Construction Simulation for the Mechanical Behavior of Shield Tunnel and Its Application[J].China Civil Engineering Journal,2000,33(3):98-103.
[20]冯紫良,朱志伟.岩土工程施工过程中体系演变问题的分析方法[J].岩土工程学报,1999,21(3):366-369.
FENG Zi-liang,ZHU Zhi-wei.On the Numerical Analysis of Changeable System in Construction of Geotechnical Engineering[J].Chinese Journal of Geotechnical Engineering,1999,21(3):366-369.