[1] LEE T H,IM J C,KIM C,et al.An Experimental Study for Reinforcing the Ground Underneath a Footing Using Micropiles[J].Geotechnical Testing Journal,2018,41(4):648-663.
[2]BORTHAKUR N,DEY A K.Experimental Investigation on Load Carrying Capacity of Micropiles in Soft Clay[J].Arabian Journal for Science and Engineering,2018,43(4):1969-1981.
[3]蔡 强,石胜伟,韩新强,等.两种距径比下微型组合抗滑桩物理模型试验[J].长江科学院院报,2015,32(11):66-70,77.
CAI Qiang,SHI Sheng-wei,HAN Xin-qiang,et al.Physical Model Test of Micro-pile Composite Structure Under Two Ratios of Spacing to Diameter[J].Journal of Yangtze River Scientific Research Institute,2015,32(11):66-70,77.
[4]冯 君,周德培,江 南,等.微型桩体系加固顺层岩质边坡的内力计算模式[J].岩石力学与工程学报,2006,25(2):284-288.
FENG Jun,ZHOU De-pei,JIANG Nan,et al.A Model for Calculation of Internal Force of Micropile System to Reinforce Bedding Rock Slope[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(2):284-288.
[5]黄 新,周国钧.水泥加固土硬化机理初探[J].岩土工程学报,1994,16(1):62-68.
HUANG Xin,ZHOU Guo-jun.Hardening Mechanism of Cement-stabilized Soil[J].Chinese Journal of Geotechnical Engineering,1994,16(1):62-68.
[6]谭罗荣.对“水泥加固土硬化机理初探”一文的讨论[J].岩土工程学报,1995,17(6):129-130.
TAN Luo-rong.Discussion on “Hardening Mechanism of Cement-stabilized Soil”[J].Chinese Journal of Geotechnical Engineering,1995,17(6):129-130.
[7]谷天峰,孙忠弟,骆凤涛,等.水泥-黄土注浆充填材料的试验研究[J].工程地质学报,2014,22(1):98-105.
GU Tian-feng,SUN Zhong-di,LUO Feng-tao,et al.Experimental Research on Loess Grouting Material for Coal Gob Filling[J].Journal of Engineering Geology,2014,22(1):98-105.
[8]俞永华,杨晓华.水泥黄土力学特性试验[J].长安大学学报(自然科学版),2003,23(6):29-32.
YU Yong-hua,YANG Xiao-hua.Experiments of Mechanic Property of Cement-loess[J].Journal of Chang'an University(Natural Science Edition),2003,23(6):29-32.
[9]张冠军,徐永福,傅德明.SMW工法型钢起拔试验研究及应用[J].岩石力学与工程学报,2002,21(3):444-448.
ZHANG Guan-jun,XU Yong-fu,FU De-ming.Testing Study and Application of Shape Steel Pullout in SMW Construction Method[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(3):444-448.
[10]李志伟.SMW工法型钢起拔力有限元分析[D].天津:天津大学,2008.
LI Zhi-wei.Finite Element Analysis of Pull-out Force of Shape Steel in SMW Engineering Method[D].Tianjin:Tianjin University,2008.
[11]李玉莹.黄土地区基坑注浆微型桩内置型钢回收的室内试验研究[D].西安:长安大学,2019.
LI Yu-ying.Laboratory Study on Steel Recycling of Grout Micro-pile in Loess Foundation Pit[D].Xi'an:Chang'an University,2019.
[12]周燕晓,黄 新,麻志刚.型钢水泥土构件界面粘结应力试验研究[J].路基工程,2010(4):165-167.
ZHOU Yan-xiao,HUANG Xin,MA Zhi-gang.Experimental Study on Bond Stress of Profile Bars Reinforced Cement Soil Component Interface[J].Subgrade Engineering,2010(4):165-167.
[13]顾士坦,郭 英,任振群,等.基坑SMW工法型钢起拔力的工程实测分析[J].四川建筑科学研究,2011,37(4):133-135,159.
GU Shi-tan,GUO Ying,REN Zhen-qun,et al.Engineering Actual Measurement Analysis of Shaped Steel Pull-out Force of SMW Engineering Method in Foundation Pits[J].Sichuan Building Science,2011,37(4):133-135,159.
[14]《地基处理手册》编写委员会.地基处理手册[M].2版.北京:中国建筑工业出版社,2000.
Foundation Treatment Manual Preparation Committee.Foundation Treatment Manual[M].2nd ed.Beijing:China Architecture & Building Press,2000.
[15]孔德志,冯娇伟,宋艳香.劲性水泥土桩连续墙的工作机理分析[J].岩土工程学报,2011,33(增2):43-46.
KONG De-zhi,FENG Jiao-wei,SONG Yan-xiang.Working Mechanism of Reinforced Soil-cement Mixing Wall[J].Chinese Journal of Geotechnical Engineering,2011,33(S2):43-46.
[16]黄 浩.水泥土室内试验及水泥土搅拌桩复合地基沉降研究[D].赣州:江西理工大学,2009.
HUANG Hao.Laboratory Test of Soil-cement and Settlement Study of Composite Foundation with Soil-cement Mixing Pile[D].Ganzhou:Jiangxi University of Science and Technology,2009.