[1] 姚昌荣,李亚东.基于静动力测试数据的斜拉桥模型修正[J].铁道学报,2008,30(3):65-70.
YAO Chang-rong,LI Ya-dong.Updating of Cable-stayed Bridges Model Based on Static and Dynamic Test Data[J].Journal of the China Railway Society,2008,30(3):65-70.
[2]李 波,屈文忠,曾又林.基于有限元模型修正技术的结构损伤检测[J].武汉大学学报(工学版),2008,41(5):102-105.
LI Bo,QU Wen-zhong,ZENG You-lin.Research on Structural Damage Detection Based on Finite Element Model Updating[J].Engineering Journal of Wuhan University,2008,41(5):102-105.
[3]GUO N,YANG Z C,WANG L,et al.Dynamic Model Updating Based on Strain Mode Shape and Natural Frequency Using Hybrid Pattern Search Technique[J].Journal of Sound and Vibration,2018,422:112-130.
[4]SCHOMMER S,NGUYEN V H,MAAS S,et al.Model Updating for Structural Health Monitoring Using Static and Dynamic Measurements[J].Procedia Engineering,2017,199:2146-2153.
[5]ASADOLLAHI P,HUANG Y,LI J.Bayesian Finite Element Model Updating and Assessment of Cable-stayed Bridges Using Wireless Sensor Data[J].Sensors,2018,18(9):3057.
[6]宋晓东,颜永逸,李佳靖,等.基于子结构的大型桥梁有限元模型修正方法[J].桥梁建设,2021,51(2):40-46.
SONG Xiao-dong,YAN Yong-yi,LI Jia-jing,et al.Substructure-based Finite Element Model Updating of Long-span Bridge[J].Bridge Construction,2021,51(2):40-46.
[7] 刘宇飞.基于模型修正与图像处理的多尺度结构损伤识别[D].北京:清华大学,2015.
LIU Yu-fei.Multi-scale Structural Damage Assessment Based on Model Updating and Image Processing[D].Beijing:Tsinghua University,2015.
[8]谢瑞杰.基于静动力有限元模型修正的既有钢筋混凝土拱桥承载能力评估[D].长沙:中南大学,2010.
XIE Rui-jie.Evaluation of Carrying Capacity of Existing Reinforced Concrete Arch Bridge Based on Modified Static Power Finite Element Model[D].Changsha:Central South University,2010.
[9]李贤东.基于准静态广义影响线的双曲拱桥承载力评定初步研究[D].重庆:重庆交通大学,2009.
LI Xian-dong.Preliminary Study on Load Rating of Two-way Curved Arch Bridge Based on Quasi-static Generalized Influence Line[D].Chongqing:Chongqing Jiaotong University,2009.
[10]史文军.基于准静态影响线的桥梁承载能力评估方法研究[D].天津:河北工业大学,2012.
SHI Wen-jun.Study of the Bridges Carrying Capacity Evaluation Method Based on the Quasi-static Influence Line[D].Tianjin:Hebei University of Technology,2012.
[11]曹广谦.基于应变影响线的简支梁桥结构损伤识别及寿命预测[D].南宁:广西大学,2016.
CAO Guang-qian.Damage Identification and Life Prediction of Simply Supported Girder Bridge Based on Strain Influence Line[D].Nanning:Guangxi University,2016.
[12]GOBLE G G,SAOUMA V,FRANGOPOL D M.Simple Load Capacity Tests for Bridges to Determine Safe Loading Posting Levels:1987-1990[R].Boulder:University of Colorado Boulder,1990.
[13]郭 亮.基于影响线有限元模型修正的桥梁承载能力评定方法研究[D].南宁:广西大学,2016.
GUO Liang.The Research of Evaluation Method of Bridge Load-bearing Capacity Based on Correcting Finite Element Model Using the Influence Line[D].Nanning:Guangxi University,2016.
[14]肖 祥,赵 曼,陈 一,等.基于实测影响线的大跨度桥梁有限元模型修正[J].工程与建设,2020,34(1):48-52.
XIAO Xiang,ZHAO Man,CHEN Yi,et al.A Element Model Updating Method Based on the Measured Influence Line for Large-span Bridges[J].Engineering and Construction,2020,34(1):48-52.
[15]CHEN Z W,CAI Q L,ZHU S Y.Damage Quantification of Beam Structures Using Deflection Influence Lines[J].Structural Control and Health Monitoring,2018,25(11):e2242.
[16]朱宏平,黄民水.基于环境激励的桥梁结构动力有限元模型修正研究[J].华中科技大学学报(城市科学版),2009,26(1):1-11.
ZHU Hong-ping,HUANG Min-shui.Study on Dynamic Finite Element Model Updating of Bridge Structures Based on Ambient Excitation[J].Journal of Huazhong University of Science and Technology(Urban Science Edition),2009,26(1):1-11.
[17]李伟钊,王宗林,李荣达,等.简支梁桥承载力以动代静快速评估方法[J].土木建筑与环境工程,2012,34(增1):191-195.
LI Wei-zhao,WANG Zong-lin,LI Rong-da,et al.Rapid Assessment of Load-bearing Capacity About Simple-supported Girder Bridge Based on Dynamic Test Instead of Static Loading Test[J].Journal of Civil,Architectural & Environmental Engineering,2012,34(S1):191-195.
[18]李鸿波,于品德.装配式梁桥荷载试验计算模型精细化分析[J].公路交通科技(应用技术版),2017,13(10):207-209.
LI Hong-bo,YU Pin-de.Fine Analysis of Prefabricated Beam Bridge Load Test[J].Highway Traffic Technology,2017,13(10):207-209.
[19]廖敬波,唐光武,张又进,等.实测准静态广义影响线在桥梁结构静载试验中的应用研究[J].公路交通技术,2009,25(6):65-68.
LIAO Jing-bo,TANG Guang-wu,ZHANG You-jin,et al.Research on Application of Measured Quasistatic Generalized Influence Line in Static Load Test for Bridge Structure[J].Technology of Highway and Transport,2009,25(6):65-68.