[1] 杨小威,许文杰,黎加纯.中国、日本、新加坡装配式建筑技术差异分析[J].建筑技术,2020,51(12):1483-1486.
YANG Xiaowei,XU Wenjie,LI Jiachun.Prefabricated construction technical differences among China,Japan and Singapore[J].Architecture Technology,2020,51(12):1483-1486.
[2]丁克伟,叶 堉.装配式混凝土梁柱节点抗震性能试验与数值模拟[J].建筑科学与工程学报,2021,38(4):24-32.
DING Kewei,YE Yu.Experiment and numerical simulation on seismic performance of new type of prefabricated concrete beam-column joint[J].Journal of Architecture and Civil Engineering,2021,38(4):24-32.
[3]高培楠,邓 扬,李爱群,等.装配式混凝土框架结构连接节点抗震性能研究进展[J].工业建筑,2021,51(2):171-185,152.
GAO Peinan,DENG Yang,LI Aiqun,et al.Review on seismic performance of connection joints of prefabricated concrete frame structures[J].Industrial Construction,2021,51(2):171-185,152.
[4]孙岩波,李晨光,杨 旭.装配式混凝土框架结构梁-板-柱节点抗震性能试验研究[J].建筑结构,2018,48(7):23-26.
SUN Yan-bo,LI Chen-guang,YANG Xu.Experimental study on seismic behavior of beam-slab-column joints of prefabricated concrete frame structure[J].Building Structure,2018,48(7):23-26.
[5]高 林,刘英利,张啸驰,等.预制装配框架结构灌浆套筒式节点试验研究[J].世界地震工程,2016,32(1):75-80.
GAO Lin,LIU Yingli,ZHANG Xiaochi,et al.Experimental study on grouting sleeve node of prefabricated frame structure[J].World Earthquake Engineering,2016,32(1):75-80.
[6]POPA V,PAPURCU A,COTOFANA D,et al.Experimental testing on emulative connections for precast columns using grouted corrugated steel sleeves[J].Bulletin of Earthquake Engineering,2015,13(8):2429-2447.
[7]KHOO J H,LI B,YIP W K.Tests on precast concrete frames with connections constructed away from column faces[J].ACI Structural Journal,2006,103(1):18-27.
[8]章一萍,隗 萍,张春雷,等.新型装配式混凝土框架结构后浇整体式梁柱节点研究[J].四川建筑科学研究,2017,43(3):110-115.
ZHANG Yiping,WEI Ping,ZHANG Chunlei,et al.Study on new cast-in-situ monolithic beam-column connections for precast frame structure[J].Sichuan Building Science,2017,43(3):110-115.
[9]杨 辉,郭正兴,许傲逸,等.局部后张预应力装配式混凝土框架梁柱节点抗震试验研究[J].东南大学学报(自然科学版),2019,49(6):1101-1108.
YANG Hui,GUO Zhengxing,XU Aoyi,et al.Experimental study on seismic behavior of local post-tensioned precast concrete beam-to-column connections[J].Journal of Southeast University(Natural Science Edition),2019,49(6):1101-1108.
[10]杨 曌,吕 伟,包 亮.基于螺栓连接的新型钢筋混凝土框架装配式节点抗震性能研究[J].工业建筑,2019,49(8):93-99.
YANG Zhao,LYU Wei,BAO Liang.Experimental research on seismic behavior of new RC frame assembly joints based on bolted connection[J].Industrial Construction,2019,49(8):93-99.
[11]阎西康,陈育苏,常璐平,等.轴压比对带施工缝框架延性影响的试验研究[J].工业建筑,2016,46(5):128-130,170.
YAN Xikang,CHEN Yusu,CHANG Luping,et al.Experimental study on the effect of axial compression ratio on the ductility of frame with construction joint[J].Industrial Construction,2016,46(5):128-130,170.
[12]阎西康,侯小磊,陈 培,等.基于ABAQUS的带施工缝钢筋混凝土框架抗震性能研究[J].施工技术,2014,43(4):12-16.
YAN Xikang,HOU Xiaolei,CHEN Pei,et al.Study on seismic behavior of reinforced concrete frame with construction joints based on ABAQUS[J].Construction Technology,2014,43(4):12-16.
[13]建筑结构设计荷载规范:GB 50009—2012[S].北京:中国建筑工业出版社,2012.
Load code for the design of building structures:GB 50009—2012[S].Beijing:China Architecture & Building Press,2012.
[14]刘 健.现浇钢筋混凝土框架施工缝有限元分析[D].大连:大连理工大学,2017.
LIU Jian.The finite element analysis on cast in situ reinforced concrete frame structure with construction joints[D].Dalian:Dalian University of Technology,2017.
[15]吴从晓,周 云,赖伟山,等.现浇与预制装配式混凝土框架节点抗震性能试验[J].建筑科学与工程学报,2015,32(3):60-66.
WU Cong-xiao,ZHOU Yun,LAI Weishan,et al.Experiment on seismic performance of cast-in-situ and prefabricated concrete frame structure joints[J].Journal of Architecture and Civil Engineering,2015,32(3):60-66.
[16]HA S S,KIM S H,LEE M S,et al.Performance evaluation of semi precast concrete beam-column connections with U-shaped strands[J].Advances in Structural Engineering,2014,17(11):1585-1600.
[17]EOM T S,PARK H G,HWANG H J,et al.Plastic hinge relocation methods for emulative PC beam-column connections[J].Journal of Structural Engineering,2015,142(2):04015111.
[18]PARK S C,HONG W K,KIM S,et al.Mathematical model of hybrid precast gravity frames for smart construction and engineering[J].Mathematical Problems in Engineering,2014,2014:916951.
[19]吴成龙.模块化预制钢骨混凝土柱-钢梁组合节点抗震性能研究[D].青岛:青岛理工大学,2020.
WU Chenglong.Seismic behavior of modular prefabricated steel-reinforced concrete column-steel beam composite joints[D].Qingdao:Qingdao Technological University,2020.
[20]马丹阳.钢管混凝土加劲混合柱-RC梁连接节点抗震性能研究[D].北京:清华大学,2019.
MA Danyang.Seismic Performance of concrete-encased concrete-filled steel tubular column to RC beam Joint[D].Beijing:Tsinghua University,2019.
[21]建筑抗震试验规程:JGJ/T 101—2015[S].北京:中国建筑工业出版社,2015.
Specification for seismic test of buildings:JGJ/T 101—2015[S].Beijing:China Architecture & Building Press,2015.