[1]赵壮福,朱彦鹏,叶帅华.黄土高填方地基沉降变形规律及影响因素分析[J].建筑科学与工程学报,2023,40(03):161-169.[doi:10.19815/j.jace.2022.01037]
 ZHAO Zhuangfu,ZHU Yanpeng,YE Shuaihua.Analysis on settlement deformation law and influencing factors of loess high fill foundation[J].Journal of Architecture and Civil Engineering,2023,40(03):161-169.[doi:10.19815/j.jace.2022.01037]
点击复制

黄土高填方地基沉降变形规律及影响因素分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
40卷
期数:
2023年03期
页码:
161-169
栏目:
岩土工程
出版日期:
2023-05-20

文章信息/Info

Title:
Analysis on settlement deformation law and influencing factors of loess high fill foundation
文章编号:
1673-2049(2023)03-0161-09
作者:
赵壮福1,2,朱彦鹏1,2,叶帅华1,2
(1. 兰州理工大学 土木工程学院,甘肃 兰州 730050; 2. 兰州理工大学 西部土木工程防灾减灾教育部工程研究中心,甘肃 兰州 730050)
Author(s):
ZHAO Zhuangfu1,2, ZHU Yanpeng1,2, YE Shuaihua1,2
(1. School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, Gansu, China; 2. Western Engineering Research Center of Disaster Mitigation in Civil Engineering of Ministry of Education, Lanzhou University of Technology, Lanzhou 730050, Gansu, China)
关键词:
黄土高填方 变形规律 灵敏度分析法 数值模型 影响因素
Keywords:
loess high fill deformation law sensitivity analysis method numerical model influencing factor
分类号:
TU444
DOI:
10.19815/j.jace.2022.01037
文献标志码:
A
摘要:
为了研究不同侧向约束条件下黄土高填方地基的沉降变形规律及其影响因素,采用有限元软件PLAXIS3D建立了平填型填方地基、贴坡型填方地基以及沟谷型填方地基的数值模型,对高填方地基工后沉降变形规律进行了归纳,并通过灵敏度分析法对黄土高填方地基沉降变形的影响因素进行了敏感性分析; 通过与文献的理论计算结果对比,证明了数值模型的有效性。研究结果表明:不同的侧向约束条件对高填方地基的沉降变形有显著的影响; 侧向约束越强,高填方沉降变形越小,反之亦然,其中平填型填方地基的沉降变形最大,贴坡型填方地基次之,沟谷型填方地基的沉降变形最小,且地形对称分布的沟谷型填方地基变形控制效果优于非对称地形; 随着填土高度和填筑速度的增加,填方地基的工后沉降也会增加; 提高填土的压实度可以显著减小沉降,但改变原位地基处理厚度和沟谷底部宽度对沉降变形的影响相对较小。
Abstract:
In order to study the settlement deformation law and influencing factors of loess high fill foundation under different lateral constraint conditions, numerical models of flat fill foundation, sticking slope fill foundation and gully fill foundation were established using the finite element software PLAXIS3D. The settlement deformation laws of high fill foundation after construction were summarized, and the sensitivity analysis method was used to analyze the influencing factors of settlement deformation of loess high fill foundation. By comparing the theoretical calculation results in the literature, the effectiveness of the numerical model was proved. The study results show that different lateral constraint conditions have a significant impact on the settlement deformation of high fill foundation. The stronger the lateral constraint, the smaller the settlement deformation of the high fill, and vice versa. Among them, the settlement deformation of the flat fill foundation is the largest, followed by the sticking slope fill foundation, and the settlement deformation of the gully fill foundation is the smallest. The deformation control effect of the gully fill foundation with symmetrical terrain distribution is better than that of asymmetric terrain. As the filling height and filling speed increase, the post construction settlement of the fill foundation will also increase. Improving the compactness of the fill can significantly reduce settlement, but changing the thickness of the in-situ foundation treatment and the width of the valley bottom has a relatively small impact on settlement deformation.

参考文献/References:

[1] 杨校辉.山区机场高填方地基变形和稳定性分析[D].兰州:兰州理工大学,2017.
YANG Xiaohui.Analysis of foundation deformation and stability of high fill of airport in mountainous area[D].Lanzhou:Lanzhou University of Technology,2017.
[2]ZHU C H,LI N.Ranking of influence factors and control technologies for the post-construction settlement of loess high-filling embankments[J].Computers and Geotechnics,2020,118:103320.
[3]ZHAO Z F,ZHU Y P,YE S H.Study on settlement deformation of high fill foundation in large thickness loess area[J].Arabian Journal of Geosciences,2021,14(12):1173.
[4]朱才辉.深厚黄土地基上机场高填方沉降规律研究[D].西安:西安理工大学,2012.
ZHU Caihui.Settlement regularity study of loess-high filled airport foundation with large thickness[D].Xi'an:Xi'an University of Technology,2012.
[5]苏立海.深厚黄土高填方工后变形机理与沉降规律研究[D].西安:西安理工大学,2016.
SU Lihai.Research of post-construction deformation mechanism and settlement of high loess embankment[D].Xi'an:Xi'an University of Technology,2016.
[6]徐 明,宋二祥.高填方长期工后沉降研究的综述[J].清华大学学报(自然科学版),2009,49(6):786-789.
XU Ming,SONG Erxiang.Review of long-term settling of high fills[J].Journal of Tsinghua University(Science and Technology),2009,49(6):786-789.
[7]刘萌成,黄晓明,陶向华.桥台后高填方路堤工后沉降影响因素分析[J].交通运输工程学报,2005,5(3):36-40,59.
LIU Mengcheng,HUANG Xiaoming,TAO Xianghua.Influence factors on post-construction settlement of high backfills adjacent to abutment[J].Journal of Traffic and Transportation Engineering,2005,5(3):36-40,59.
[8]崔晓如.高填方路基沉降变形分析与预测及其控制标准研究[D].长沙:长沙理工大学,2010.
CUI Xiaoru.Study on settlement of high embankment on analysis and forecast and settlement control standards[D].Changsha:Changsha University of Science & Technology,2010.
[9]郭增玉,张朝鹏,夏旺民.高湿度Q2黄土的非线性流变本构模型及参数[J].岩石力学与工程学报,2000,19(6):780-784.
GUO Zengyu,ZHANG Chaopeng,XIA Wangmin.Nonlinear rheological constitutive models and their parameters of high moisture Q2 loess[J].Chinese Journal of Rock Mechanics and Engineering,2000,19(6):780-784.
[10]朱才辉,李 宁,刘俊平.压实Q3马兰黄土蠕变规律研究[J].西安理工大学学报,2011,27(4):392-399.
ZHU Caihui,LI Ning,LIU Junping.Research on the creep behavior of compacted Q3 Ma-Lan loess[J].Journal of Xi'an University of Technology,2011,27(4):392-399.
[11]葛苗苗,李 宁,郑建国,等.基于蠕变试验的黄土高填方工后沉降规律数值研究[J].西安理工大学学报,2015,31(3):295-300,305.
GE Miaomiao,LI Ning,ZHENG Jianguo,et al.Numerical analysis of the post-construction settlement regularity of loess-high filled embankment based on creep test[J].Journal of Xi'an University of Technology,2015,31(3):295-300,305.
[12]葛苗苗,李 宁,郑建国,等.考虑黄土时效变形特性的高填方工后沉降预测[J].土木工程学报,2015,48(增2):262-267.
GE Miaomiao,LI Ning,ZHENG Jianguo,et al.Prediction of the post-construction settlement of high filled embankment with considering the time depending deformation of compacted loess[J].China Civil Engineering Journal,2015,48(S2):262-267.
[13]YAO Y P,HUANG J,WANG N D.et al.Prediction method of creep settlement considering abrupt factors[J].Transportation Geotechnics,2020,22:100304.
[14]刘 宏,李攀峰,张倬元.九寨黄龙机场高填方地基工后沉降预测[J].岩土工程学报,2005,27(1):90-93.
LIU Hong,LI Panfeng,ZHANG Zhuoyuan.Prediction of the post-construction settlement of the high embankment of Jiuzhai-Huanglong airport[J].Chinese Journal of Geotechnical Engineering,2005,27(1):90-93.
[15]王丽琴,靳宝成,杨有海.黄土路堤工后沉降预测新模型与方法[J].岩石力学与工程学报,2007,26(11):2370-2376.
WANG Liqin,JIN Baocheng,YANG Youhai.New model and method for forecasting post-construction settlement of loess-fill embankments[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2370-2376.
[16]ZHU C H,ZHOU X S,WANG S H.Foundation treatment assessment and postconstruction settlement prediction of a loess high fill embankment:a case study[J].Shock and Vibration,2020,2020:8864690.
[17]INDRARATNA B,BALASUBRAMANIAM A S,SIVANESWARAN N.Analysis of settlement and lateral deformation of soft clay foundation behavior two full-scale embankments[J].International Journal for Numerical and Methods in Geomechanics,1997,21(9):599-618.
[18]李秀珍,许 强,孔纪名,等.九寨黄龙机场高填方地基沉降的数值模拟分析[J].岩石力学与工程学报,2005,24(12):2188-2193.
LI Xiuzhen,XU Qiang,KONG Jiming.et al.Numerical modeling analysis of settlements of high fill foundation for Jiuzhai-Huanglong airport[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(12):2188-2193.
[19]许 强,黄润秋,张倬元,等.四川九寨黄龙机场高填方变形及稳定性的FLAC3D分析[J].成都理工学院学报,2001,28(增1):333-338.
XU Qiang,HUANG Runqiu,ZHANG Zhuoyuan,et al.Study on deformation and stability of high fill at Jiuzhai-Huanglong airport by FLAC3D modeling[J].Journal of Chengdu University of Technology,2001,28(S1):333-338.
[20]周远强,吴 宏,朱才辉,等.黄土高填方工后沉降影响因素敏感性分析[J].西安理工大学学报,2018,34(1):92-98.
ZHOU Yuanqiang,WU Hong,ZHU Caihui,et al.Sensitivity analysis of influence factors of post-construction settlement on loess high fill embankment[J].Journal of Xi'an University of Technology,2018,34(1):92-98.
[21]顾慰慈.堆石坝的沉降和位移计算[J].水利水电技术,1983(1):24-30.
GU Weici.Settlement and displacement calculation of rockfill dam[J].Water Resources and Hydropower Engineering,1983(1):24-30.

相似文献/References:

[1]朱彦鹏,何江飞,李军.黄土公路隧道浅埋段管棚注浆支护机理及监测分析[J].建筑科学与工程学报,2011,28(01):11.
 ZHU Yan-peng,HE Jiang-fei,LI Jun.Support Mechanism and Monitoring Analysis of Pipe Roof Grouting for Loess Highway Tunnel in Shallow-buried Section[J].Journal of Architecture and Civil Engineering,2011,28(03):11.
[2]张 海,蔡玉军.斜交异形箱涵整体结构受力性能及变形规律[J].建筑科学与工程学报,2020,37(02):91.[doi:10.19815/j.jace.2019.07061]
 ZHANG Hai,CAI Yu-Jun.Mechanical Property and Deformation Law of Integral Structure of Oblique Special-shaped Box Culvert[J].Journal of Architecture and Civil Engineering,2020,37(03):91.[doi:10.19815/j.jace.2019.07061]
[3]陶 勇,吕所章,杨 平,等.南京江北新区相邻深浅基坑开挖时序优化研究[J].建筑科学与工程学报,2021,38(06):108.[doi:10.19815/j.jace.2021.09021]
 TAO Yong,LYU Suo-zhang,YANG Ping,et al.Study on Excavation Time Sequence Optimization of Adjacent Deep and Shallow Foundation Pits in Jiangbei New District of Nanjing[J].Journal of Architecture and Civil Engineering,2021,38(03):108.[doi:10.19815/j.jace.2021.09021]
[4]李吉林,尹爱月,魏焕卫,等.开挖宽度对异形基坑L形转角区支护结构变形影响研究[J].建筑科学与工程学报,2024,41(04):159.[doi:10.19815/j.jace.2022.05017]
 LI Jilin,YIN Aiyue,WEI Huanwei,et al.Study on influence of excavation width on deformation of supporting structure in L-shaped corner area of shaped foundation pit[J].Journal of Architecture and Civil Engineering,2024,41(03):159.[doi:10.19815/j.jace.2022.05017]

备注/Memo

备注/Memo:
收稿日期:2022-01-11
基金项目:教育部长江学者创新团队支持计划项目(IRT_17R51); 优秀研究生“创新之星”项目(2021CXZX-484)
作者简介:赵壮福(1994-),男,工学博士研究生,E-mail:zzfu05@163.com。
通信作者:朱彦鹏(1960-),男,教授,博士生导师,E-mail:zhuyp1960@163.com。
更新日期/Last Update: 2023-05-20