|本期目录/Table of Contents|

[1]邰扣霞,丁大钧.中国桥梁建设新飞跃[J].建筑科学与工程学报,2006,23(02):30-40.
 TAI Kou-xia,DING Da-jun.New Leaps in Construction of Bridges in China[J].Journal of Architecture and Civil Engineering,2006,23(02):30-40.
点击复制

中国桥梁建设新飞跃(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
23卷
期数:
2006年02期
页码:
30-40
栏目:
出版日期:
2006-06-20

文章信息/Info

Title:
New Leaps in Construction of Bridges in China
作者:
邰扣霞;丁大钧;
东南大学 土木工程学院,江苏 南京 210096
Author(s):
TAI Kou-xia, DING Da-jun
School of Civil Engineering, Southeast University, Nanjing 210096, Jiangsu, China
关键词:
刚构桥 拱桥 公路-铁路两用桥 斜拉桥 悬索桥 跨海大桥 隧道
Keywords:
rigid frame bridge arch bridge bi-purposed bridge for highway and railway cable-stayed bridge suspension bridge bridge over sea tunnel
分类号:
U491.226
DOI:
-
文献标志码:
A
摘要:
20世纪90年代,中国桥梁建设开始突飞猛进发展,已陆续建成一系列各类大桥,并创造了一个又一个新的世界纪录。详细介绍了刚构桥、钢管混凝土拱桥、武汉天兴洲特大公路-铁路两用斜拉桥、世界第二长悬索桥和世界第一长东海跨海大桥。简要介绍了南京过江十通道中已在建设的第四通道——纬七路过江隧道、已在准备建设的第九通道——长江四桥和已启动的连接浦东与崇明岛的世界最大的桥梁隧道结合工程。
Abstract:
In China since the 1990s, the construction of bridges has been going ahead by leaps and bounds; a lot of great bridges with various types have been completed in succession. When looking back, the authors discovered that some records in China were renewed with the construction. Research content includes: rigid frame bridge, arch bridge constructed of concrete-filled steel tube, extra-large Wuhan Tianxingzhou bi-purposed cable-stayed bridge for highway and railway, the 2nd worldwide suspension longest bridge, 10 Nanjing passages through Yangtze River, among which, Nanjing Yangtze River Bridge and The 2nd Nanjing Yangtze River Bridge have been completed and opened in earlier time, and The 3rd Nanjing Yangtze River Bridge has also been completed and opened recently. Now, the 4th passage through Yangtze River-the Tunnel Linking Wei 7th Road has been under construction and the 9th passage-The 4th Nanjing Yangtze River Bridge has also been prepared to construct; the 1st longest bridge over sea in the world-Donghai Bridge over sea and the largest bridge-tunnel combination engineering of Pudong to Chongming Island has also been started.

参考文献/References:

[1] 李国豪,项海帆.中国桥梁[M].上海:同济大学出版社,1993. LI Guo-hao,XIANG Hai-fan.Bridges in China[M].Shanghai:Tongji University Press,1993.
[2]DING Da-jun.New Development of Concrete-Filled Tubular Arch Bridges in China[J].Travaux,2001,36(12):91-94.
[3]张佐安.巫山长江大桥缆索吊装系统承重主索的选用[C]//中国公路学会桥梁和结构工程学会.2004年全国桥梁学术会议论文集.北京:人民交通出版社,2004:518-523. ZHANG Zuo-an.Selection of Bearing Cables in the Hoisting System with Cables of Wushan Yangtze RiverBridge[C]//Bridge & Structural Engineering Branch of Highway and Transportation Society of China.Proceedings of National Symposium of Bridges in 2004.Beijing:China Communications Press,2004:518-523.
[4]张佐安.巫山长江大桥拱肋钢管内混凝土施工技术[C]//中国公路学会桥梁和结构工程学会.2004年全国桥梁学术会议论文集.北京:人民交通出版社,2004:523-528. ZHANG Zuo-an.Construction Technique of Concrete in Steel Tubes of Arch Ribs of Wushan Yangtze River Bridge[C]//Bridge & Structural Engineering Branch of Highway and Transportation Society of China.Proceedings of National Symposium of Bridges in 2004.Beijing:China Communications Press,2004:523-528.
[5]丁大钧,蒋永生.土木工程概论[M].北京:中国建筑工业出版社,2003:410. DING Da-jun,JIANG Yong-sheng.General Introduction of Civil Engineering[M].Beijing:China Architecture & Building Press,2003:410.
[6]丁大钧.中国拱桥和索桥建设的新进展[J].土木水利学会会刊,2004,31(4):56-67. DING Da-jun.New Advances in the Construction of Arch and Cable Bridges in China[J].Periodical of Civil & Hydraulic Engineering Society,2004,31(4):56-67.
[7]丁大钧.中国绍兴现存古石桥建筑[J].建筑科学与工程学报,2005,22(1):6-15. DING Da-jun.Construction of Existing Antique Stone Bridges in Shaoxing,China[J].Journal of Architecture and Civil Engineering,2005,22(1):6-15.
[8]武汉天兴洲道桥投资开发有限公司.武汉天兴洲公铁两用长江大桥简介[R].武汉:中铁大桥局,2004. Investment & Development Ltd of Wuhan Tianxingzhou Road & Bridge.Simple Introduction of Bi-purposed Wuhan Tianxingzhou Yangtze River Bridge[R].Wuhan:China Zhongtie Major Bridge Group,2004.
[9]高宗余.东海大桥主航道桥斜拉桥总体设计[J].世界桥梁,2004,32(增1):6-16. GAO Zong-yu.Overall Design of Cable-Stayed Bridge in the Main Navigable Pass of Donghai Bridge over Sea[J].Bridges in the World,2004,32(S1):6-16.

相似文献/References:

[1]黄卿维,余印根,韦建刚,等.钢管混凝土拱桥技术状况检测与评定[J].建筑科学与工程学报,2011,28(03):34.
 HUANG Qing-wei,YU Yin-gen,WEI Jian-gang,et al.Technical Detection and Assessment of Concrete-filled Steel Tubular Arch Bridge[J].Journal of Architecture and Civil Engineering,2011,28(02):34.
[2]常军,张启伟,孙利民.基于随机子空间结合稳定图的拱桥模态参数识别方法[J].建筑科学与工程学报,2007,24(01):21.
 CHANG Jun,ZHANG Qi-wei,SUN Li-min.Identified Method of Arch Bridge Modal Parameters Based on Stochastic Subspace Combined with Stabilization Diagram[J].Journal of Architecture and Civil Engineering,2007,24(02):21.

备注/Memo

备注/Memo:
收稿日期:2005-12-15
作者简介:邰扣霞(1966-),女,江苏南京人,工程师,E-mail:kx-tai@seu.edu.cn。
更新日期/Last Update: 2006-06-20