[1] 许 曦,周胜利,戴秋云.大跨径悬索桥主缆线形测量[J].施工技术,2002,31(9):21-23.
XU Xi,ZHOU Sheng-li,DAI Qiu-yun.Line Shape Measurement for Main Cable of Large Span Suspension Cable Bridge[J].Construction Technology,2002,31(9):21-23.
[2]牛和恩.虎门大桥工程[M].北京:人民交通出版社,1998:282-291.
NIU He-en.Construction of Humen Bridge[M].Bei- jing:China Communications Press,1998:282-291.
[3]吴胜东,黄 卫,钟建驰,等.润扬长江公路大桥建设:悬索桥[M].北京:人民交通出版社,2006:546-553.
WU Sheng-dong,HUANG Wei,ZHONG Jian-chi,et al.Construction of Runyang Yangtze River Highway Bridge:Suspension Bridge[M].Beijing:China Communications Press,2006:546-553.
[4]LEONARD J W.Tension Structures[M].New York:McGraw-Hill,1988:17-70.
[5]沈锐利.悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9.
SHEN Rui-li.Calculation Methods for Design and Erection of Cable Curve of Suspension Bridge[J].China Civil Engineering Journal,1996,29(2):3-9.
[6]唐茂林,强士中,沈锐利.悬索桥成桥主缆线形计算的分段悬链线法[J].铁道学报,2003,25(1):87-91.
TANG Mao-lin,QIANG Shi-zhong,SHEN Rui-li.Segmental Catenary Method of Calculating the Cable Curve of Suspension Bridge[J].Journal of the China Railway Society,2003,25(1):87-91.
[7]沈世钊.悬索结构设计[M].北京:中国建筑工业出版社,1997.
SHEN Shi-zhao.Design of Cable Structures[M].Beijing:China Architecture & Building Press,1997.
[8]唐茂林.大跨度悬索桥空间几何非线性分析与软件开发[D].成都:西南交通大学,2003.
TANG Mao-lin.3D Geometric Nonlinear Analysis of Long-span Suspension Bridge and Its Software Development[D].Chengdu:Southwest Jiaotong University,2003.
[9]唐茂林,沈锐利,强士中.大跨度悬索桥丝股架设线形计算的精确方法[J].西南交通大学学报,2001,36(3):303-307.
TANG Mao-lin,SHEN Rui-li,QIANG Shi-zhong.An Accurate Calculation Method for Erecting Curves of Wire Strands of Long Suspension Bridges[J].Journal of Southwest Jiaotong University,2001,36(3):303-307.
[10]叶志龙.悬索桥主缆架设误差影响分析及参数控制[D].成都:西南交通大学,2008.
YE Zhi-long.The Effect Analysis of Errors and Par-ameters Control for Main Cable Erection of Suspension Bridge[D].Chengdu:Southwest Jiaotong University,2008.
[1]柴生波,王秀兰,任 翔.双缆多跨悬索桥力学性能及主缆用钢量研究[J].建筑科学与工程学报,2015,32(06):74.
CHAI Sheng-bo,WANG Xiu-lan,REN Xiang.Study on Mechanical Properties and Steel Consumption of Double-cable Multi-span Suspension Bridge[J].Journal of Architecture and Civil Engineering,2015,32(03):74.
[2]唐茂林,宋晖,林恰,等.矢跨比对悬索桥受力的影响分析[J].建筑科学与工程学报,2010,27(03):24.
TANG Mao-lin,SONG Hui,LIN Qia,et al.Influence Analysis of Rise-span Ratio on Force of Suspension Bridge[J].Journal of Architecture and Civil Engineering,2010,27(03):24.
[3]严小宇,沈锐利,唐茂林,等.基于可靠度理论的悬索桥主缆线形控制参数研究[J].建筑科学与工程学报,2010,27(03):47.
YAN Xiao-yu,SHEN Rui-li,TANG Mao-lin,et al.Research on Control Parameter of Main Cable Shape of
Suspension Bridge Based on Reliability Theory[J].Journal of Architecture and Civil Engineering,2010,27(03):47.
[4]俞明德,沈锐利,唐茂林,等.西堠门大桥主缆横断面温度场研究[J].建筑科学与工程学报,2010,27(03):53.
YU Ming-de,SHEN Rui-li,TANG Mao-lin,et al.Research on Temperature Field of Main Cable
Section of Xihoumen Bridge[J].Journal of Architecture and Civil Engineering,2010,27(03):53.
[5]聂利芳,沈锐利,唐茂林,等.悬索桥主缆抗弯刚度引起的二次应力分析[J].建筑科学与工程学报,2010,27(03):59.
NIE Li-fang,SHEN Rui-li,TANG Mao-lin,et al.Secondary Stress Analysis of Main Cable of Suspension
Bridge Considering Bending Rigidity[J].Journal of Architecture and Civil Engineering,2010,27(03):59.
[6]逄焕平,王建国.悬索桥主缆成桥线形的计算方法[J].建筑科学与工程学报,2009,26(04):44.
PANG Huan-ping,WANG Jian-guo.Calculation Method for Target Configuration of Main
Cable of Suspension Bridge[J].Journal of Architecture and Civil Engineering,2009,26(03):44.
[7]沈锐利,何 恺,黄 振.悬索桥索夹部位主缆钢丝之间非线性关系的分析模型[J].建筑科学与工程学报,2018,35(01):111.
SHEN Rui-li,HE Kai,HUANG Zhen.Analysis Model of Nonlinear Relationship of Main Cable Steel Wires in Cable Clip of Suspension Bridge[J].Journal of Architecture and Civil Engineering,2018,35(03):111.
[8]黄 勇,车泽鑫,谢光明.悬索桥易损性分析与简化模型[J].建筑科学与工程学报,2018,35(05):93.
HUANG Yong,CHE Ze-xin,XIE Guang-ming.Suspension Bridge Vulnerability Analysis and Simplified Model[J].Journal of Architecture and Civil Engineering,2018,35(03):93.