|本期目录/Table of Contents|

[1]谭立新,郭朋鑫,何昌,等.大跨梁网预应力分区张拉的影响分析[J].建筑科学与工程学报,2017,34(05):68-75.
 TAN Li-xin,GUO Peng-xin,HE Chang-jie,et al.Effect Analysis of Prestressing Subarea Tension of Large-span Beam[J].Journal of Architecture and Civil Engineering,2017,34(05):68-75.
点击复制

大跨梁网预应力分区张拉的影响分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
34卷
期数:
2017年05期
页码:
68-75
栏目:
出版日期:
2017-09-22

文章信息/Info

Title:
Effect Analysis of Prestressing Subarea Tension of Large-span Beam
作者:
谭立新郭朋鑫何昌张耀康
中国建筑第五工程局有限公司
Author(s):
TAN Li-xin, GUO Peng-xin,HE Chang-jie,ZHANG Yao-kang
China Construction Fifth Engineering Division Corp., Ltd
关键词:
大跨梁网预应力分析模型分区张拉一次成形张拉技术措施
Keywords:
large-span beam net prestressing analysis model subarea tension once-tension forming technical measure
分类号:
-
DOI:
-
文献标志码:
A
摘要:
针对长沙百米深矿坑冰雪世界工程中部3×104 m2预应力平台,为了比较分区施工与设计一次成形的差异,基于有限元软件MIDAS/Gen,对其施工全过程进行有限元模拟。在自重荷载作用下,对比了分区施工与一次成形梁的弯矩图;在自重荷载与预应力荷载的共同作用下,对比了梁的弯矩图和梁底、梁顶的应力云图,从工程施工角度提出了分区施工的技术措施。结果表明:梁跨中与支座的总弯矩是相等的,由此说明分区施工模拟分析是可行的;分区张拉施工取得的效果与设计一次成形预应力张拉的效果基本吻合。
Abstract:
Aiming at the construction of 3×104 m2 prestressed platform of central part of Ice and Snow World project at the 100 m deep pit in Changsha, in order to compare the differences between subarea construction and onetime construction, based on the finite element software MIDAS/Gen, the finite element simulation of whole construction process was carried out. Under the action of self weight load, the bending moment diagrams of the subarea construction and the oncetension forming beam were contrasted. Under the combined action of self weight load and prestress load, the moment diagrams of the beam and the stress nephograms of the bottom and top of the beam were contrasted. The technical measures of subarea construction were put forward from the angle of engineering construction. The results show that the total bending moment of beam midspan is equal to that of the support, so the simulation analysis of subarea construction is feasible. The effect of subarea tension construction is basically consistent with the effect of oncetension forming.

参考文献/References:

相似文献/References:

[1]张 岗,刘天龙,施 颖,等.火灾条件下混凝土箱梁梁端预应力衰变规律[J].建筑科学与工程学报,2016,33(03):65.
 ZHANG Gang,LIU Tian-long,SHI Ying,et al.Decay Law of Prestress at Concrete Box Girder End Under Fire Condition[J].Journal of Architecture and Civil Engineering,2016,33(05):65.
[2]洪 雷,马腾龙,王苏岩.湿热环境下预应力CFRP加固高强混凝土的耐久性[J].建筑科学与工程学报,2017,34(01):25.
 HONG Lei,MA Teng-long,WANG Su-yan.Durability of High Strength Concrete Strengthened with Prestressed CFRP Under Wet-thermal Environments[J].Journal of Architecture and Civil Engineering,2017,34(05):25.
[3]苏 毅,孙达庆,宗生京,等.交叉预应力竹木框架抗侧力性能研究[J].建筑科学与工程学报,2017,34(03):56.
 SU Yi,SUN Da-qing,ZONG Sheng-jing,et al.Study on Anti-lateral Performance of Cross Prestressed Bamboo Frame[J].Journal of Architecture and Civil Engineering,2017,34(05):56.
[4]周绪红,张微伟,吴方伯,等.预应力混凝土四边简支双向叠合板的设计方法[J].建筑科学与工程学报,2006,23(04):54.
 ZHOU Xu-hong,ZHANG Wei-wei,WU Fang-bo,et al.Design Method of Prestressed Concrete Simply Supported on Four Sides of Two-Way Composite Slab[J].Journal of Architecture and Civil Engineering,2006,23(05):54.
[5]洪 雷,太永伟.预应力CFRP加固高强混凝土梁试验[J].建筑科学与工程学报,2018,35(06):66.
 Experiment of Prestressed CFRP Reinforced High Strength Concrete Beams.[J].Journal of Architecture and Civil Engineering,2018,35(05):66.

备注/Memo

备注/Memo:
更新日期/Last Update: 2017-09-11