|本期目录/Table of Contents|

[1]张富宾,肖建庄,丁红梅,等.装配式混凝土结构防水技术现状及发展趋势[J].建筑科学与工程学报,2022,39(01):1-13.[doi:10.19815/j.jace.2021.05001]
 ZHANG Fu-bin,XIAO Jian-zhuang,DING Hong-mei,et al.Current Status and Development Trend of Prefabricated Structure Waterproof Technology[J].Journal of Architecture and Civil Engineering,2022,39(01):1-13.[doi:10.19815/j.jace.2021.05001]
点击复制

装配式混凝土结构防水技术现状及发展趋势(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
39卷
期数:
2022年01期
页码:
1-13
栏目:
装配式结构
出版日期:
2022-02-15

文章信息/Info

Title:
Current Status and Development Trend of Prefabricated Structure Waterproof Technology
文章编号:
1673-2049(2022)01-0001-13
作者:
张富宾1,2,3,肖建庄2,丁红梅1,肖绪文2
(1. 北京东方雨虹防水技术股份有限公司 特种功能防水材料国家重点实验室,北京 100123; 2. 同济大学 土木工程学院,上海 200092; 3. 江苏大学 土木工程与力学学院,江苏 镇江 212013)
Author(s):
ZHANG Fu-bin1,2,3, XIAO Jian-zhuang2, DING Hong-mei1, XIAO Xu-wen2
(1. State Key Laboratory of Special Functional Waterproof Materials, Beijing Oriental Yuhong Waterproof Technology Co., Ltd., Beijing 100123, China; 2. College of Civil Engineering, Tongji University, Shanghai 200092, China; 3. Faculty of Civil Engineering and Mechanics, Zhenjiang 212013, Jiangsu, China)
关键词:
装配式结构 防水材料 防水设计 防水施工 防水体系
Keywords:
prefabricated structure waterproof material waterproof design waterproof construction waterproof system
分类号:
TU375
DOI:
10.19815/j.jace.2021.05001
文献标志码:
A
摘要:
通过文献调研回顾了装配式混凝土结构的发展现状,总结了装配式混凝土结构常见渗漏部位及其主要渗漏原因,提出了装配式混凝土结构防水体系构成,阐述了装配式混凝土结构防水材料、设计与施工技术现状和发展趋势,指出了其防水存在的瓶颈问题,探讨了基于受力和抗渗防水共同要求的装配式混凝土结构设计方法与趋势。结果表明:装配式混凝土结构防水体系可分为主体结构防水和拼接缝防水两部分,防水材料分为不定型和定型2类,不定型防水材料以密封胶为代表,定型防水材料以密封垫为代表,目前国内外学者对密封材料的力学性能研究较多,对密封材料及配套材料耐久性和长期老化性能方面的研究较少; 防水设计方面,需要进一步考虑地震作用、风荷载、地基不均匀沉降等作用对装配式混凝土结构防水设计的影响; 防水施工方面,装配式混凝土结构拼接缝防水的现场验收检查技术手段落后,亟需推广快速、准确、高效的无损检测方法; 缺少隐蔽工程密封材料的维护及快速更换技术等方面的研究。
Abstract:
According to literature research, the development status of prefabricated concrete structure was reviewed, the common leakage parts and main leakage reasons of prefabricated concrete structure were summarized, the composition of waterproof system of prefabricated concrete structure were put forward, the current situation and development trend of waterproof materials, design and construction technology of prefabricated concrete structure were expounded, the bottleneck problems of waterproof were pointed out, and the design method and trend of prefabricated concrete structure based on the common requirements of stress and impermeability were discussed. The results show that the waterproof system of prefabricated concrete structure can be divided into the main structure waterproof and the splicing joint waterproof. The waterproof materials can be divided into non fixed type and fixed type. The non fixed type waterproof material is represented by sealant, and the fixed type waterproof material is represented by gasket. There are many researches on mechanical properties of sealing materials, while few researches on the durability and long-term aging performance of sealing materials and supporting materials. In the aspect of waterproof design, the influence of earthquake, wind load and uneven foundation settlement on the waterproof design of prefabricated concrete structure should be further considered. In terms of waterproof construction, the on-site acceptance inspection technology of prefabricated concrete structure joint waterproof is backward, and it is urgent to promote rapid, accurate and efficient nondestructive testing methods. There is a lack of research on the maintenance and rapid replacement technology of sealing materials for concealed works.

参考文献/References:

[1] 王 俊,赵基达,胡宗羽.我国建筑工业化发展现状与思考[J].土木工程学报,2016,49(5):1-8.
WANG Jun,ZHAO Ji-da,HU Zong-yu.Review and Thinking on Development of Building Industrialization in China[J].China Civil Engineering Journal,2016,49(5):1-8.
[2]林海侠,毕鑫磊,王 新.工业化装配式屋面系统在雄安设计中心的应用[J].中国建筑防水,2019(3):13-16.
LIN Hai-xia,BI Xin-lei,WANG Xin.Application of Industrial Fabricated Roof System in Xiong'an Design Center[J].China Building Waterproofing,2019(3):13-16.
[3]国务院办公厅.国务院办公厅印发 《关于大力发展装配式建筑的指导意见》[EB/OL].(2016-09-30)[2021-04-20].http://www.xinhuanet.com/politics/2016-09/30/c_1119656301.htm.
General Office of the State Council.Issued by the General Office of the State Council Guiding Opinions on Vigorously Developing Prefabricated Buildings[EB/OL].(2016-09-30)[2021-04-20].http://www.xinhuanet.com/politics/2016-09/30/c_1119656301.htm.
[4]住建部.2020年全国新开工装配式建筑面积达6.3亿平方米,较2019年增长50%[EB/OL].(2021-03-14)[2021-04-20].https://finance.people.com/nl/2010/0314/c1004-32050935.html.
Ministry of Housing and Urban Rural Development.In 2020,the Newly Started Assembly Building Area in China Will Reach 630 Million Square Meters,an Increase of 50% Compared with 2019[EB/OL].(2021-03-14)[2021-04-20].https://finance.people.com/nl/2010/0314/c1004-32050935.html.
[5]装配式混凝土结构技术规程:JGJ 1—2014[S].北京:中国建筑工业出版社,2014.
Technical Specification for Precast Concrete Structures:JGJ 1—2014[S].Beijing:China Architecture & Building Press,2014.
[6]城市综合管廊工程技术规范:GB 50838—2015[S].北京:中国计划出版社,2015.
Technical Code for Urban Utility Tunnel Engineering:GB 50838—2015[S].Beijing:China Planning Press,2015.
[7]邹家丽,郑焕奇.信息管理系统在建筑预制构件生产中的应用[J].广东土木与建筑,2019,26(11):70-73.
ZOU Jia-li,ZHENG Huan-qi.Application of Information Management System in Prefabricated Component Production of Buildings[J].Guangdong Architecture Civil Engineering,2019,26(11):70-73.
[8]刘 盈.装配式建筑外墙防水构造型式介绍及设计控制要点[J].粘接,2019,40(7):99-101.
LIU Ying.Introduction of Waterproof Structure Type and Key Points of Design Control for Outer Wall of Prefabricated Building[J].Adhension,2019,40(7):99-101.
[9]寇俊敏,苍雁飞,岳志芳,等.预制装配式建筑外墙防水技术应用研究[J].新型建筑材料,2020,47(9):59-62.
KOU Jun-min,CANG Yan-fei,YUE Zhi-fang,et al.Research on the Application of Prefabricated Building Exterior Wall Waterproof Technology[J].New Building Materials,2020,47(9):59-62.
[10]史 娥.在役公路隧道堵漏材料试验及渗漏水治理技术研究[D].西安:长安大学,2018.
SHI E.Leakage Test and Leaking Water in the Existing Highway Tunnel Research on Management Technology[D].Xi'an:Chang'an University,2018.
[11]匡亚川,宋哲轩,刘胤虎,等.新型装配式双舱综合管廊力学性能试验[J/OL].吉林大学学报(工学版),2021:1-9[2021-07-30].http://doi.org/10.13229/j.cnki.jdxbgxb 20200818.
KUANG Ya-chuan,SONG Zhe-xuan,LIU Yin-hu,et al.Experimental on Mechanical Properties of New Type Assembled Double-cabin Utility Tunnel[J/OL].Journal of Jilin University(Engineering and Technology Edition),2021:1-9[2021-07-30].http://doi.org/10.13229/j.cnki.jdxbgxb 20200818.
[12]秦祎文,杨 桃,郭昊天,等.装配式地铁车站地震响应数值分析[J].石家庄铁道大学学报(自然科学版),2020,33(4):80-87.
QIN Yi-wen,YANG tao,GUO Hao-tian,et al.Numerical Analysis of Seismic Response of Fabricated Subway Station[J].Journal of Shijiazhuang Tiedao University(Natural Science Edition),2020,33(4):80-87.
[13]谢宏明,何 川,封 坤,等.地震作用下盾构隧道环缝单向振动防水性能试验[J].西南交通大学学报,2020,55(4):713-718.
XIE Hong-ming,HE Chuan,FENG Kun,et al.Unidirectional Vibration Waterproof Test of Ring Joint of Shield Tunnel Under the Action of Earthquake[J].Journal of Southwest Jiaotong University,2020,55(4):713-718.
[14]张 勇.装配式混凝土建筑防水技术概述[J].中国建筑防水,2015(13):1-5,14.
ZHANG Yong.Brief Review on Waterproofing Techniques of Precast Concrete Structure[J].China Building Waterproofing,2015(13):1-5,14.
[15]刘 星,肖绪文,徐洪涛,等.我国防水工程发展现状对策与分析[J].施工技术,2021,50(3):5-8.
LIU Xing,XIAO Xu-wen,XU Hong-tao,et al.Development Status and Coutermeasures of Waterproof Engineering in China[J].Construction Technology,2021,50(3):5-8.
[16]曹征富.地下建筑工程渗漏及治理技术综述[J].中国建筑防水,2017(6):26-33.
CAO Zheng-fu.Reviews on Seepage and Treatment of Underground Architectural Engineering Technology[J].China Building Waterproofing,2017(6):26-33.
[17]燕 冰.某装配式外墙渗漏综合分析治理[J].中国建筑防水,2019(12):19-22.
YAN Bing.Comprehensively Analyze and Tackle of Exterior Wall Leakage of a Prefabricated Building[J].China Building Waterproofing,2019(12):19-22.
[18]胡 骏.论刚性防水[J].中国建筑防水,2020(7):1-7,13.
HU Jun.Discussion on Rigid Waterproofing[J].China Building Waterproofing,2020(7):1-7,13.
[19]胡 骏,瞿培华.地下工程防水与结构同寿命的技术路线[J].中国建筑防水,2019(9):1-5,8.
HU Jun,QU Pei-hua.Technical Route of Same Lifetime of Underground Waterproofing and Structure[J].China Building Waterproofing,2019(9):1-5,8.
[20]龚晓南,郭盼盼.隧道及地下工程渗漏水诱发原因与防治对策[J].中国公路学报,2021,34(7):1-30.
GONG Xiao-nan,GUO Pan-pan.Causes and Prevention and Mitigation Methods for Water Leakage in Tunnels and Underground Structures[J].China Journal of Highway and Transport,2021,34(7):1-30.
[21]GONG C J,DING W Q,XIE D W.Parametric Investigation on the Sealant Behavior of Tunnel Segmental Joints Under Water Pressurization[J].Tunnelling and Underground Space Technology,2019,97:103231.
[22]郭 斐.浅析隧道水害的成因及防治措施[J].价值工程,2018,37(34):183-185.
GUO Fei.Analysis on the Causes of Water Disaster in Tunnels and Prevention Measures[J].Value Engineering,2018,37(34):183-185.
[23]董林伟.装配式地铁车站与暗挖区间防水性能试验研究[D].徐州:中国矿业大学,2018.
DONG Lin-wei.Study on Waterproof Performance Test of Fabricated Subway Station and Subsurface Excavation Section[D].Xuzhou:China University of Mining and Technology,2018.
[24]孙海英.地铁防水施工技术研究——以石家庄地铁三号线为例[D].石家庄:石家庄铁道大学,2018.
SUN Hai-ying.The Research of Waterproof Technology About the Subway's Construction — Shijiazhuang Metro in the 3rd Line[D].Shijiazhuang:Shijiazhuang Railway University,2018.
[25]叶琳昌.某广场大型地下室渗漏水原因分析与思考——从工程事故中汲取智慧和力量[J].工程质量,2012,30(12):7-13.
YE Lin-chang.Reason Analysis and Reflection of Water Leakage in a Large Basement — Gain Wisdom and Power from the Engineering Accident[J].Construction Quality,2012,30(12):7-13.
[26]姚亚东,王俊锋,王道春,等.地下室防水工程渗漏原因与防治措施分析[J].工程技术研究,2020,5(19):149-150.
YAO Ya-dong,WANG Jun-feng,WANG Dao-chun,et al.Analysis of Leakage Causes and Prevention Measures of Basement Waterproof Engineering[J].Engineering and Technological Research,2020,5(19):149-150.
[27]董 飞,房 倩,张顶立,等.北京地铁运营隧道病害状态分析[J].土木工程学报,2017,50(6):104-113.
DONG Fei,FANG Qian,ZHANG Ding-li,et al.Analysis on Defects of Operational Metro Tunnels in Beijing[J].China Civil Engineering Journal,2017,50(6):104-113.
[28]刘 洋,陈 晓,陆大晋.装配式预制板结构屋面防水技术探讨[J].中国建筑防水,2016(11):22-24.
LIU Yang,CHEN Xiao,LU Da-jin.Discussion on Waterproofing Technology of Fabricated Precast Slab Roof[J].China Building Waterproofing,2016(11):22-24.
[29]马亚航.隧道开挖引起的地层变形及其对地下管线的影响分析[D].长沙:湖南大学,2011.
MA Ya-hang.Effects of Tunneling on Ground Movements and Underground[D].Changsha:Hunan University,2011.
[30]徐玉滢.地下装配式地铁车站综合防水技术研究[D].济南:山东科技大学,2019.
XU Yu-ying.Research on Comprehensive Waterproofing Technology of Underground Prefabricated Metro Station[D].Jinan:Shandong University of Science and Technology,2019.
[31]刘 盈,郑 苗,王 霓.施工工艺对装配式建筑防水密封质量的影响研究[J].施工技术,2020,49(增):1012-1016.
LIU Ying,ZHENG Miao,WANG Ni.Research on the Influence of Construction Technology on Quality of Waterproof Sealing for Prefabricated Building[J].Construction Technology,2020,49(S):1012-1016.
[32]李长太.装配式混凝土建筑预制外墙接缝防水技术研究[J].中国建筑防水,2018(16):25-27.
LI Chang-tai.Study on Waterproofing Technology for Pre-fabricated Concrete Building External Wall Joints[J].China Building Waterproofing,2018(16):25-27.
[33]胡 骏.防水工程设计与选材的一些基本原则[J].中国建筑防水,2014(22):15-22.
HU Jun.Some Basic Principles for Design and Material Selection of Waterproofing Project[J].China Building Waterproofing,2014(22):15-22.
[34]国家发改委.发展改革委修订发布《产业结构调整指导目录(2019年本)》[EB/OL].(2019-11-06)[2021-07-30].http://gov.cn/xinwen/2019-11/06/content_5449193.htm.
National Development and Reform Commission.Revised and Released by the Development and Reform Commission's Directory of Guidance on Industrial Structure Adjustment(2019)[EB/OL].(2019-11-06)[2021-07-30].http://gov.cn/xinwen/2019-11/06/content_5449193.htm.
[35]福建省住房和城乡建设厅.关于印发《福建省绿色建材产品推广应用目录(2019年)》的通知[EB/OL].(2019-12-31)[2021-07-30].http://zjt.fujian.gov.cn/xxgk/zfxxgkzl/xxgkml/dfxfgzhgfxwj/jskj_3794/20200107-5175918.htm.
Fujian Housing and Urban-Rural Development Department.Notice on the Issuance of Promotion and Application Catalogue of Green Building Materials in Fujian Province(2019)[EB/OL].(2019-12-31)[2021-07-30].http://zjt.fujian.gov.cn/xxgk/zfxxgkzl/xxgkml/dfxfgzhgfxwj/jskj_3794/20200107-5175918.htm.
[36]徐建月,陈宝贵,段林丽.密封材料在建筑防水工程中的应用[J].新型建筑材料,2011,38(12):39-41.
XU Jian-yue,CHEN Bao-gui,DUAN Lin-li.Application of Sealing Material in Building Waterproofing Engineering[J].New Building Materials,2011,38(12):39-41.
[37]朱志远.建筑密封胶及其新标准[J].中国建筑防水,2010(6):16-19.
ZHU Zhi-yuan.Building Sealant and Its New Standards[J].China Building Waterproofing,2010(6):16-19.
[38]钟 强,张 凯,李文俊.内浇外挂装配式建筑预制外墙接缝防水技术[J].施工技术,2020,49(增):1025-1028.
ZHONG Qiang,ZHANG Kai,LI Wen-jun.Waterproof Technology of Precast Outer Wall Joint of Internal Pouring and External Hanging Prefabricated Building[J].Construction Technology,2020,49(S):1025-1028.
[39]SHI C H,CAO C Y,LEI M F,et al.Time-dependent Performance and Constitutive Model of EPDM Rubber Gasket Used for Tunnel Segment Joints[J].Tunnelling and Underground Space Technology,2015,50:490-498.
[40]LI X,ZHOU S H,DI H G,et al.Evaluation and Experimental Study on the Sealant Behaviour of Double Gaskets for Shield Tunnel Lining[J].Tunnelling and Underground Space Technology,2018,75:81-89.
[41]GONG C J,DING W Q,SOGA K C,et al.Failure Mechanism of Joint Waterproofing in Precast Segmental Tunnel Linings[J].Tunnelling and Underground Space Technology,2018,84:334-352.
[42]张金伟,罗富荣,童丽红,等.地铁矿山法隧道装配式二次衬砌结构设计初步研究[J].隧道建设(中英文),2021,41(5):822-830.
ZHANG Jin-wei,LUO Fu-rong,TONG Li-hong,et al.Study on Prefabricated Lining Structure Design of a Metro Tunnel Constructed by Mining Method[J].Tunnel Construction,2021,41(5):822-830.
[43]PAUL S.Sealability Tests of Gaskets Between Precast Concrete Tunnel Lining Segments[D].Urbana-Champaign:University of Illinois Urbana-Champaign,1978.
[44]张子新,谷冠思,黄 昕,等.盾构隧道管片接头嵌入式密封垫防水性能探究[J].隧道建设(中英文),2019,39(9):1402-1411.
ZHANG Zi-xin,GU Guan-si,HUANG Xin,et al.Experimental Study on Waterproof Performance of Embedded Sealing Gasket of Segment Joint for a Shield Tunnel[J].Tunnel Construction,2019,39(9):1402-1411.
[45]姚润樾.预制拼装综合管廊管片接缝橡胶密封垫的长期性能与截面优化研究[D].广州:华南理工大学,2019.
YAO Run-yue.Research on the Long-term Performance and Sectional Optimization of Rubber Gasket of Utility Tunnel's Lining Joint[D].Guangzhou:South China University of Technology,2019.
[46]杨 霞,仲小亮.预制装配式建筑外墙防水密封现状及存在的问题[J].中国建筑防水,2016(12):16-18.
YANG Xia,ZHONG Xiao-liang.Current Situation and Existing Problems of Waterproofing and Sealing for Prefabricated Building External Walls[J].China Building Waterproofing,2016(12):16-18.
[47]陈孝凯.城市地下预制拼装结构物界面防水设计方法研究[D].哈尔滨:哈尔滨工业大学,2017.
CHEN Xiao-kai.Study on Design Method of Interface Waterproofing for Urban Underground Precast and Assembled Structures[D].Harbin:Harbin Institute of Technology,2017.
[48]赵春刚.全国首个装配式地铁站长春袁家店车站基本完工[J/OL].(2016-06-15)[2021-12-08].https://www.sohu.com/a/83297974_386696.
ZHAO Chun-gang.Changchun Yuanjiadian Station,the First Prefabricated Subway Station in China,Has Been Basically Completed[J/OL].(2016-06-15)[2021-12-08].https://www.sohu.com/a/83297974_386696.
[49]唐 璇,张忠宇,陈喜坤,等.水下盾构隧道结构健康监测系统运营现状及展望[J].现代交通技术,2020,17(4):33-38.
TANG Xuan,ZHANG Zhong-yu,CHEN Xi-kun,et al.Current Status and Prospects of Underwater Shield Tunnel Structural Health Monitoring System[J].Modern Transportation Technology,2020,17(4):33-38.
[50]程姝菲,黄宏伟.盾构隧道长期渗漏水检测新方法[J].地下空间与工程学报,2014,10(3):733-738.
CHENG Shu-fei,HUANG Hong-wei.Monitoring Methods of Long-term Water Seepage in Shield Tunnel[J].Chinese Journal of Underground Space and Engineering,2014,10(3):733-738.
[51]豆海涛,黄宏伟,薛亚东.隧道衬砌渗漏水红外辐射特征影响因素试验研究[J].岩石力学与工程学报,2011,30(12):2426-2434.
DOU Hai-tao,HUANG Hong-wei,XUE Ya-dong.Experimental Study of Factors Affecting Thermal Infrared Radiation Characteristics of Tunnel Lining Water Leakage[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(12):2426-2434.
[52]黄永杰,柳 献,袁 勇,等.盾构隧道渗漏水的自动检测技术[J].上海交通大学学报,2012,46(1):73-78.
HUANG Yong-jie,LIU Xian,YUAN Yong,et al.Auto Inspection Technology for Detecting Leakage in a Shield Tunnel[J].Journal of Shanghai Jiaotong University,2012,46(1):73-78.
[53]吴贤国,刘鹏程,王 雷,等.基于三维激光扫描地铁运营隧道渗漏水监测及预警[J].土木工程与管理学报,2020,37(1):1-7,15.
WU Xian-guo,LIU Peng-cheng,WANG Lei,et al.Monitoring and Warning of Seepage in Subway Operation Tunnel Based on 3D Laser Scanning[J].Journal of Civil Engineering and Management,2020,37(1):1-7,15.
[54]XIONG L J,ZHANG D L,ZHANG Y.Water Leakage Image Recognition of Shield Tunnel via Learning Deep Feature Representation[J].Journal of Visual Communication and Image Representation,2020,71:102708.
[55]GAO C L,ZHOU Z Q,YANG W M.Model Test and Numerical Simulation Research of Water Leakage in Operating Tunnels Passing Through Intersecting Faults[J].Tunnelling and Underground Space Technology,2019,94:103134.
[56]黄宏伟,李庆桐.基于深度学习的盾构隧道渗漏水病害图像识别[J].岩石力学与工程学报,2017,36(12):2861-2871.
HUANG Hong-wei,LI Qing-tong.Image Recognition for Water Leakage in Shield Tunnel Based on Deep Learning[J].Chinese Journal of Rock Mechanics and Engineering,2017,36(12):2861-2871.
[57]XUE Y D,CAI X Y,SHADABFAR M,et al.Deep Learning-based Automatic Recognition of Water Leakage Area in Shield Tunnel Lining[J].Tunnelling and Underground Space Technology,2020,104:103524.
[58]QIAN C,HUANG B,WANG Y,et al.Water Seepage Flow in Concrete[J].Construction and Building Materials,2012,35:491-496.
[59]张稳军,丁 超,张成平,等.不同错台量对复合型密封垫影响及长期防水预测[J].隧道建设(中英文),2020,40(3):337-345.
ZHANG Wen-jun,DING Chao,ZHANG Cheng-ping,et al.Influence of Different Dislocation Amount on Composite Sealing Gasket and Long-term Waterproofing Performance Prediction[J].Tunnel Construction,2020,40(3):337-345.
[60]李 拼,谢宏明,何 川,等.基于有效接触应力的大张开量盾构隧道密封垫防水性能分析[J].隧道建设(中英文),2019,39(12):1993-1999.
LI Pin,XIE Hong-ming,HE Chuan,et al.Waterproof Performance Analysis of Water Sealing Gasket of Large Open Shield Tunnel Based on Effective Contact Stress[J].Tunnel Construction,2019,39(12):1993-1999.
[61]夏鑫磊.地下装配式干式连接墙体设计方法研究[D].哈尔滨:哈尔滨工业大学,2017.
XIA Xin-lei.Study on Design Method of Underground Assembly Dry Connection Wall[D].Harbin:Harbin Institute of Technology,2017.

相似文献/References:

[1]周天华,吴函恒,白亮,等.钢框架-预制混凝土抗侧力墙装配式结构体系[J].建筑科学与工程学报,2013,30(03):1.
 ZHOU Tian-hua,WU Han-heng,BAI Liang,et al.Fabricated Structural System of Steel Frame-prefabricated Concrete Lateral Resistance Wall[J].Journal of Architecture and Civil Engineering,2013,30(01):1.
[2]裴建中,王富玉.桥面防水材料拉伸性能及其评价指标[J].建筑科学与工程学报,2009,26(01):19.
 PEI Jian-zhong,WANG Fu-yu.Tensile Properties and Its Evaluated Indexes of Waterproofing Material for Bridge Decks[J].Journal of Architecture and Civil Engineering,2009,26(01):19.
[3]张 敏,刘艳萍,邱秀丽,等.装配式混凝土U型钢筋环扣连接技术应用研究[J].建筑科学与工程学报,2022,39(01):14.[doi:10.19815/j.jace.2021.04020]
 ZHANG Min,LIU Yan-ping,QIU Xiu-li,et al.Application Research on Prefabricated Concrete U-shaped Reinforcement Buckle Connection Technology[J].Journal of Architecture and Civil Engineering,2022,39(01):14.[doi:10.19815/j.jace.2021.04020]

备注/Memo

备注/Memo:
收稿日期:2021-05-01
基金项目:中国工程院战略咨询项目(2020-XY-16); 中国博士后基金特别资助项目(2021T140031); 中国博士后科学基金项目(2021M690264); 特种功能防水材料国家重点实验室开放课题(SKWL-2021KF10)
作者简介:张富宾(1987-),男,山东东明人,副教授,工学博士,E-mail:zhangfubin@ujs.edu.cn。
通信作者:肖建庄(1968-),男,山东沂南人,教授,博士研究生导师,工学博士,E-mail:jzx@tongji.edu.cn。
更新日期/Last Update: 2021-02-10