[1] Eurocode 1:Actions on Structures. Part 1-7:General Actions — Accidental Actions:EN 1991-1-7:2006[S].Brussels:CEN,2006.
[2]Progressive Collapse Analysis and Design Guidelines for New Federal Office Buildings and Major Modernization Projects:GSA 2016 [S].Washington DC:General Services Administration,2016.
[3]Design of Building to Resist Progressive Collapse:UFC 4-023-03[S].Washington DC:Department of Defense,2016.
[4]建筑结构抗倒塌设计规范:CECS 392:2014[S].北京:中国计划出版社,2014.
Code for Anti-collapse Design of Building Structures:CECS 392:2014[S].Beijing:China Planning Press,2014.
[5]ADAM J M,PARISI F,SAGASETA J,et al.Research and Practice on Progressive Collapse and Robustness of Building Structures in the 21st Century[J].Engineering Structures,2018,173:122-149.
[6]ZHONG W H,TAN Z,TIAN L M,et al.Collapse Resistance of Composite Beam-column Assemblies with Unequal Spans Under an Internal Column-removal Scenario[J].Engineering Structures,2020,206:110143.
[7]MENG B,ZHONG W H,HAO J P.Anti-progressive Collapse Behavior of Beam-to-column Assemblies with Bolted-angle Connections Under Different Span Ratios[J].Advances in Structural Engineering,2018,21(6):891-905.
[8]QIU L,LIN F,WU K C.Improving Progressive Collapse Resistance of RC Beam-column Subassemblages Using External Steel Cables[J].Journal of Performance of Constructed Facilities,2020,34(1):04019079.
[9]王景玄,杨 永,周 侃,等.角柱失效下钢管混凝土柱-组合梁框架抗连续倒塌能力研究[J].工程力学,2022,39(5):105-118.
WANG Jing-xuan,YANG Yong,ZHOU Kan,et al.Research on Progressive Collapse Resistance Capacity of Composite Frame with CFST Columns Under Corner Column Removal Scenario[J].Engineering Mechanics,2022,39(5):105-118.
[10]ZHENG L,WANG W D,XIAN W.Experimental and Numerical Investigation on the Anti-progressive Collapse Performance of Fabricated Connection with CFST Column and Composite Beam[J].Engineering Structures,2022,256:114061.
[11]WANG J X,YANG Y,XIAN W,et al.Progressive Collapse Mechanism Analysis of Concrete-filled Square Steel Tubular Column to Steel Beam Joint with Bolted-welded Hybrid Connection[J].International Journal of Steel Structures,2020,20(5):1618-1635.
[12]高佳明,刘伯权,黄 华,等.带板钢筋混凝土框架连续倒塌理论分析[J].工程力学,2018,35(7):117-126.
GAO Jia-ming,LIU Bo-quan,HUANG Hua,et al.Theoretical Analysis on the Progressive Collapse of RC Frame Structures with Slabs[J].Engineering Mechanics,2018,35(7):117-126.
[13]王俊杰,王 伟,孙 昕.压型钢板组合梁中柱子结构的抗连续倒塌试验[J].工程力学,2017,34(增):149-153,178.
WANG Jun-jie,WANG Wei,SUN Xin.Experimental Behavior of Composite Beam-column Joints with Steel Profiled Decking in a Middle-column-removal Scenario[J].Engineering Mechanics,2017,34(S):149-153,178.
[14]陈安英,完海鹰,孙 磊,等.钢筋桁架组合楼板抗弯性能试验研究[J].建筑结构,2015,45(8):59-63,90.
CHEN An-ying,WAN Hai-ying,SUN Lei,et al.Experimental Study on Bending Behavior of Steel Bar Truss Composite Slab[J].Building Structure,2015,45(8):59-63,90.
[15]邓莎莎.现浇钢筋桁架混凝土楼板试验与理论研究[D].重庆:重庆交通大学,2017.
DENG Sha-sha.Experimental and Theoretical Study on Cast-in-place Steel Bar Truss Concrete Slab[D].Chongqing:Chongqing Jiaotong University,2017.
[16]韩林海.钢管混凝土结构:理论与实践[M].3版.北京:科学出版社,2016.
HAN Lin-hai.Concrete Filled Steel Tubular Structures:Theory and Practice[M].3rd ed.Beijing:Science Press,2016.
[17]ESMAEILY A,XIAO Y.Behavior of Reinforced Concrete Columns Under Variable Axial Loads:Analysis[J].ACI Structural Journal,2005,102(5):736-744.
[18]KIM J,SHIN W S.Retrofit of RC Frames Against Progressive Collapse Using Prestressing Tendons[J].The Structural Design of Tall and Special Buildings,2013,22(4):349-361.