[1] 贡金鑫,魏巍巍,胡家顺.中美欧混凝土结构设计[M].北京:中国建筑工业出版社,2007.
GONG Jin-xin,WEI Wei-wei,HU Jia-shun.Concrete Structure Design in China,US and Europe[M].Beijing:China Architecture & Building Press,2007.
[2]ACI 318-05,Building Code Requirements for Structural Concrete and Commentary[S].
[3]AASHTO2007,LRFD Bridge Design Specifications[S].
[4]EN 1992-1-1:2004,Design of Concrete Structures[S].
[5]CSAA 233-94,Design of Concrete Structures[S].
[6]林 园,贡金鑫,李荣庆.移动荷载下钢筋混凝土深梁基于压杆-拉杆模型的设计[C]//宋玉普,贾金青.全国第十届混凝土基本理论及工程应用学术会议论文集.北京:中国建筑工业出版社,2008:978-984.
LIN Yuan,GONG Jin-xin,LI Rong-qing. Design of Reinforced Concrete Deep Beam Subjected to Movable Loads Based on Strut-and-tie Model[C]//SONG Yu-pu,JIA Jin-qing.Proceedings of the 10th Chinese Conference on Concrete Basic Theory and Its Application.Beijing:China Architecture & Building Press,2008:978-984.
[7]朱劲松,宋玉普.定侧压混凝土双轴拉-压疲劳累积损伤试验研究[J].中国公路学报,2005,18(1):40-45.
ZHU Jin-song,SONG Yu-pu.Experimental Research on Fatigue Cumulative Damage of Concrete Under Cyclic Tension-compression with Constant Confined Stress[J].China Journal of Highway and Transport,2005,18(1):40-45.
[8]楼铁炯,郭乙木,王振林,等.任意截面无粘结预应力混凝土梁的极限非线性分析[J].中国公路学报,2005,18(1):77-80.
LOU Tie-jiong,GUO Yi-mu,WANG Zhen-lin,et al.Nonlinear Analysis of Unbonded Prestressed Beams with Arbitrary Section at Ultimate[J].China Journal of Highway and Transport,2005,18(1):77-80.
[9]郑一峰,黄 侨,冷曦晨.预弯组合梁桥的弹塑性极限承载能力研究[J].中国公路学报,2005,18(4):54-58.
ZHENG Yi-feng,HUANG Qiao,LENG Xi-chen.Research on Elastic-plastic Ultimate Capacity of Preflex Beam Bridges[J].China Journal of Highway and Transport,2005,18(4):54-58.
[10]郑 宏,杨飞颖,张维刚.钢板深梁屈曲分析[J].建筑科学与工程学报,2007,24(3):31-35.
ZHENG Hong,YANG Fei-ying,ZHANG Wei-gang.Buckling Analysis on Steel Plate Deep Beam[J].Journal of Architecture and Civil Engineering,2007,24(3):31-35.
[11]王爱勤.弹性半空间地基上梁的静力弯曲解析解[J].长安大学学报:自然科学版,2008,28(5):73-76.
WANG Ai-qin.Analytic Solution of Beams Loaded Vertical Force on Elastic Half Space[J].Journal of Chang'an University:Natural Science Edition,2008,28(5):73-76.