[1] PACKER J A.Concrete-filled HSS Connections[J].Journal of Structural Engineering,1995,121(3):458-467.
[2]刘永健.矩形钢管混凝土桁架节点极限承载力试验与设计方法研究[D].长沙:湖南大学,2003.LIU Yong-jian.Experiments on Ultimate Bearing Capacity and Research on Design Method of Joints of Concrete-filled Rectangular Steel Tube Truss[D].Changsha:Hunan University,2003.
[3]刘永健,周绪红,刘君平.矩形钢管混凝土K型节点受力性能试验[J].建筑科学与工程学报,2007,24(2):36-42.LIU Yong-jian,ZHOU Xu-hong,LIU Jun-ping.Experiment on Force Performance of Concrete-filled Rectangular Steel Tube K-joints[J].Journal of Architecture and Civil Engineering,2007,24(2):36-42.
[4]武振宇,丁玉坤.KK型搭接方管节点极限承载力的非线性有限元分析[J].建筑科学与工程学报,2007,24(2):30-35.WU Zhen-yu,DING Yu-kun.Nonlinear Finite Elem-ent Analysis of Ultimate Bearing Capacity of Partially Overlapped SHS KK-joints[J].Journal of Archi-tecture and Civil Engineering,2007,24(2):30-35.
[5]丁玉坤,武振宇,张华山,等.K型、KK型搭接方管节点的试验研究[J].土木工程学报,2005,38(4):25-31.DING Yu-kun,WU Zhen-yu,ZHANG Hua-shan,et al.An Experimental Study on Partially Overlapped SHS K- and KK-joints[J].China Civil Engineering Journal,2005,38(4):25-31.
[6]武 胜,武振宇.弦杆轴力作用下K型间隙方管节点静力性能的研究[J].钢结构,2003,18(2):38-42.WU Sheng,WU Zhen-yu.Static Behavior of Gapped K-type RHS-joints Under Chord Axial Loading[J].Steel Construction,2003,18(2):38-42.
[7]武振宇,张壮南,丁玉坤,等.K型、KK型间隙方钢管节点静力工作性能的试验研究[J].建筑结构学报,2004,25(2):32-38.WU Zhen-yu,ZHANG Zhuang-nan,DING Yu-kun,et al.Experimental Research on Static Behavior of Square Hollow Section K- and KK-joints[J].Journal of Building Structures,2004,25(2):32-38.
[8]武振宇,张耀春.等宽T型方管节点静力工作性能与设计[J].土木工程学报,2004,37(4):23-28.WU Zhen-yu,ZHANG Yao-chun.Static Behavior and Design of Full-width T-type RHS Joints[J].China Civil Engineering Journal,2004,37(4):23-28.
[9]武 胜,武振宇.等宽K型间隙方管节点静力工作性能的研究[J].哈尔滨工业大学学报,2003,35(3):269-275.WU Sheng,WU Zhen-yu.Static Behavior of Gapped K-type Full-width RHS-joints[J].Journal of Harbin Institute of Technology,2003,35(3):269-275.
[10]陈宝春,黄文金.圆管截面桁梁极限承载力试验研究[J].建筑结构学报,2007,28(3):31-36.CHEN Bao-chun,HUANG Wen-jin.Experimental Research on Ultimate Load Carrying Capacity of Truss Girders Made with Circular Tubes[J].Journal of Building Structures,2007,28(3):31-36.
[11]黄文金,陈宝春.钢管混凝土桁梁受弯试验研究[J].建筑科学与工程学报,2006,23(1):29-33.HUANG Wen-jin,CHEN Bao-chun.Experimental Research on Concrete-filled Steel Tube Truss Girder Under Bending[J].Journal of Architecture and Civil Engineering,2006,23(1):29-33.
[12]韩林海.钢管混凝土结构--理论与实践[M].北京:科学出版社,2004.HAN Lin-hai.Concrete-filled Steel Tubular Structure-Theory and Practice[M].Beijing:Science Press,2004.
[13]帕克 J A,亨德森 J E.空心管结构连接设计指南[M]曹俊杰,译.北京:科学出版社,1997.PACKER J A,HENDERSON J E.Design Guide for Steel Hollow Sections Structural Joints[M].Trans-lated by CAO Jun-jie.Beijing:Science Press,1997.
[14]刘永健,周绪红,刘君平.矩形钢管混凝土T、Y型节点受压性能试验[J].长安大学学报:自然科学版,2008,28(5):48-52.LIU Yong-jian,ZHOU Xu-hong,LIU Jun-ping.Behavior of Concrete Filled Rectangular Steel Tube T-joints and Y-joints Under Compression[J].Journal of Chang’an University:Natural Science Edition,2008,28(5):48-52.
[15]温庆杰,叶见曙.混凝土T梁桥拓宽的长期效应分析[J].交通运输工程学报,2007,7(6):90-95.WEN Qing-jie,YE Jian-shu.Long-term Effect Analysis of Widening for Concrete T-girder Bridge[J].Journal of Traffic and Transportation Engineering,2007,7(6):90-95.
[16]卢 斌,文 锋,李世清.大跨径钢管混凝土拱桥施工方法的风洞试验研究[J].筑路机械与施工机械化,2006,23(3):41-43.LU Bin,WEN Feng,LI Shi-qing.Study of Wind-resistant of Integral Lifting Construction for Big Solid in Long-span Concrete-filled Steel Tube Arch Bridge[J].Road Machinery & Construction Mechanization,2006,23(3):41-43.