[1] 王敏强,薛 飞,张 桓,等.铰接板梁桥载荷横向分布影响线计算方法[J].武汉大学学报:工学版,2004,37(4):68-72.
WANG Min-qiang,XUE Fei,ZHANG Huan,et al.Method of Calculation of TransverseLoad Distribution Influence Line for an Articulated Slab Girder Bridge[J].Engineering Journal of Wuhan University,2004,37(4):68-72.
[2]王 佶,曾 智.浅析桥梁荷载横向分布系数计算[J].国外建材科技,2004,25(6):109-110.
WANG Ji,ZENG Zhi.Study of Calculating Load Transverse Distribution Factors of Bridge[J].Science and Technology of Overseas Building Materials,2004,25(6):109-110.
[3]张俊勇,庄月明,刘其伟.板梁桥横向分配能力的测试分析[J].山西建筑,2006,32(14):270-271.
ZHANG Jun-yong,ZHUANG Yue-ming,LIU Qi-wei.The Testing and Anaysis of the Transverse Partition Capability to Plate Girder Brdge[J].Shanxi Architecture,2006,32(14):270-271.
[4]郭 勇,王 媛,张根法,等.预应力混凝土连续箱梁桥计算模型对比分析[J].中国市政工程,2005(4):36-38.
GUO Yong,WANG Yuan,ZHANG Gen-fa,et al.Comparison and Analysis on Calculation Models for Prestressed Concrete Continuous Box-girder Bridge[J].China Municipal Engineering,2005(4):36-38.
[5]HAMBLY E C.Bridge Deck Behaviour[M].London:E & FN Spon,1976.
[6]戴公连,李德建.桥梁结构空间分析设计方法与应用[M].北京:人民交通出版社,2001.
DAI Gong-lian,LI De-jian.Bridge Spatial Structure Design-analysis Method and Application[M].Beijing:China Communications Press,2001.
[7]余钱华,胡世德,范立础.桥梁结构MTMD被动控制机理及试验[J].中国公路学报,2008,21(4):50-54.
YU Qian-hua,HU Shi-de,FAN Li-chu.MTMD Passive Control Mechanism and Experiment on Bridge Structure[J].China Journal of Highway and Transport,2008,21(4):50-54.
[8]宗周红,夏樟华.联合模态柔度和静力位移的桥梁有限元模型修正方法[J].中国公路学报,2008,21(6):43-49.
ZONG Zhou-hong,XIA Zhang-hua.Finite Element Model Updating Method of Bridge Combined Modal Flexibility and Static Displacement[J].China Journal of Highway and Transport,2008,21(6):43-49.
[9]张国平.白河大桥连续空心板梁汛期现浇施工方案的确定[J].筑路机械与施工机械化,2005,22(2):40-41.
ZHANG Guo-ping.Case-in-place Construction Scheme for the Continuous Cored Slab Beam of Baihe Bridge in Flood Season[J].Road Machinery & Construction Mechanization,2005,22(2):40-41.
[10]谭冬莲,宁 立,游金兰.预制预应力混凝土空心板梁施工现场的静载试验研究[J].筑路机械与施工机械化,2007,24(4):51-55.
TAN Dong-lian,NING Li,YOU Jin-lan.Study on Static Load Test of PC Hollow Slab in Construction Field[J].Road Machinery & Construction Mechan-ization,2007,24(4):51-55.
[11]周勇军,赵小星,宋一凡,等.连续梁桥模态分析与试验[J].长安大学学报:自然科学版,2007,27(3):57-60.
ZHOU Yong-jun,ZHAO Xiao-xing,SONG Yi-fan,et al.Modal Analysis and Experiment Test of Continuous Beam Bridge[J].Journal of Chang'an Univer-sity:Natural Science Edition,2007,27(3):57-60.
[12]谭冬莲,肖汝诚.基于改进Gauss-Newton法的在役桥梁结构参数识别[J].长安大学学报:自然科学版,2007,27(4):57-60.
TAN Dong-lian,XIAO Ru-cheng.Parameter Identification of Existing Bridge Structure Based on Improved Gauss-Newton Algorithm[J].Journal of Chang'an University:Natural Science Edition,2007,27(4):57-60.
[13]谭冬莲,肖汝诚.桥梁监测系统中梁桥静力应变传感器的优化配置[J].长安大学学报:自然科学版,2007,27(5):66-69.
TAN Dong-lian,XIAO Ru-cheng.Optimal Placement of Static Strain Sensors of Beam Bridge Structure in Bridge Monitoring System[J].Journal of Chang'an University:Natural Science Edition,2007,27(5):66-69.
[14]沙丽新,阮 欣.桥梁结构健康检测与评估方法发展现状综述[J].青岛建筑工程学院学报,2003,24(4):19-22.
SHA Li-xin,RUAN Xin.State of the Art of Health Inspecting andAssessment Methods in the Bridge Structures[J].Journal of Qingdao Institute of Architecture and Engineering,2003,24(4):19-22.
[15]谌润水,胡钊芳.公路桥梁荷载试验[M].北京:人民交通出版社,2003.
CHEN Run-shui,HU Zhao-fang.Highway Bridge Load Experimentation[M].Beijing:China Communications Press,2003.