|Table of Contents|

Analysis of Web Anti-crack Sensitivity and Tendon-collocating Optimization for Long-span Prestressed Concrete Box-girder Bridge(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2011年03期
Page:
29-33
Research Field:
Publishing date:
2011-09-20

Info

Title:
Analysis of Web Anti-crack Sensitivity and Tendon-collocating Optimization for Long-span Prestressed Concrete Box-girder Bridge
Author(s):
ZHAO Qi-lin DING Yong ZHAI Ke-wei
School of Engineering Corps, PLA University of Science and Technology, Nanjing 210007, Jiangsu, China
Keywords:
inclined crack long-span prestressed concrete box-girder bridge web sensitivity
PACS:
U448.213
DOI:
-
Abstract:
The inclined cracks in webs of prestressed concrete box-girder bridge with suspended construction took place frequently, and it was more common in these with pure vertical tendons than those with bending ones. Comparison of web anti-crack property was conducted between them with the method of sensitivity analysis. Bending tendons were proved not to overcome the principal stress due to vertical tensile stress with the fact that vertical tensile stress exists as well as shear in webs. The need of mixed configuration with bending tendons and vertical ones was highlighted, and suitable proportion between vertical and bending tendons was given. The results indicate the webs with bending tendons are more reliable than those with pure vertical ones obviously even under the same condition.

References:

[1] 冯兆祥,赵启林,吉 林.混凝土连续体系桥梁的病害现状[J].中国市政工程,2008(3):29-31. FENG Zhao-xiang,ZHAO Qi-lin,JI Lin.Existing Hazards on Bridges of Concrete Continuous System[J].China Municipal Engineering,2008(3):29-31.
[2]王国亮,谢 峻,傅宇方.在用大跨度预应力混凝土箱梁桥裂缝调查研究[J].公路交通科技,2008,25(8):52-56. WANG Guo-liang,XIE Jun,FU Yu-fang.Investigation Research on Crack of Long-span Prestressed Concrete Box Girder Bridges in Service[J].Journal of Highway and Transportation Research on Development,2008,25 (8):52-56.
[3]陈露晔,吴文明,陈 瑶.箱梁腹板竖向预应力设置新方法研究[J].公路交通技术,2007(6):48-51. CHEN Lu-ye,WU Wen-ming,CHEN Yao.Research on New Methods for Vertical Pre-stress Setting of Box Beam Webs[J].Technology of Highway and Transport,2007(6):48-51.
[4]陈宇峰,罗 玲,王维红,等.PC连续刚构桥运营阶段箱梁开裂机理及预防措施[J].重庆交通大学学报:自然科学 版,2007,26(6):43-45,114. CHEN Yu-feng,LUO Ling,WANG Wei-hong,et al.Mechanism and Precautionary Measures for Cracking of Pre- stressed Concrete Continuous Box Girder of Continuous and Rigid Frame Bridges in Service Phase [J].Journal of Chongqing Jiaotong University:Natural Science,2007,26(6):43-45,114.
[5]顾凯锋,彭 卫.预应力混凝土连续箱梁桥腹板斜裂缝研究[J].公路,2004(7):35-38. GU Kai-feng,PENG Wei.Research on Inclined Cracks in Webs of Prestressed Concrete Continuous Box-girder [J].Highway,2004(7):35-38.
[6]鄢芳华.悬臂浇注连续箱梁腹板下弯束的设置分析[J].北方交通,2007(12):41-44. YAN Fang-hua.Analysis of Arrangement of Web's Bent-down Tendon of Continuous Box Beam in Cantilever Cast[J].Northern Communications,2007(12):41-44.
[7]JTG D62—2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S]. JTG D62—2004,Code for Design of Highway Re-inforced Concrete and Prestressed Concrete Bridges and Culverts[S].
[8]潘大荣.大跨度预应力混凝土桥梁长期变形控制技术研究[D].南京:中国人民解放军理工大学,2009. PAN Da-rong.Research on Control Technology for Long-term Deformation of Long-span Prestressed Concrete Bridges[D].Nanjing:PLA University of Science and Technology,2009.
[9]吉 林,赵启林,丁 勇.预应力箱梁桥腹板主应力计算探讨[J].公路交通科技,2010,27(6):85-90. JI Lin,ZHAO Qi-lin,DING Yong.Discuss on Calculation of Principal Stress About Webs of Pre-stressed Box- girder Bridge[J].Journal of Highway and Transportation Research and Development,2010,27(6):85-90.

Memo

Memo:
-
Last Update: 2011-09-20