Simulation and Calculation Method of Unloading Process of Long-span Spatial Structures(PDF)

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

Issue:
2011年04期
Page:
19-25
Research Field:
Publishing date:
2011-12-20

Info

Title:
Simulation and Calculation Method of Unloading Process of Long-span Spatial Structures
Author(s):
FAN Zhong LIU Xian-ming FAN Xue-wei LI Li PENG Yi
China Architecture Design & Research Group, Beijing 100044, China
Keywords:
long-span spatial structure unloading simulation technique deformation stress
PACS:
TU245.4
DOI:
-
Abstract:
By using total reaction force of jack to denote the uplifting force, and the top average decrease of temporary supporting tower to denote sinking during unloading process, a simulation and calculation method of unloading process of long-span steel structures was proposed. The study results show that the method can effectively eliminate the effects of various factors, such as the deviation of uplifting and sinking amount of each jack, and be convenient for comparing the measured values with the theoretical calculation values. The method can provide scientific references for guiding unloading construction of long-span steel structures.

References:

[1] BRADSHAW R,CAMPBELL D,GARGARI M,et al.Special Structures:Past,Present,and Future[J].Journal of Structural Engineering,2002,128(4/5/6):691-709.
[2]沈世钊.大跨空间结构理论研究和工程实践[J].中国工程科学,2001,3(3):34-41. SHEN Shi-zhao.Theoretical Study and Engineering Practice of Long-span Spatial Structures[J].En-gineering Science,2001,3(3):34-41.
[3]沈祖炎,张立新.基于非线性有限元的索穹顶施工模拟分析[J].计算力学学报,2002,19(4):466-471. SHEN Zu-yan,ZHANG Li-xin.Simulation of Erection Procedures of Cable Domes Based on Nonlinear FEM[J].Chinese Journal of Computational Mechanics,2002,19(4):466-471.
[4]董石麟,袁行飞,赵宝军,等.索弯顶结构多种预应力张拉施工方法的全过程分析[J].空间结构,2007,13(1):3-14,25. DONG Shi-lin,YUAN Xing-fei,ZHAO Bao-jun,et al.Construction Analysis of Cable-dome Structures Pretensioned by Different Schemes[J].Spatial Structures,2007,13(1):3-14,25.
[5]范 重,吴学敏,郁银泉,等.国家体育场大跨度钢结构修改初步设计[J].空间结构,2005,11(3):3-13,21. FAN Zhong,WU Xue-min,YU Yin-quan,et al.Revised Preliminary Design of Steel Structure of National Stadium Beijing[J].Spatial Structures,2005,11(3):3-13,21.
[6]范 重,刘先明,范学伟,等.国家体育场大跨度钢结构设计与研究[J].建筑结构学报,2007,28(2):1-16. FAN Zhong,LIU Xian-ming,FAN Xue-wei,et al.Design and Research of Large-span Steel Structure for the National Stadium[J].Journal of Building Structures,2007,28(2):1-16.
[7]范 重,刘先明,范学伟,等.国家体育场钢结构设计中的优化技术[J].建筑科学与工程学报,2006,23(2):20-29. FAN Zhong,LIU Xian-ming,FAN Xue-wei,et al.Optimization Techniques of Steel Structure Design for National Stadium[J].Journal of Architecture and Civil Engineering,2006,23(2):20-29.
[8]中国建筑设计研究院.国家体育场钢结构监测与安全性研究[R].北京:中国建筑设计研究院,2008. China Architecture Design & Research Group.Research on the Structural Health Monitoring and Safety of the National Stadium[R].Beijing:China Architecture Design & Research Group,2008.
[9]郑 宏,俞茂宏.基于遗传算法的钢结构优化设计[J].长安大学学报:自然科学版,2002,22(5):65-67. ZHENG Hong,YU Mao-hong.Optimized Design of Steel Frame Structure Using a Genetic Algorithm[J].Journal of Chang'an University:Natural Science Edition,2002,22(5):65-67.
[10]郭彦林,郭宇飞,刘学武.大跨度钢结构屋盖落架分析方法[J].建筑科学与工程学报,2007,24(1):52-58. GUO Yan-lin,GUO Yu-fei,LIU Xue-wu.Analysis Methods of Removing Temporary Supports to Large-span Steel Structural Roof[J].Journal of Architecture and Civil Engineering,2007,24(1):52-58.