|本期目录/Table of Contents|

[1]张 岗,刘天龙,施 颖,等.火灾条件下混凝土箱梁梁端预应力衰变规律[J].建筑科学与工程学报,2016,33(03):65-71.
 ZHANG Gang,LIU Tian-long,SHI Ying,et al.Decay Law of Prestress at Concrete Box Girder End Under Fire Condition[J].Journal of Architecture and Civil Engineering,2016,33(03):65-71.
点击复制

火灾条件下混凝土箱梁梁端预应力衰变规律(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
33卷
期数:
2016年03期
页码:
65-71
栏目:
出版日期:
2016-05-30

文章信息/Info

Title:
Decay Law of Prestress at Concrete Box Girder End Under Fire Condition
作者:
张 岗刘天龙施 颖宣纪明
长安大学公路学院
Author(s):
ZHANG Gang, LIU Tian-long, SHI Ying, XUAN Ji-ming
School of Highway, Chang’an University
关键词:
桥梁工程混凝土箱梁有限元法预应力火灾条件高温
Keywords:
bridge engineering concrete box girder finite element method prestress fire condition high temperature
分类号:
-
DOI:
-
文献标志码:
A
摘要:
针对火灾下混凝土梁桥截面损伤所导致的梁端预应力损失问题,研究了火灾高温传导模式和热传导混合边界条件,设定了预应力混凝土箱梁的火灾场景,给出了混凝土高温强度与刚度的衰减模型和烧损层计算方法;采用热力耦合计算方法和子模型分析方法计算了不同火灾场景中混凝土箱梁梁端区域钢束预应力时程变化曲线;通过工程实例分析了混凝土箱梁梁端截面不同钢束预应力的时变状态,揭示了火灾条件下混凝土箱梁梁端预应力衰变规律;通过曲线的最优与最差拟合及比较分析,提出了混凝土箱梁梁端预应力衰变计算公式。结果表明:处于箱梁梁端腹板上部的钢束预应力变化趋势受梁底部火灾面积的影响,梁底部受火面积较小时,随延火时间的增加逐渐增大,增加趋势平缓,梁底部受火面积增大时,随延火时间的增加平缓衰减;处于箱梁梁端腹板中部的钢束预应力随延火时间的增加始终呈减小趋势,处于腹板下部的钢束预应力随延火时间的增加下降幅度较大,延火至120 min时梁端钢束预应力的衰减终值介于常温下初值的94%~96%;提出的混凝土箱梁梁端预应力衰变计算公式简洁,可为类似预应力混凝土箱梁端部结构的抗火设计提供基础数据。
Abstract:
In view of the problem of prestress loss at girder end caused by section damage of concrete beam bridge under fire, the conduction mode of high temperature in fire and the mixed boundary conditions of heat conduction were studied. The fire scene in prestressed concrete box girder was set, and the decay model for strength and stiffness of concrete in high temperature and calculation method of burning damage layer were proposed. The timehistory variation curves of steel strands prestress at concrete box girder end in different fire scenes were calculated by means of thermomechanical coupled method and submodel analysis method. The time varying state of different steel strands prestress of concrete box girder end section was analyzed through engineering example. The decay law of prestress at concrete box girder end under fire condition was revealed. The calculation formula of prestress decay at concrete box girder end was put forward through comparison and analysis of the best and worst fitting curves. The results show that the variation trend of steel strands prestress in the upper part of web at box girder end is affected by fire area. The prestress increases with the increase of fire time when the fire area is smaller at the bottom of beam, and the increase trend is gentle. The prestress gradually decays with fire time extension when fire area enlarges at the bottom of beam. The steel strands prestress in the middle of web at box girder end always decreases with the increase of fire time. The steel strands prestress in the lower part of web decreases obviously with the increase of fire time. The final decay value of steel strand prestress at girder end is 94%96% of initial value at normal temperature when fire time is 120 min. The proposed calculation formula of prestress decay at concrete box girder end is simple, and can provide basic data for fire resistance design of similar end structure of prestressed concrete box girder.

参考文献/References:

相似文献/References:

[1]刘荣桂,刘德鑫,延永东,等.CFRP筋复合型锚具锚固性能研究[J].建筑科学与工程学报,2013,30(02):9.
 LIU Rong-gui,LIU De-xin,YAN Yong-dong.[J].Journal of Architecture and Civil Engineering,2013,30(03):9.
[2].《建筑科学与工程学报》征稿简则[J].建筑科学与工程学报,2013,30(02):127.
[3]李加武,黄森华,王新.开口断面斜拉桥主梁动力特性的有限元简化计算[J].建筑科学与工程学报,2013,30(04):59.
 LI Jia-wu,HUANG Sen-hua,WANG Xin.Finite Element Simplified Computation for Dynamic Characteristics of Cable-stayed Bridge Girder with Opening Section[J].Journal of Architecture and Civil Engineering,2013,30(03):59.
[4]任 伟,盖轶婷,王 锦.混凝土自锚式悬索桥过程控制状态分析[J].建筑科学与工程学报,2014,31(03):45.
 REN Wei,GAI Yi-ting,WANG Jin.Analysis of Process Control State About Concrete Selfanchored Suspension Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):45.
[5]李加武,周 琴,黄森华.简支梁桥铅芯橡胶支座减震特性研究[J].建筑科学与工程学报,2014,31(03):124.
 LIU Xin-hua,LI Jia-wu,ZHOU Qin,et al.Research on Seismic Isolation Characteristics of LRB for Simply Supported Beam Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):124.
[6]韦建刚,黄 蕾,李佩元,等.旧空心板简支梁桥的连续化改造加固研究[J].建筑科学与工程学报,2014,31(04):103.
 WEI Jian-gang,HUANG Lei,LI Pei-yuan,et al.Research on Continuous Transformation and Reinforcement for Old Simply Supported Hollow Slab Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):103.
[7]周 帅,曾永平,杨国静,等.桥梁箱型吊杆涡振与驰振耦合振动的数值模拟[J].建筑科学与工程学报,2015,32(02):84.
 ZHOU Shuai,ZENG Yong-ping,YANG Guo-jing,et al.Numerical Simulation on Coupled Vibration of Vortex-induced Vibration and Galloping Vibration for Box Hangers of Bridges[J].Journal of Architecture and Civil Engineering,2015,32(03):84.
[8]赵士良,韩万水,鲁永飞,等.重载交通条件下装配式RC板桥抗裂性分析[J].建筑科学与工程学报,2015,32(04):73.
 ZHAO Shi-liang,HAN Wan-shui,LU Yong-fei,et al.Crack Resistance Analysis on Prefabricated RC Slab Bridge Under Heavy Traffic[J].Journal of Architecture and Civil Engineering,2015,32(03):73.
[9]贡金鑫,江力财,赵尚传,等.桥梁拉吊索用不锈钢钢丝腐蚀性能及斜拉索时变可靠度研究[J].建筑科学与工程学报,2015,32(05):8.
 GONG Jin-xin,JIANG Li-cai,ZHAO Shang-chuan,et al.Study on Corrosion Properties of Stainless Steel Wire for Cable Use and Time-variant Reliability of Stay Cable of Bridge[J].Journal of Architecture and Civil Engineering,2015,32(03):8.
[10]李立峰,刘守苗,吴文朋.氯离子侵蚀效应对RC桥墩抗震性能的影响[J].建筑科学与工程学报,2015,32(05):56.
 LI Li-feng,LIU Shou-miao,WU Wen-peng.Influence of Chloride Ion Corrosion on Seismic Performance of Reinforced Concrete Piers[J].Journal of Architecture and Civil Engineering,2015,32(03):56.

备注/Memo

备注/Memo:
更新日期/Last Update: 2016-06-01