[1]朱彦鹏,陈琰娇.抛石挤淤加固公路软基机理研究[J].建筑科学与工程学报,2016,33(04):17-24.
ZHU Yan-peng,CHEN Yan-jiao.Study on Mechanism of Reinforcing Soft Soil Foundation of Highway by Dumping Riprap to Extrude Silt[J].Journal of Architecture and Civil Engineering,2016,33(04):17-24.
点击复制
《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]
- 卷:
-
33卷
- 期数:
-
2016年04期
- 页码:
-
17-24
- 栏目:
-
- 出版日期:
-
2016-07-22
文章信息/Info
- Title:
-
Study on Mechanism of Reinforcing Soft Soil Foundation of Highway by Dumping Riprap to Extrude Silt
- 作者:
-
朱彦鹏,陈琰娇
-
兰州理工大学土木工程学院
- Author(s):
-
ZHU Yan-peng, CHEN Yan-jiao
-
School of Civil Engineering, Lanzhou University of Technology
-
- 关键词:
-
地基处理; 抛石挤淤; 加固机理; 数值模拟; 监测数据
- Keywords:
-
foundation treatment; dumping riprap to extrude silt; reinforcement mechanism; numerical simulation; monitoring data
- 分类号:
-
-
- DOI:
-
-
- 文献标志码:
-
A
- 摘要:
-
选取兰永一级公路的9标段抛石挤淤处理段作为模型,采用有限元软件PLAXIS对其进行数值模拟研究并与实际监测资料进行对比分析;首先对比未处理和经抛石挤淤处理后的地基沉降、水平位移及孔隙水压力,然后选择模型的1个影响因素作为变量,研究该变量对抛石挤淤处理软土地基效果的影响,最后将模拟结果与实际监测数据进行对比。结果表明:经处理后的地基沉降和水平位移均明显减小,并且复合模量较大,整体性较强;孔隙水压力减小说明抛石挤淤处理使地基固结加快;路基沉降量均随抛石体模量、宽度及厚度的增大而减小;随回填砂土厚度变化不规律,需考虑实际情况及当地经验选取抛石体;模拟结果与实际监测结果相差不大,满足工程需求。
- Abstract:
-
Selecting the 9th section of Lanyong firstclass highway which treating soft soil foundation by dumping riprap to extrude silt as the model, finite element software PLAXIS was used to make numerical simulation research and the numerical simulation results were compared with the actual monitoring data. Firstly, the subsidence, horizontal displacement and pore water pressure of foundation treated by dumping riprap to extrude silt and untreated foundation were compared. Secondly, a factor of the model was selected as variable, and the influences of the variable on the soft foundation treating effect by dumping riprap to extrude silt were studied. Finally, the simulation results were compared with the actual monitoring data. The results show that the foundation settlement and horizontal displacement significantly decrease after treatment. The composite modulus is larger and the integrity is stronger after treatment. The decrease of pore water pressure shows that the dumping riprap to extrude silt process accelerates the consolidation of foundation. The subgrade settlement decreases with the increase of width, modulus and thickness of riprap. Since the thickness of backfill sand changes irregularly, the riprap can be chosen according to the actual situation and local experience. The results of simulation and actual monitoring are not quite different, which meet the engineering requirements.
参考文献/References:
-
相似文献/References:
[1]王志丰,王亚琼,谢永利.水泥搅拌桩施工引起深层土体水平位移分析[J].建筑科学与工程学报,2016,33(04):90.
WANG Zhi-feng,WANG Ya-qiong,XIE Yong-li.Investigation Into Lateral Displacement of Subsoils Induced by Installing Soil-cement Columns[J].Journal of Architecture and Civil Engineering,2016,33(04):90.
更新日期/Last Update:
2016-07-22