|本期目录/Table of Contents|

[1]王永刚,尉 敏,王 江,等.涨壳式预应力中空锚杆支护效果及注浆工艺改进研究[J].建筑科学与工程学报,2023,40(03):142-151.[doi:10.19815/j.jace.2022.12055]
 WANG Yonggang,YU Min,WANG Jiang,et al.Study on supporting effect of expansion-shell pre-stressed hollow anchor and improvement of grouting technology[J].Journal of Architecture and Civil Engineering,2023,40(03):142-151.[doi:10.19815/j.jace.2022.12055]
点击复制

涨壳式预应力中空锚杆支护效果及注浆工艺改进研究(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
40卷
期数:
2023年03期
页码:
142-151
栏目:
隧道工程
出版日期:
2023-05-20

文章信息/Info

Title:
Study on supporting effect of expansion-shell pre-stressed hollow anchor and improvement of grouting technology
文章编号:
1673-2049(2023)03-0142-10
作者:
王永刚1,尉 敏1,王 江1,董耀斌1,车志远1,魏 彬2,杨御博3,王志丰3
(1. 中铁北京工程局集团第一工程有限公司,陕西 西安 710100; 2. 河南省新乡市交通运输局,河南 新乡 453000; 3. 长安大学 公路学院,陕西 西安 710064)
Author(s):
WANG Yonggang1,YU Min1, WANG Jiang1, DONG Yaobin1, CHE Zhiyuan1, WEI Bin2,YANG Yubo3, WANG Zhifeng3
(1. The First Engineering Co.,Ltd of China Railway Beijing Engineering Group, Xi'an 710100, Shaanxi, China; 2. Xinxiang Transportation Bureau, Xinxiang 453000, Henan, China; 3. School of Highway, Chang'an University, Xi'an 710064, Shaanxi, China)
关键词:
隧道工程 涨壳式预应力中空锚杆 支护效果 注浆工艺 数值模拟
Keywords:
tunnel engineering expansion-shell pre-stressed hollow anchor supporting effect grouting technology numerical simulation
分类号:
TU472
DOI:
10.19815/j.jace.2022.12055
文献标志码:
A
摘要:
为了研究涨壳式预应力中空锚杆对深埋隧道的支护效果,并对现有注浆工艺提出改进措施,依托中兰铁路香山隧道工程,采用有限差分数值分析软件FLAC3D,对比分析了普通砂浆锚杆和涨壳式预应力中空锚杆支护作用下的隧道围岩变形及应力状态变化情况; 开展现场锚固试验研究,分析了锚杆长度和注浆体龄期对锚杆锚固效果的影响; 进行现场注浆试验研究,分析了注浆方式和注浆压力对涨壳式预应力中空锚杆注浆密实度的影响,并对现有注浆工艺提出了改进措施。结果表明:与普通砂浆锚杆相比,涨壳式预应力中空锚杆控制围岩变形、改善围岩应力状态等的效果更佳,其中围岩变形可减小约40%; 相比于锚固长度,注浆体养护龄期对涨壳式预应力中空锚杆的支护效果影响更为显著,当养护龄期为28 d时,支护效果可提升50.12%; 采用中空杆体内注浆方式时,注浆压力需大于0.8 MPa方可达到最佳效果,且该注浆方式适用于涨壳式预应力中空锚杆水平或向下安装; 采用中空杆体外注浆方式时,宜采用更大的注浆压力,且该注浆方式适用于锚杆向上安装; 改进后的锚杆注浆口可以有效防止漏浆,保证了注浆的密实度,对保护锚杆和加强锚杆与地层联结均有积极作用。
Abstract:
In order to study the supporting effect of expansion-shell pre-stressed hollow anchor on deep-buried tunnels and put forward improvement measures for the existing grouting technology, based on the Xiangshan Tunnel project of Zhongwei-Lanzhou Railway, the finite difference numerical analysis software FLAC3D was used to compare and analyze the deformation and stress state of tunnel surrounding rock under the support of ordinary mortar anchor and expansion-shell pre-stressed hollow anchor. The influence of anchor length and grouting age on the anchoring effect was analyzed by field anchoring test. Based on the field grouting test, the influence of grouting method and grouting pressure on the grouting compactness of expansion-shell pre-stressed hollow anchor was analyzed, and the improvement measures for the existing grouting technology were put forward. The results show that compared with the ordinary mortar anchor, the expansion-shell pre-stressed hollow anchor has better effect on controlling the deformation and stress state of the surrounding rock, and the deformation of surrounding rock can be reduced by about 40%. Compared with the anchorage length, the curing age of grouting has a more significant effect on the supporting effect of expansion-shell pre-stressed hollow anchor. When the curing age is 28 d, the supporting effect can be improved by 50.12%. When the internal grouting of anchor is adopted, the grouting pressure needs to be greater than 0.8 MPa to achieve the best effect, and the grouting method is suitable for the horizontal and downward installation of the expansion-shell pre-stressed hollow anchor. When the external grouting of anchor is adopted, the greater grouting pressure should be adopted, and the grouting method is suitable for the upward installation of the anchor. The improved grouting port of anchor can effectively prevent slurry leakage and ensure the compactness of grouting, which plays a positive role in protecting anchor and strengthening the connection between anchor and stratum.

参考文献/References:

[1] 新华社.中共中央 国务院印发《交通强国建设纲要》[EB/OL].(2019-09-19)[2023-04-11].http://www.gov.cn/zhengce/2019-09/19/content_5431432.htm.
Xinhua News Agency.The CPC Central Committee and State Council issued Outline of Building a Strong Transportation Country[EB/OL].(2019-09-19)[2023-04-11].http://www.gov.cn/zhengce/2019-09/19/content_5431432.htm.
[2]张建均,荣春堂.锦屏二级水电站涨壳式预应力中空注浆锚杆施工[J].水力发电,2008,34(9):43-45.
ZHANG Jianjun,RONG Chuntang.Construction technique of expanding-shell pre-stressed hollow pouring anchorage rod of Jinping cascade-II hydropower station[J].Water Power,2008,34(9):43-45.
[3]张全彪.锦屏二级水电站机械涨壳式预应力中空注浆锚杆施工技术[J].水利水电技术,2008,39(11):46-48.
ZHANG Quanbiao.Construction technology of mechanical shell expansion prestressed hollow grouting anchor rod in Jinping Ⅱ hydropower station[J].Water Resources and Hydropower Engineering,2008,39(11):46-48.
[4]卢小刚.涨壳式预应力中空锚杆的研究与应用[J].铁道建筑技术,2009(11):96-98,121.
LU Xiaogang.Study and application of the expanding-shell pre-stressed hollow anchor rod[J].Railway Construction Technology,2009(11):96-98,121.
[5]冯 艺,石 钊,张照太,等.涨壳式中空预应力锚杆在TBM法隧洞施工中的应用和改进[J].现代隧道技术,2011,48(1):160-164.
FENG Yi,SHI Zhao,ZHANG Zhaotai,et al.Application and modification of swelling prestressed bolts in a TBM excavated tunnel[J].Modern Tunnelling Technology,2011,48(1):160-164.
[6]杨瑞莲,刘 文.大型地下洞室高边墙围岩固壁预应力锚固新技术研究[J].隧道建设,2010,30(4):439-445,464.
YANG Ruilian,LIU Wen.Study on prestressed anchoring technology used in large-scale underground power plant[J].Tunnel Construction,2010,30(4):439-445,464.
[7]吴大伟,吴爱军,苏华友.大断面巷道中空预应力注浆锚杆的支护效果研究[J].中国安全生产科学技术,2015,11(8):90-95.
WU Dawei,WU Aijun,SU Huayou.Study on support effect of hollow pre-stress grouting anchor in large section roadway[J].Journal of Safety Science and Technology,2015,11(8):90-95.
[8]刘 江,王 军,徐腾辉.涨壳式预应力中空锚杆在机械化开挖大断面隧道中的施工应用研究[J].隧道建设(中英文),2018,38(增2):324-329.
LIU Jiang,WANG Jun,XU Tenghui.Research of swelling prestressed bolts using in mechanized excavation of large section tunnel[J].Tunnel Construction,2018,38(S2):324-329.
[9]张喜涛,苏华友,吴爱军,等.预应力中空注浆锚杆锚固机理与参数分析[J].中国安全生产科学技术,2015,11(9):31-37.
ZHANG Xitao,SU Huayou,WU Aijun,et al.Analysis on anchoring mechanism and parameters of prestressed hollow grouting bolt[J].Journal of Safety Science and Technology,2015,11(9):31-37.
[10]陈 琼,庞 琦,隋学华,等.涨壳式中空锚杆抗冲击性能现场试验研究[J].价值工程,2019,38(34):130-131.
CHEN Qiong,PANG Qi,SUI Xuehua,et al.Field test study on impact resistance of shell-type hollow anchor[J].Value Engineering,2019,38(34):130-131.
[11]吴德兴,汪 波,孙 钧.新型锚杆支护技术与工程实践[M].上海:上海科学技术出版社,2020.
WU Dexing,WANG Bo,SUN Jun.New bolt support technology and engineering practice[M].Shanghai:Shanghai Scientific & Technical Publishers,2020.
[12]汪 波,何 川.预应力中空注浆锚杆在苍岭隧道防岩爆设计中的应用[J].公路,2011,56(10):206-210.
WANG Bo,HE Chuan.Application of prestressed hollow grouting anchor in rock burst prevention design of cangling tunnel[J].Highway,2011,56(10):206-210.
[13]汪 波,喻 炜,刘锦超,等.交通/水工隧道中基于预应力锚固系统的及时主动支护理念及其技术实现[J].中国公路学报,2020,33(12):118-129.
WANG Bo,YU Wei,LIU Jinchao,et al.Timely-active support theory and its application in transportation/hydraulic tunnels based on pre-stressed anchorage system[J].China Journal of Highway and Transport,2020,33(12):118-129.
[14]朱珍德,舒晓云,陈卫忠,等.一种改进的中空注浆锚杆连接段螺纹参数优化分析[J].煤炭学报,2022,47(6):2300-2310.
ZHU Zhende,SHU Xiaoyun,CHEN Weizhong,et al.Optimization analysis on thread connection parameters of an improved hollow grouting bolt[J].Journal of China Coal Society,2022,47(6):2300-2310.
[15]陈昌富,朱世民,高 傑,等.考虑注浆压力影响锚-土界面剪切蠕变Kriging模型[J].岩土工程学报,2019,41(增1):125-128.
CHEN Changfu,ZHU Shimin,GAO Jie,et al.Kriging method-based creep model for anchor-soil interface considering grouting pressure[J].Chinese Journal of Geotechnical Engineering,2019,41(S1):125-128.
[16]陈昌富,刘俊斌,徐优林,等.锚-土界面剪切蠕变试验及其经验模型研究[J].岩土工程学报,2016,38(10):1762-1768.
CHEN Changfu,LIU Junbin,XU Youlin,et al.Tests on shearing creep of anchor-soil interface and its empirical model[J].Chinese Journal of Geotechnical Engineering,2016,38(10):1762-1768.
[17]许万忠,曹 平,彭振斌,等.考虑弱面注浆因素对加锚层理边坡抗剪性能影响的力学机制分析[J].岩石力学与工程学报,2006,25(7):1475-1480.
XU Wanzhong,CAO Ping,PENG Zhenbin,et al.Analysis of mechanical mechanism of shear characteristic of bolted layered slope considering grouting factor of weak plane[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(7):1475-1480.
[18]叶新宇,彭 锐,马新岩,等.压密效应对新型压密注浆土钉的强化研究[J].岩土工程学报,2021,43(9):1649-1656,1738.
YE Xinyu,PENG Rui,MA Xinyan,et al.Enhancement of compaction grouting on a compaction-grouted soil nail in sand[J].Chinese Journal of Geotechnical Engineering,2021,43(9):1649-1656,1738.
[19]张广兴,管林波.压力注浆参数对土钉受力性状影响的试验研究[J].岩土工程学报,2014,36(增2):489-494.
ZHANG Guangxing,GUAN Linbo.Experimental study on effect of pressure grouting parameters on bearing capacity behavior of soil nailings[J].Chinese Journal of Geotechnical Engineering,2014,36(S2):489-494.
[20]HONG C Y,YIN J H,PEI H,et al.Experimental study on the pullout resistance of pressure-grouted soil nails in the field[J].Canadian Geotechnical Journal,2013,50:693-704.
[21]YIN J H,ZHOU W H.Influence of grouting pressure and overburden stress on the interface resistance of a soil nail[J].Journal of Geotechnical and Geoenvironmental Engineering,2009,135(9):1198-1208.
[22]WANG Q,YE X Y,WANG S Y,et al.Experimental investigation of compaction grouted soil nails[J].Canadian Geotechnical Journal,2017,54(12):1728-1738.
[23]陈育民,徐鼎平.FLAC/FLAC3D基础与工程实例[M].2版.北京:中国水利水电出版社,2013.
CHEN Yumin,XU Dingping.FLAC/FLAC3D foundation and engineering example[M].2nd ed.Beijing:China Water & Power Press,2013.
[24]黄庆享.公路隧道TZL预应力锚杆支护效果对比试验研究[J].西安公路交通大学学报,2000,20(4):39-42.
HUANG Qingxiang.The contrast bolting test on TZL pretension bolt in highway tunnel[J].Journal of Xi'an Highway University,2000,20(4):39-42.
[25]刘林胜,李 洋,李为腾,等.地铁暗挖车站端锚锚杆预应力功效研究[J].隧道建设(中英文),2021,41(增2):255-260.
LIU Linsheng,LI Yang,LI Weiteng,et al.Prestress effect of end anchor bolt in mined metro station[J].Tunnel Construction,2021,41(S2):255-260.
[26]康红普,姜铁明,高富强.预应力锚杆支护参数的设计[J].煤炭学报,2008,33(7):721-726.
KANG Hongpu,JIANG Tieming,GAO Fuqiang.Design for pretensioned rock bolting parameters[J].Journal of China Coal Society,2008,33(7):721-726.
[27]赵明华,刘峻龙,龙 照.锚杆变形分析与临界锚固长度计算[J].建筑科学与工程学报,2008,25(3):17-21.
ZHAO Minghua,LIU Junlong,LONG Zhao.Deformation analysis of bolt and calculation of critical anchorage length[J].Journal of Architecture and Civil Engineering,2008,25(3):17-21.
[28]张建清,吴继敏,彭 冈,等.基于声波无损检测的特殊锚杆质量影响因素[J].河海大学学报(自然科学版),2009,37(2):179-184.
ZHANG Jianqing,WU Jimin,PENG Gang,et al.Factors in quality of special bolts based on sonic non-destructive detection[J].Journal of Hohai University(Natural Sciences),2009,37(2):179-184.
[29]杨江华,朱国进.声波反射法在锚杆锚固质量检测中的应用[J].云南大学学报(自然科学版),2017,39(增2):302-304.
YANG Jianghua,ZHU Guojin.Application of acoustic reflection method in quality inspection of anchor bolt[J].Journal of Yunnan University(Natural Sciences Edition),2017,39(S2):302-304.

相似文献/References:

[1]石 刚,富志鹏,谢永利,等.公路隧道穿越采空区的探测与处理技术研究[J].建筑科学与工程学报,2014,31(03):64.
 SHI Gang,FU Zhi-peng,XIE Yong-li,et al.Research on Detection and Treatment Technology of Exhausted Areas in Highway Tunnel Construction[J].Journal of Architecture and Civil Engineering,2014,31(03):64.
[2]赵 颖,赵亚哥白,郭恩栋,等.通过活断层区地铁隧道损伤分析[J].建筑科学与工程学报,2015,32(06):82.
 ZHAO Ying,ZHAO Ya-gebai,GUO En-dong,et al.Damage Analysis of Metro Tunnel Across Active Fault[J].Journal of Architecture and Civil Engineering,2015,32(03):82.
[3]孙铁军,王 伟,罗明睿,等.不同衬砌结构缺陷对隧道结构整体安全性的影响[J].建筑科学与工程学报,2017,34(03):82.
 SUN Tie-jun,WANG Wei,LUO Ming-rui,et al.Influences of Different Lining Structure Defects on Overall Safety of Tunnel Structure[J].Journal of Architecture and Civil Engineering,2017,34(03):82.
[4]朱彦鹏,何江飞,李军.黄土公路隧道浅埋段管棚注浆支护机理及监测分析[J].建筑科学与工程学报,2011,28(01):11.
 ZHU Yan-peng,HE Jiang-fei,LI Jun.Support Mechanism and Monitoring Analysis of Pipe Roof Grouting for Loess Highway Tunnel in Shallow-buried Section[J].Journal of Architecture and Civil Engineering,2011,28(03):11.
[5]陈建勋,乔雄.黄土隧道浅埋偏压洞口段套拱结构受力监测与分析[J].建筑科学与工程学报,2011,28(01):100.
 CHEN Jian-xun,QIAO Xiong.Mechanical Monitoring and Analysis of Umbrella Arch Structure in Shallow-buried Bias Loess Tunnel Entrance[J].Journal of Architecture and Civil Engineering,2011,28(03):100.
[6]王梦恕.台湾海峡越海通道方案前期研究[J].建筑科学与工程学报,2012,29(03):4.
 WANG Meng-shu.Preliminary Research on Taiwan Strait Cross-sea Channel Schemes[J].Journal of Architecture and Civil Engineering,2012,29(03):4.
[7]张立鑫,陈丽俊,陈建勋,等.单斜构造软硬互层围岩隧道变形特征及控制对策[J].建筑科学与工程学报,2021,38(06):186.[doi:10.19815/j.jace.2021.04102]
 ZHANG Li-xin,CHEN Li-jun,CHEN Jian-xun,et al.Deformation Characteristics and Treatment Measures of Tunnels in Soft and Hard Interbedded Surrounding Rock with Tilted Stratum[J].Journal of Architecture and Civil Engineering,2021,38(03):186.[doi:10.19815/j.jace.2021.04102]
[8]李大军,何鹏飞,宋克志,等.复杂硐室交叉口转向挑顶施工力学行为研究[J].建筑科学与工程学报,2023,40(02):172.[doi:10.19815/j.jace.2022.11120]
 LI Dajun,HE Pengfei,SONG Kezhi,et al.Research on construction mechanical behavior of turning overhanging at intersection of complex chamber[J].Journal of Architecture and Civil Engineering,2023,40(03):172.[doi:10.19815/j.jace.2022.11120]
[9]杨晓华,曹扬帆,肖 靖,等.开挖方式对跨基覆界面浅埋偏压隧道变形的影响分析[J].建筑科学与工程学报,2023,40(03):111.[doi:10.19815/j.jace.2021.11023]
 YANG Xiaohua,CAO Yangfan,XIAO Jing,et al.Analysis of influence of excavation methods on deformation of shallow-buried bias tunnels across base and cover interface[J].Journal of Architecture and Civil Engineering,2023,40(03):111.[doi:10.19815/j.jace.2021.11023]
[10]赵鹏宇,黄解放,陈建勋,等.寒冷地区隧道防冻保温层等效厚度计算方法误差分析[J].建筑科学与工程学报,2023,40(04):135.[doi:10.19815/j.jace.2022.04109]
 ZHAO Pengyu,HUANG Jiefang,CHEN Jianxun,et al.Error analysis of equivalent thickness calculation method of tunnel thermal insulation layer in cold area[J].Journal of Architecture and Civil Engineering,2023,40(03):135.[doi:10.19815/j.jace.2022.04109]

备注/Memo

备注/Memo:
收稿日期:2022-12-15
基金项目:国家重点研发计划项目(2021YFB2600404); 国家自然科学基金项目(52178310)
作者简介:王永刚(1979-),男,高级工程师,E-mail:16831211@qq.com。
通信作者:王志丰(1986-),男,工学博士,教授,博士生导师,E-mail:zhifeng.wang@chd.edu.cn。
更新日期/Last Update: 2023-05-20