|本期目录/Table of Contents|

[1]吴文清,陈小刚,李波,等.预应力混凝土连续箱梁施工质量评价指标调查[J].建筑科学与工程学报,2009,26(03):42-48.
 WU Wen-qing,CHEN Xiao-gang,LI Bo,et al.Investigation of Construction Quality Evaluating Indices in PC Continuous Box-girder[J].Journal of Architecture and Civil Engineering,2009,26(03):42-48.
点击复制

预应力混凝土连续箱梁施工质量评价指标调查(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
26卷
期数:
2009年03期
页码:
42-48
栏目:
出版日期:
2009-09-20

文章信息/Info

Title:
Investigation of Construction Quality Evaluating Indices in PC Continuous Box-girder
作者:
吴文清1,陈小刚2,李波1,谢群华1
1.东南大学交通学院,江苏南京210096;2.浙江省交通规划设计研究院,浙江杭州310006
Author(s):
WU Wen-qing1, CHEN Xiao-gang2, LI Bo1, XIE Qun-hua1
1. School of Transportation, Southeast University, Nanjing 210096, Jiangsu, China; 2. Zhejiang Provincial Planning Design & Research Institute of Communications, Hangzhou 310006, Zhejiang, China
关键词:
桥梁工程 预应力混凝土连续箱梁 孔道灌浆 混凝土超方 施工质量 评价指标
Keywords:
bridge engineering PC continuous box-girder duct grouting concrete overweight construction quality evaluating index
分类号:
U446
DOI:
-
文献标志码:
A
摘要:
基于3座预应力混凝土连续箱梁桥的拆除工程,对预应力混凝土箱梁结构的预应力孔道灌浆饱满度、混凝土超方量及混凝土保护层厚度等施工质量评价指标进行了实地调查,并对实测指标进行了统计分析,揭示了预应力混凝土连续箱梁的施工质量现状。结果表明:中国预应力混凝土连续箱梁的总体混凝土超方率偏大,超方率一般在10%~20%,混凝土超方主要集中在箱梁顶板和底板; 箱梁纵向预应力孔道灌浆不密实的比例超过50%,横向预应力孔道灌浆未达到密实状态的比例也超过70%,上述情况将使结构预应力损失增大; 同时,截面混凝土超方及预应力损失增大将使预应力混凝土箱梁截面主拉应力增长明显,从而增大结构开裂的可能性; 提出的量化分析指标有助于正确认识预应力混凝土箱梁桥上部结构普遍开裂和下挠过大的内在原因,为此类结构的研究提供了重要的依据。
Abstract:
Based on the dismantlement of three prestressed concrete(PC)continuous box-girder bridges, several construction quality evaluating indices for PC box-girder structure were investigated on the spot,which consisted of the duct groutingdensity degree of prestressing bars, concrete overweight percent and concrete protector thickness and so on, and then the indices were analyzed statistically to find out the current construction quality of PC continuous box-girder. The results indicate that the overweight ratio of PC continuous box-girder in China is on the high level generally, it varies between 10% and 20%, and the performance of concrete overweight centres at top slab and low slab of box-girder generally. The duct area percentage of partial grouting for longitudinal prestressing bar is more than 50%, and the percentage for lateral prestressing bar duct grouting is more than 70%, but the performance of duct grouting being noncompacted in a large proportion make the prestressing loss increase obviously. In another side, the true calculating example in the paper indicates that concrete overweight and prestressing loss will enlarge the principal tension stress in PC box-girder, and make the possibility of structure cracking increase. The quantized surveyed indices proposed in the paper is helpful to realize the actual reason for cracking and big flexural down-warping of PC box-girder bridge, and also provide the important basis for structural analysis of PC box-girder.

参考文献/References:

[1] 周 履.美国各类公路桥梁的结构缺陷率及使用寿命期望值的统计数据(1950~1994)[J].国外桥梁,1999(3):37. ZHOU Lu.Structure Defective Rate and Statistics Data for Service Life Expectation of All Highway Bridge in USA(1950~1994)[J].Foreign Bridges,1999(3):37.
[2]王国亮,谢 峻,傅宇方.在用大跨度预应力混凝土箱梁桥裂缝调查研究[J].公路交通科技,2008,25(8):52-56. WANG Guo-liang,XIE Jun,FU Yu-fang.Investigation Research on Crack of Long-span Prestressed Concrete Box Girder Bridges in Service[J].Journal of Highway and Transportation Research and Development,2008,25(8):52-56.
[3]谢 峻,王国亮,郑晓华.大跨径预应力混凝土箱梁桥长期下挠问题的研究现状[J].公路交通科技,2007,24(1):47-50. XIE Jun,WANG Guo-liang,ZHENG Xiao-hua.State of Art of Long-term Deflection for Long Span Prestressed Concrete Box-girder Bridge[J].Journal of Highway and Transportation Research and Development,2007,24(1):47-50.
[4]卢树圣.现代预应力混凝土桥梁结构的新发展[J].桥梁建设,1996(1):41-48. LU Shu-sheng.New Advancements in Modern Prestressed Concrete Bridge Structures[J].Bridge Construction,1996(1):41-48.
[5]周 履.无粘结力筋与体外力筋预应力混凝土桥梁的发展历程与现状[J].桥梁建设,1997(3):1-12. ZHOU Lu.A Historical Review and the State of the Art of the Application of Unbonded and External Tendons in Prestressed Concrete Bridges[J].Bridge Construction,1997(3):1-12.
[6]杜进生,刘西拉.无粘结预应力混凝土构件的可靠度分析[J].建筑结构学报,2002,23(1):68-74. DU Jin-sheng,LIU Xi-la.Reliability Analysis of Unbonded Prestressed Concrete Members[J].Journal of Building Structures,2002,23(1):68-74.
[7]LI X P,ROBERTSON I N.Long-term Performance Predictions of the North Halawa Valley Viaduct[R].Honolulu:University of Hawaii,2003.
[8]李祖云.桥梁结构采用无粘结预应力混凝土之我见[J].中南公路工程,1999,24(1):39-40. LI Zu-yun.My View to the Application of Unbonded Prestressed Concrete in Bridge Structure[J].Central South Highway Engineering,1999,24(1):39-40.
[9]郭秉山,彭 军,刘朝科.梁腹板削弱式刚性钢框架抗震性能研究[J].西安科技大学学报,2007,27(3):364-367. GUO Bing-shan,PENG Jun,LIU Chao-ke.Anti-seismic Performance Testing of New Beam-to-column Connections in Steel Frames[J].Journal of Xi'an University of Science and Technology,2007,27(3):364-367.
[10]赵 煜,刘 波.大曲率连续钢箱梁桥剪力滞试验与分析[J].西安科技大学学报,2006,26(3):311-316. ZHAO Yu,LIU Bo.Test and Analysis of Shear Lag for Continuous Steel Bridge with Large Curvature[J].Journal of Xi'an University of Science and Technology,2006,26(3):311-316.
[11]王春生,宋天诣,冯亚成,等.高强钢-混凝土组合梁受力性能分析[J].交通运输工程学报,2008,8(2):27-33. WANG Chun-sheng,SONG Tian-yi,FENG Ya-cheng,et al.Structural Behavior Analysis of High Strength Steel-concrete Composite Girders[J].Journal of Traffic and Transportation Engineering,2008,8(2):27-33.
[12]张 峰,叶见曙,徐向锋.预应力混凝土梁非线性分析单元模型[J].交通运输工程学报,2007,7(5):68-72. ZHANG Feng,YE Jian-shu,XU Xiang-feng.Nonlinear Analysis Element Model of Prestressed Concrete Beam[J].Journal of Traffic and Transportation Engin-eering,2007,7(5):68-72.

相似文献/References:

[1]刘荣桂,刘德鑫,延永东,等.CFRP筋复合型锚具锚固性能研究[J].建筑科学与工程学报,2013,30(02):9.
 LIU Rong-gui,LIU De-xin,YAN Yong-dong.[J].Journal of Architecture and Civil Engineering,2013,30(03):9.
[2].《建筑科学与工程学报》征稿简则[J].建筑科学与工程学报,2013,30(02):127.
[3]李加武,黄森华,王新.开口断面斜拉桥主梁动力特性的有限元简化计算[J].建筑科学与工程学报,2013,30(04):59.
 LI Jia-wu,HUANG Sen-hua,WANG Xin.Finite Element Simplified Computation for Dynamic Characteristics of Cable-stayed Bridge Girder with Opening Section[J].Journal of Architecture and Civil Engineering,2013,30(03):59.
[4]任 伟,盖轶婷,王 锦.混凝土自锚式悬索桥过程控制状态分析[J].建筑科学与工程学报,2014,31(03):45.
 REN Wei,GAI Yi-ting,WANG Jin.Analysis of Process Control State About Concrete Selfanchored Suspension Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):45.
[5]李加武,周 琴,黄森华.简支梁桥铅芯橡胶支座减震特性研究[J].建筑科学与工程学报,2014,31(03):124.
 LIU Xin-hua,LI Jia-wu,ZHOU Qin,et al.Research on Seismic Isolation Characteristics of LRB for Simply Supported Beam Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):124.
[6]韦建刚,黄 蕾,李佩元,等.旧空心板简支梁桥的连续化改造加固研究[J].建筑科学与工程学报,2014,31(04):103.
 WEI Jian-gang,HUANG Lei,LI Pei-yuan,et al.Research on Continuous Transformation and Reinforcement for Old Simply Supported Hollow Slab Bridge[J].Journal of Architecture and Civil Engineering,2014,31(03):103.
[7]周 帅,曾永平,杨国静,等.桥梁箱型吊杆涡振与驰振耦合振动的数值模拟[J].建筑科学与工程学报,2015,32(02):84.
 ZHOU Shuai,ZENG Yong-ping,YANG Guo-jing,et al.Numerical Simulation on Coupled Vibration of Vortex-induced Vibration and Galloping Vibration for Box Hangers of Bridges[J].Journal of Architecture and Civil Engineering,2015,32(03):84.
[8]赵士良,韩万水,鲁永飞,等.重载交通条件下装配式RC板桥抗裂性分析[J].建筑科学与工程学报,2015,32(04):73.
 ZHAO Shi-liang,HAN Wan-shui,LU Yong-fei,et al.Crack Resistance Analysis on Prefabricated RC Slab Bridge Under Heavy Traffic[J].Journal of Architecture and Civil Engineering,2015,32(03):73.
[9]贡金鑫,江力财,赵尚传,等.桥梁拉吊索用不锈钢钢丝腐蚀性能及斜拉索时变可靠度研究[J].建筑科学与工程学报,2015,32(05):8.
 GONG Jin-xin,JIANG Li-cai,ZHAO Shang-chuan,et al.Study on Corrosion Properties of Stainless Steel Wire for Cable Use and Time-variant Reliability of Stay Cable of Bridge[J].Journal of Architecture and Civil Engineering,2015,32(03):8.
[10]李立峰,刘守苗,吴文朋.氯离子侵蚀效应对RC桥墩抗震性能的影响[J].建筑科学与工程学报,2015,32(05):56.
 LI Li-feng,LIU Shou-miao,WU Wen-peng.Influence of Chloride Ion Corrosion on Seismic Performance of Reinforced Concrete Piers[J].Journal of Architecture and Civil Engineering,2015,32(03):56.

备注/Memo

备注/Memo:
收稿日期:2009-06-15
基金项目:国家高技术研究发展计划(“八六三”计划)项目(2007AA11Z106)
作者简介:吴文清(1964-),男,浙江龙游人,副教授,工学博士,E-mail:wqwuxu@163.com。
更新日期/Last Update: 2009-09-20