[1] 吕茫茫,关贸军.混凝土预制构件企业发展的现状和出路[J].结构工程师,2000(增1):449-453.
LU Mang-mang,GUAN Mao-jun.The Current Situ-ation and Wayout of Prefabricated Concrete Manufacturer in China[J].Structural Engineers,2000(S1):449-453.
[2]谢尊渊,方先和.建筑施工[M].北京:中国建筑工业出版社,1998.
XIE Zun-yuan,FANG Xian-he.Building Construction[M].Beijing:China Architecture & Building Press,1998.
[3]张立波.高层建筑设计施工规范与新技术应用实务全书[M].北京:海洋出版社,2000.
ZHANG Li-bo.Construction Specification for Design of High-rise Buildings and New Technology Application Guidelines[M].Beijing:Ocean Press,2000.
[4]PARK R,THOMPSON K J.Cyclic Load Tests on Prestressed and Partially Prestressed Beam-column Joints[J].PCI Journal,1977,22(5):84-110.
[5]PARK R,BULL D K.Seismic Resistance of Frames Incorporating Precast Prestressed Concrete Beam Shells[J].PCI Journal,1986,31(4):54-93.
[6]林宗凡,SAGAN E I,KREGER M E.装配式抗震框架延性节点的研究[J].同济大学学报:自然科学版,1998,26(2):134-138.
LIN Zong-fan,SAGAN E I,KREGER M E.Study on the Ductile Connections for Precast Aseismic Frame[J].Journal of Tongji University:Natural Science,1998,26(2):134-138.
[7]赵 斌,吕西林,刘丽珍.全装配式预制混凝土结构梁柱组合件抗震性能试验研究[J].地震工程与工程振动,2005,25(1):81-87.
ZHAO Bin,LU Xi-lin,LIU Li-zhen.Experimental Study on Seismic Behavior of Precast Concrete Beam-column Subassemblage with Fully Assembled Joint[J].Earthquake Engineering and Engineering Vibration,2005,25(1):81-87.
[8]薛伟辰,杨新磊,王 蕴,等.现浇柱叠合梁框架节点抗震性能试验研究[J].建筑结构学报,2008,29(6):9-17.
XUE Wei-chen,YANG Xin-lei,WANG Yun,et al.Experimental Study on Seismic Behavior of Different Type of Frame Connections with Composite Beams and Cast-in-place Columns[J].Journal of Building Structures,2008,29(6):9-17.