[1]宋满荣,胡忍强,黄慎江,等.预压装配式预应力混凝土框架边柱拆除时抗连续倒塌性能试验研究与理论分析[J].建筑科学与工程学报,2022,39(03):64-74.[doi:10.19815/j.jace.2021.12025]
 SONG Man-rong,HU Ren-qiang,HUANG Shen-jiang,et al.Experimental Research and Theoretical Analysis on Progressive Collapse Resistance of Prestressed Fabricated PC Frame with Removal of Side Columns[J].Journal of Architecture and Civil Engineering,2022,39(03):64-74.[doi:10.19815/j.jace.2021.12025]
点击复制

预压装配式预应力混凝土框架边柱拆除时抗连续倒塌性能试验研究与理论分析(PDF)
分享到:

《建筑科学与工程学报》[ISSN:1673-2049/CN:61-1442/TU]

卷:
39卷
期数:
2022年03期
页码:
64-74
栏目:
出版日期:
2022-05-30

文章信息/Info

Title:
Experimental Research and Theoretical Analysis on Progressive Collapse Resistance of Prestressed Fabricated PC Frame with Removal of Side Columns
文章编号:
1673-2049(2022)03-0064-11
作者:
宋满荣1,2,胡忍强1,2,黄慎江1,2,刘辰谱1,2,何嘉轩1,2,柳炳康1,2
(1. 合肥工业大学 土木与水利工程学院,安徽 合肥 230009; 2. 合肥工业大学 土木工程结构与材料安徽省重点实验室,安徽 合肥 230009)
Author(s):
SONG Man-rong1,2, HU Ren-qiang1,2, HUANG Shen-jiang1,2, LIU Chen-pu1,2, HE Jia-xuan1,2, LIU Bing-kang1,2
(1. School of Civil Engineering and Hydraulic Engineering, Hefei University of Technology, Hefei 230009,Anhui, China; 2. Anhui Key Laboratory of Civil Engineering Structures and Materials, Hefei University of Technology, Hefei 230009, Anhui, China)
关键词:
预压装配式预应力混凝土框架 连续倒塌 拆除边柱 试验研究 理论分析
Keywords:
prestressed fabricated PC frame progressive collapse removal of side column experimental research theoretical analysis
分类号:
TU378.4
DOI:
10.19815/j.jace.2021.12025
文献标志码:
A
摘要:
对一榀二层二跨预压装配式预应力混凝土(PC)平面框架进行了静力拆除底层边柱的试验及理论分析,探究了裂缝发展、变形能力、破坏模式及连续倒塌机理。根据试验框架达到极限承载力时的状态,提出了边柱失效时简化的结构抗力分析模型,并推导出结构抗倒塌极限承载力的计算方法; 基于能量法建立近似的动力响应评估模型,根据试验框架静力加载荷载-位移曲线近似得到其在边柱瞬时失效时的动力响应曲线。结果表明:框架的受力过程可分为弹性、弹塑性、塑性铰以及倒塌4个阶段; 加载时试件的混凝土裂缝开展及破坏集中在失效边柱相邻区域框架梁两侧梁端结合部,除失效边柱外,其余框架柱以及失效柱远离区域框架梁端基本完好; 框架在小变形阶段按梁机制受力,存在压拱效应及空腹效应; 在大变形阶段不能按悬链线机制受力,由梁的受弯机制和空腹机制共同抵抗不平衡荷载; 边柱失效时预压装配式预应力混凝土框架最大抗力达到60.9 kN,最终倒塌位移为430 mm,梁端转角为10.0°~15.3°,具有较好的抗连续倒塌能力。
Abstract:
The experiment and theoretical analysis of static removal of bottom side columns of a two-story and two-span prestressed fabricated prestressed concrete(PC)plane frame were carried out, and the crack development, deformation capacity, failure mode and progressive collapse mechanism were explored. According to the state when the test frame reached the ultimate bearing capacity, a simplified structural resistance analysis model when the side column failed was proposed, and the calculation method of the ultimate bearing capacity of the structure against collapse was deduced. An approximate dynamic response evaluation model was established based on the energy method, and the dynamic response curve of the test frame under transient failure of the side column was approximately obtained according to the static load-displacement curve of the test frame. The results show that the stress process of the frame can be divided into four stages of elasticity, elastoplasticity, plastic hinge and collapse. During loading process, the concrete crack development and failure of the specimen are concentrated in the joint of the beam ends on both sides of the frame beam in the adjacent area of the failed side column. Except for the failed side columns, the other frame columns and the frame beam ends far away from the failed columns are basically intact. In the small deformation stage, the frame is stressed according to the beam mechanism, and there are compression arch action and vierendeel frame action. In the stage of large deformation, it can not be stressed according to the catenary mechanism, the unbalanced load is resisted by the bending mechanism and vierendeel frame action of the beam.When the side column fails, the maximum resistance of the prestressed fabricated PC frame reaches 60.9 kN, the final collapse displacement is 430 mm, and the beam end angle is 10.0°~15.3°, which has good resistance to progressive collapse.

参考文献/References:

[1] PEARSON C,DELATTE N.Ronan Point Apartment Tower Collapse and Its Effect on Building Codes[J].Journal of Performance of Constructed Facilities,2005,19(2):172-177.
[2]AGARWAL J,HABERLAND M,HOLICKY M,et al.Robustness of Structures:Lessons from Failures[J].Structural Engineering International,2012,22(1):105-111.
[3]SASANI M,BAZAN M,SAGIROGLU S.Experimental and Analytical Progressive Collapse Evaluation of Actual Reinforced Concrete Structure[J].ACI Structural Journal,2007,104(6):731.
[4]SONG B I,SEZEN H.Experimental and Analytical Progressive Collapse Assessment of a Steel Frame Building[J].Engineering Structures,2013,56:664-672.
[5]DINU F,MARGINEAN I,DUBINA D,et al.Experimental Testing and Numerical Analysis of 3D Steel Frame System Under Column Loss[J].Engineering Structures,2016,113:59-70.
[6]LI K,WOOD C,SEZEN H.Progressive Collapse Performance of Buildings and the Contribution of Infill Walls[C]//SOULES J G.Structures Congress 2017:Blast,Impact Loading,and Response of Structures.Denver:ASCE,2017:86-97.
[7]易伟建,何庆锋,肖 岩.钢筋混凝土框架结构抗倒塌性能的试验研究[J].建筑结构学报,2007,28(5):104-109.
YI Wei-jian,HE Qing-feng,XIAO Yan.Collapse Performance of RC Frame Structure[J].Journal of Building Structures,2007,28(5):104-109.
[8]吕大刚,崔双双,李雁军,等.基于备用荷载路径Pushover方法的结构连续倒塌鲁棒性分析[J].建筑结构学报,2010,31(增2):112-118.
LÜ Da-gang,CUI Shuang-shuang,LI Yan-jun,et al.Robustness Analysis for Progressive Collapse of Structures Using ALP-based Pushover Analysis Approach[J].Journal of Building Structures,2010,31(S2):112-118.
[9]李 易,陆新征,叶列平.基于能量方法的RC框架结构连续倒塌抗力需求分析Ⅱ:悬链线机制[J].建筑结构学报,2011,32(11):9-16.
LI Yi,LU Xin-zheng,YE Lie-ping.Progressive Collapse Resistance Demand of RC Frame Structures Based on Energy Method Ⅱ:Catenary Mechanism[J].Journal of Building Structures,2011,32(11):9-16.
[10]高佳明,刘伯权,黄 华,等.考虑现浇板作用的钢筋混凝土框架结构抗连续倒塌性能试验[J].长安大学学报(自然科学版),2017,37(6):54-62.
GAO Jia-ming,LIU Bo-quan,HUANG Hua,et al.Experiment on Anti-progressive Collapse Performance of RC Space Frame Considering the Effect of Cast[J].Journal of Chang'an University(Natural Science Edition),2017,37(6):54-62.
[11]钱 凯,李 治,翁运昊,等.钢筋混凝土梁-板子结构抗连续性倒塌性能研究[J].工程力学,2019,36(6):239-247.
QIAN Kai,LI Zhi,WENG Yun-hao,et al.Behavior of RC Beam-slab Substructures to Resist Progressive Collapse[J].Engineering Mechanics,2019,36(6):239-247.
[12]NIMSE R B,JOSHI D D,OATEL P V.Behavior of Wet Precast Beam Column Connections Under Progressive Collapse Scenario:An Experimental Study[J].International Journal of Advanced Structural Engineering,2014,6(4):149-159.
[13]AL-SALLOUM Y A,ALRUBAIDIM A, ELSANADEDY H M,et al.Strengthening of Precast RC Beam-column Connections for Progressive Collapse Mitigation Using Bolted Steel Plates[J].Engineering Structures,2018,161:146-160.
[14]RAVASINI S,BELLETTI B,BRUNESI E,et al.Nonlinear Dynamic Response of a Precast Concrete Building to Sudden Column Removal[J].Applied Sciences,2021,11(2):599.
[15]潘 毅,陈侠辉,姚蕴艺,等.基于抽柱法的无粘结预应力装配式框架结构连续倒塌分析[J].工程力学,2017,34(12):162-170.
PAN Yi,CHEN Xia-hui,YAO Yun-yi,et al.Progressive Collapse Analysis of Unbonded Post-tensioned Precast RC Frame Structures Using Column Removal Method[J].Engineering Mechanics,2017,34(12):162-170.
[16]张望喜,王 雄,刘精巾,等.现浇与装配整体式混凝土空间框架子结构的抗连续倒塌性能试验对比研究[J].建筑结构学报,2020,41(7):81-90.
ZHANG Wang-xi,WANG Xiong,LIU Jing-jin,et al.Experimental Comparative Study on Progressive Collapse Behavior of Cast-in-place and Monolithic Precast Concrete Spatial Frame Substructures[J].Journal of Building Structures,2020,41(7):81-90.
[17]余 洋,李 治,肖龙山,等.边柱失效后预应力拼接连接装配式结构抗连续倒塌机理研究[J].工程力学,2021,38(4):159-168.
YU Yang,LI Zhi,XIAO Long-shan,et al.Load Resisting Mechanism of Precast Structure Under Exterior Column Failure[J].Engineering Mechanics,2021,38(4):159-168.
[18]刘祎霖,李 易,赵子栋,等.装配整体式混凝土框架结构抗连续倒塌试验研究[J].建筑结构学报,2022,43(6):117-127.
LIU Yi-lin,LI Yi,ZHAO Zi-dong,et al.Experimental Study on Precast Concrete Frames with Monolithic Joints to Resist Progressive Collapse[J].Journal of Building Structures,2022,43(6):117-127.
[19]柳炳康,田井锋,张瑜中,等.低周反复荷载下预压装配式PC框架延性性能和耗能能力[J].建筑结构学报,2007,28(3):74-81.
LIU Bing-kang,TIAN Jing-feng,ZHANG Yu-zhong,et al.Behavior of Ductility and Energy Dissipation of Prestressed Precast Concrete Frame Under Low-cyclic Reversed Loading[J].Journal of Building Structures,2007,28(3):74-81.
[20]柳炳康,黄慎江,宋满荣,等.预制预应力混凝土装配整体式框架拟动力试验研究[J].地震工程与工程振动,2010,30(5):65-71.
LIU Bing-kang,HUANG Shen-jiang,SONG Man-rong,et al.Pseudo-dynamic Research on Post-tensioned Precast Prestressed Concrete Frame[J].Earthquake Engineering and Engineering Dynamics,2010,30(5):65-71.
[21]柳炳康,黄慎江,宋满荣,等.预压装配式预应力混凝土框架抗震性能试验研究[J].土木工程学报,2011,44(11):1-8.
LIU Bing-kang,HUANG Shen-jiang,SONG Man-rong,et al.Experimental Study of Seismic Performance of Prestressed Fabricated PC Frames[J].China Civil Engineering Journal,2011,44(11):1-8.
[22]柳炳康,宋满荣,蒋亚琼,等.预制预应力混凝土装配整体式框架抗震性能试验研究[J].建筑结构学报,2011,32(2):24-32.
LIU Bing-kang,SONG Man-rong,JIANG Ya-qiong,et al.Experimental Study on Seismic Performance of Post-tensioned Precast Prestressed Concrete Frame[J].Journal of Building Structures,2011,32(2):24-32.
[23]柳炳康,宋满荣,黄慎江,等.三层预压装配式预应力混凝土框架抗震性能试验研究[J].建筑结构学报,2011,32(9):99-106.
LIU Bing-kang,SONG Man-rong,HUANG Shen-jiang,et al.Experimental Study on Seismic Performance of Three Story Post-tensioned Precast RC Frame[J].Journal of Building Structures,2011,32(9):99-106.
[24]宋满荣.单跨三层预压装配式预应力混凝土框架抗震性能试验与理论研究[D].合肥:合肥工业大学,2015.
SONG Man-rong.Experimental and Analytical Study of Seismic Performance on Single-span Three-story Prestressed Fabricated PC Frame[D].Hefei:Hefei University of Technology,2015.
[25]刘 元.中柱拆除时预压装配式预应力混凝土框架抗连续倒塌性能试验研究[D].合肥:合肥工业大学,2019.
LIU Yuan.Experimental Study on Progressive Collapse-resisting Performance of Prestressed Fabricated PC Frame After the Removal of the Middle Column[D].Hefei:Hefei University of Technology,2019.
[26]刘辰谱.边柱拆除时预压装配式预应力混凝土框架抗连续性倒塌性能试验研究[D].合肥:合肥工业大学,2020.
LIU Chen-pu.Experimental Study and Analysis on Progressive Collapse-resisting Performance of Prestressed Fabricated PC Frame After the Removal of the Exterior Column[D].Hefei:Hefei University of Technology,2020.
[27]宋满荣,刘 元,何嘉轩.预压装配式预应力混凝土框架抗连续倒塌数值分析[J].合肥工业大学学报(自然科学版),2021,44(1):73-78.
SONG Man-rong,LIU Yuan,HE Jia-xuan.Numerical Analysis on Progressive Collapse Resistance Performance of Prestressed Fabricated PC Frame[J].Journal of Hefei University of Technology(Natural Science Edition),2021,44(1):73-78.
[28]车 轶,王金金,郑新丰,等.反复荷载作用下高强混凝土梁受弯性能尺寸效应试验研究[J].建筑结构学报,2013,34(8):100-106.
CHE Yi,WANG Jin-jin,ZHENG Xin-feng,et al.Experimental Study on Size Effect of Flexural Behavior of Reinforced High-strength Concrete Beams Subjected to Cyclic Loading[J].Journal of Building Structures,2013,34(8):100-106.
[29]颜伟华.自密实混凝土梁正截面受弯性能试验研究[D].哈尔滨:哈尔滨工业大学,2007.
YAN Wei-hua.Experimental Research on Flexural Performance of Self-compacting Concrete Beams[D].Harbin:Harbin Institute of Technology,2007.

相似文献/References:

[1]黄 远,陈桂榕,胡晓芳.装配整体式结构抗连续倒塌受力机制及 影响因素分析[J].建筑科学与工程学报,2019,36(04):31.
 HUANG Yuan,CHEN Gui-rong,HU Xiao-fang.Force Mechanism and Influencing Factors of Precast Monolithic Structures to Resist Progressive Collapse[J].Journal of Architecture and Civil Engineering,2019,36(03):31.
[2]肖建庄,张文泽,刘堡嘉,等.城市中心区高层建筑绿色拆除方法[J].建筑科学与工程学报,2021,38(01):23.[doi:10.19815/j.jace.2020.05043]
 XIAO Jian-zhuang,ZHANG Wen-ze,LIU Bao-jia,et al.Investigation on Green Demolition of High-rise Buildings in City Center Areas[J].Journal of Architecture and Civil Engineering,2021,38(03):23.[doi:10.19815/j.jace.2020.05043]
[3]黄华,刘笑笑,黄敏,等.工程结构连续倒塌破坏及性能提升技术研究现状[J].建筑科学与工程学报,2022,39(03):29.[doi:10.19815/j.jace.2021.12096]
 HUANG Hua,LIU Xiao-xiao,HUANG Min,et al.Research Status on Progressive Collapse of Engineering Structure and Performance Improvement Method[J].Journal of Architecture and Civil Engineering,2022,39(03):29.[doi:10.19815/j.jace.2021.12096]
[4]王景玄,李秋颖,王文琦.圆钢管混凝土柱-钢筋桁架组合梁节点抗连续倒塌机制及参数分析[J].建筑科学与工程学报,2022,39(03):84.[doi:10.19815/j.jace.2021.05040]
 WANG Jing-xuan,LI Qiu-ying,WANG Wen-qi.Anti-progressive Collapse Mechanism and Parameter Analysis of Circular CFST Column and Steel Bar Truss Composite Beam Joint[J].Journal of Architecture and Civil Engineering,2022,39(03):84.[doi:10.19815/j.jace.2021.05040]
[5]刘传平,吴邑涛,杨兴据,等.基于多尺度建模的高铁站雨棚结构抗连续倒塌分析[J].建筑科学与工程学报,2022,39(03):92.[doi:10.19815/j.jace.2021.07060]
 LIU Chuan-ping,WU Yi-tao,YANG Xing-ju,et al.Analysis on Progressive Collapse Resistance of Canopy Structure of High-speed Railway Station Based on Multi-scale Modeling[J].Journal of Architecture and Civil Engineering,2022,39(03):92.[doi:10.19815/j.jace.2021.07060]
[6]谭光伟,胡淑军,黄 华,等.机械套筒连接预制混凝土结构抗连续倒塌机理[J].建筑科学与工程学报,2022,39(05):32.[doi:10.19815/j.jace.2022.08007]
 TAN Guang-wei,HU Shu-jun,HUANG Hua,et al.Progressive Collapse Mechanism of Precast Concrete Structures Assembled with Mechanical Couplers[J].Journal of Architecture and Civil Engineering,2022,39(03):32.[doi:10.19815/j.jace.2022.08007]

备注/Memo

备注/Memo:
收稿日期:2021-12-13
基金项目:国家自然科学基金项目(51608159)
作者简介:宋满荣(1978-),女,安徽池州人,副教授,工学博士,E-mail:songmanrong@hfut.edu.cn。
通信作者:黄慎江(1964-),男,江苏靖江人,副教授,工学博士,E-mail:huangsj000@hotmail.com。
更新日期/Last Update: 2022-05-30